• Walkthrough Frame System Scaffolding  Steel Surface Treatment System 1
  • Walkthrough Frame System Scaffolding  Steel Surface Treatment System 2
  • Walkthrough Frame System Scaffolding  Steel Surface Treatment System 3
  • Walkthrough Frame System Scaffolding  Steel Surface Treatment System 4
  • Walkthrough Frame System Scaffolding  Steel Surface Treatment System 5
  • Walkthrough Frame System Scaffolding  Steel Surface Treatment System 6
Walkthrough Frame System Scaffolding  Steel Surface Treatment

Walkthrough Frame System Scaffolding Steel Surface Treatment

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description

 

 

Why choose us

 

1. professional scaffold manufacturer
2. timely delivery
3. authorty certification
4. technical support

5. 8 years' experience

6. 6S management

 

 

 

 Walkthrough Frame System Scaffolding  Steel Surface Treatment

products size :

 

standard 48.3*3.2 mm

 

ledger     48.3*3.2mm

 

brace      48.3*2.5mm

 

Any size can be specificed


 

 

 

 

 

Packaging & Shipping

 

We ensure your goods can be delivered safely:

 

 1.Experienced packer and technician

 

2.Standard rack

 

3.Long-term cooperative freight forwarding and shipping company 

 

 

Walkthrough Frame System Scaffolding  Steel Surface Treatment

 

 

 

 

 

Our Services

 

Rapid Scaffolding takes pride in offering a team of highly experienced and suitably qualified engineering and technical experts. According to different requests from all our customers, we can provide a whole range of scaffolding and formwork designing, we also provide the total solutions for any project.

 

 

 

Walkthrough Frame System Scaffolding  Steel Surface Treatment  

 

 

 

 

 

Company Information

 

Certificates

As a professional scaffolding manufacturer for years' experience in China, we have obtained many certification authority, including ISO9001:2008, ISO14000, CE,  OHSAS18000 and our products are also tested to meet USA standard (ANSI A10.8), Australia/New Zealand standard, Japanese standard.

 

 

 

Walkthrough Frame System Scaffolding  Steel Surface Treatment  

 

 

 

 

 

Inspection

 

We have a strict quality control system based on the security awarness and the practice. According to the requirements of ISO9001:2008, we examine the products through the whole production from the raw material to the final products.

 

 

 

 

 

Walkthrough Frame System Scaffolding  Steel Surface Treatment

 

 

 

 

 

FAQ

 

What we are doing to ensure the high quality?

 

 1. Introducing quality assurance into projects at the earliest stage by continued planning, including comprehensive inspections.

 

 2.Maintaining the highest level of employee skills by the continual assessing and training of all employees.

 

 3. Maintaining a working environment based upon trust, respect, teamwork at all levels within the company.

 

 4. Effectively communicating and encouraging feedback with our clients, sub-contractors, suppliers and consultants to constantly improve our quality and compliance standards.

 

 5. A professional quality control team involves in everyday production.

 

 

Walkthrough Frame System Scaffolding  Steel Surface Treatment

 

 Any interest or questions,welcome to contact us.

 

Any inquiry will be replied within 24 hours.


Q: Okay I have some questions:-When I get it done can I have- 2 labret retainers put in to hide them from my school?-If I can, how discreet are the retainers?-How long to heal? (Even though the piercer will tell me)-Have you got a picture of a scaffolding piercing with retainers? May I see it (:-And a basic clear cleaning regime?Thankyous (: x
Im pretty sure you can have retainers for your industrial piercing if you get it done buuuuut you wont be able to put them in for a couple months cause industrials take a long time to heal. And like the person said below it really depends on your skin tone and what color retainer you buy. You shouldnt have a problem with the industrial though cause people cant see mine if I have my hair down. They take up to 1 year to fully heal. You can swap your piercings out after 3 months but beware it can close up on you if you have difficulty putting it in. You HAVE to wait 3 months before you can put retainers in. Industrials are 14g piercings so make sure your retainers are the right gauge. Your ear will be sore for a long time dear. Mine didnt hurt while getting it pierced cause I have a high pain tolerance but my ear was sore and bruised afterwards. The healing process is very delicate and your ear will be sore for a couple months. Make sure you get the piercing on the ear you dont sleep on. I use a 50/50 solution of Betadine and distilled water. Other piercers have different cleaning regimes though, so listen to your piercer. I always clean it with warm water and use a Q-tip to clean around the piercing. Then I put the cleaning solution on and twist the piercing around GENTLY so the solution will go into the cartilege. I do this 3 times a day and i will do it for a month. Industrials are really delicate piercings so always keep it clean :)
Q: how much does a scaffold/industrial piercing cost in the US????i really want one. i know it'll probably hurt.do i have to go to a tattoo/piercing place to get it?i live in europe and here it costs 70 euros which is like $105ish. don't want to pay that much.
the place i went to it cost about 60 dollars. i live in northern illinois. it depends on where you go tho. different shops will have different prices.
Q: I got my scaffolding piercing today, inevitably it's sore,but do i clean it like you would clean normal piercings with salt water?also how long before i can turn the bar?and how long before i can change the bar?Plus. it hurt so much haha
do no longer rotate it and end utilising hydrogen peroxide in basic terms use heat water blended with sea salt or anti-bacterial cleansing soap(dial),saline answer(touch purifier),h20ocean piercing spray discovered at hottopic. you are able to turn the bar to scrub it to get the different area clean yet never rotate it. it's going to make the piercing healing technique alot slower and it ought to reason issues.
Q: I've pierced my ears a few times myself, but never through the cartilage.I want to know from anyone who has a scaffold piercing, if it hurts?Cause I'm getting it done in 25 days.Thanks in advance x
I had my cartilage pierced a few times in training and it doesnt hurt, its more the after pain that is most irritating, just take paracetamol!
Q: Bowl buckle scaffold is not a pipe fitting scaffold
The buckle of the bowl buckle scaffold can be welded with a bowl buckle, and the node is mainly fixed by a bowl buckle
Q: How come wwe doesn't have any barb wire rope or scaffold match?
Those type of matches can take years off a wrestlers career. If WWE shorterns their wrestlers careers then they can't make as much money off of them. American promotions that do that only do that to be different from WWE, and to try to draw attention since most of them can't match WWE's wrestling. Promotion from different countries do those type of matches for different reason though.
Q: A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold. If the plank's mass is 20kg , how close to the left end of the plank can he stand without tipping the plank? ( The scaffold supports are 2.5m apart, and the plank extends beyond the scafold supports, 1.5m on each end.)
The mass of the plank on the left side of the scaffold is: M? = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L? = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T? = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M? = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L? = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T? = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T? = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q: Why do a mobile tower scaffolds have wheels fitted with brakes?
So it can be partially assembled, moved into position, then the brakes are put on so it doesn't move while it's in use.
Q: I'm wanting a scaffold piercing so i can wear it with a bar or 2 rings. Could i get it PIERCED with the 2 rings to begin with or do i have to have a bar for the first few weeks/months?
My friend wanted the same thing done so she asked the piercer and he pierced one side of her top ear first and a week later she went back and got the other side pierced. She got used to the rings being in for 2 weeks and then put a bar in. Beware though as the bar that is put into your ear can make your skin grow around it, I still have two lumps on my ear from where the piercing went dodgy and so has my friend. I want it done again though! :)
Q: Why not connected with the bracket or arch construction scaffolding
The following points of city bridge fabrication and installation of template, bracket and arch:1 the contact surface between the template and concrete should be smooth and tight. Production, composite steel formwork installation should be consistent with current national standards "GB50214" technical specification for composite steel formwork; matched panel plywood formwork with steel frame should be staggered layout; polymer panel, hard plastic or glass steel formwork shall be firmly connected with the side ribs and reinforcing ribs; soil, brick etc. mould making should be smooth, solid, mould surface should be flat and smooth; arch bridge construction, in appropriate conditions can be used on the arch tyre, but should not be used on the arch of fetal period.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords