• Villas de Actividades de La Junta para Construccion de Casa System 1
  • Villas de Actividades de La Junta para Construccion de Casa System 2
  • Villas de Actividades de La Junta para Construccion de Casa System 3
Villas de Actividades de La Junta para Construccion de Casa

Villas de Actividades de La Junta para Construccion de Casa

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
50 pc
Supply Capability:
1000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Villas de Actividades de La Junta para Construccion de Casa CE Certificado

Detalle rápida:

Nombre

Villa Prefabricada

Aplicacion

Villa para vivir

Color

optado

Caracteritica

1.quickly to assemble on site;

2.good earthquake proof;

3.green,and energy save;

Materiallight steel and other decorate materials

Certificate

CE,ISO,SAA,ETC


Descripción:

Estructura principal: acero de calibre ligero

Material de la pared: El panel ALC / fibra de revestimiento de cemento + tabla MGO / placa de yeso

Material de aislamiento: material de aislamiento

Material del techo: MGO bordo / placa de yeso

/ Base material de suelo: suelo laminado / alfombra de madera / PVC

Puerta: puerta de seguridad de acero / WPC o de la puerta de madera contrachapada

Ventana: aleación de aluminio / PVC

Techos: EPS panel sándwich / cubierta de acero / asfalto de guijarros

Otros accesorios: inodoro, lavabo, ducha, cocina, etc.

Tiempo de vida: 100 años para la estructura

Aplicaciones:

Casa, Oficina, Villa, etc.

Especificaciones:

Descripción Del Producto

Acero DeepBlue chalet prefabricado estructural se basa en la luz sistema de marco de acero de calibre con materiales de acabado de alto rendimiento. Toda la casa se puede montar dentro de par de horas por 4workers. los materiales son los siguientes:

1. Principal estructura: calibre ligero sistema de armazón de acero de 89 mm basado en AS / NZS 4600 estándar. la estructura puede ser de diseño para resistir el viento y sismo 9degree 50m / s.

2. Estructura de techo: 89 mm de calibre ligero sistema de vigas de acero.

3. Chasis: 89mm de calibre ligero chasis de suelo de acero

4. suelo: 18 mm tablero de fibrocemento con barrior vapor y pisos de bambú o pisos de madera, alfombra pvc etc.

Revestimiento 5.Wall: 16mm PU de acero con aislamiento de panel sándwich con una bella decoración

6. forro interior: 9m tablero de fibra de cemento, a prueba de agua, a prueba de termitas, la seguridad y la salud

7. techo: panel de techo del pvc 8mm

8. aislamiento: aislamiento de lana de vidrio de 89 mm con un rendimiento a prueba de buen sonido.

9.windows: PVC ventanas correderas

Puerta 10.exterior: aluminim alta calidad ventanas correderas

Puerta 11.interior: pintado puerta de madera

12.bathroom: ducha, lavabo, inodoro inculded

13. techos: tejado de acero corrugado con sistema de canalones

14. deck terraza: pisos terraza W.P.C.

ISO de acero de calibre ligero estándar para structure.fireproof principal, aislamiento de calor, el viento y resistance.green terremoto, de ahorro de energía. también económicamente.

¿Por qué elegir la estructura de acero de calibre ligero?

1) Vida útil de la estructura:. 100 años [0.75 ~ 1.2mm, perfil de acero Z275galvanized, fuerza: 550Mpa]

2) Resistencia sísmica: mezclar más de 8 grados.

3) la resistencia del viento: máx 60 m / s.

4) Resistencia al fuego: todos los materiales utilizados pueden ser la resistencia al fuego.

5) La resistencia de nieve: max 2.9KN / m²as requeridos

6) Aislamiento térmico: 100 mm de espesor pueden igualar 1 m de espesor de pared de ladrillo.

7) Alto aislamiento acústico: 60db 40db de la pared exterior de la pared interior

8) la prevención de insectos: Libre de los daños por insectos, como las hormigas blancas

9) Ventilación: una combinación de ventilación natural o el suministro de aire a mantener el fresco aire interior y limpio

10) Embalaje y entrega: contenedor 140 m / 40'HQ para la estructura única y contenedor de 90 metros cuadrados / 40'HQ para la estructura con materiales decorar.

11) Instalación: el promedio es de un trabajador de un día instalar uno SQM.

12) Instrucciones de montaje: Ingeniero de despacho para guiar en el sitio.

 FAQ

We have organized several common questions for our clients,may help you sincerely:

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customers requirements.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served.


Q:What is a villa class real estate development project?
Villa real estate is home to enjoy the living outside the home, is the second place rather than the first home
Q:What is the number of years of row of villas?
Under normal circumstances are 70 years, the villa is a real estate license and land certificate
Q:What is the thickness of the villa's floor and the maximum load it can bear?
so as long as the roadside is not scratched to do the design, you no matter how the allocation of steel, the floor carrying capacity is definitely 2 kN
Q:What does the quadruple villa mean?
Township villa with Shuangpin, four, six, and so on. Shuangpin is two suites share a gable, quadruple is four sets together
Q:How to build self-built villa?
Second, apply for land to build land, it is best miscellaneous. Agricultural land to the first agricultural specia
Q:What are the characteristics and requirements of villa property management?
for the property customer service staff and engineering staff in the provision of services for the owners must be more standardized for the owners What is urgent?
Q:Why is someone called him called "Do not wild?
1 is not wild, is the "villa" another title, perhaps some people first saw the "villa" rhetoric, because of wrong or do not understand and read wrong.
Q:Villa playing floor with which method is good?
which determine the scope of the loft and elevation have a direct impact.
Q:How to design villa lightning protection system?
the selection of construction materials and quality requirements: for the connection of reinforced concrete columns and the bottom of the ?16 round bar
Q:Villa (self-built buildings) feng shui to pay attention to what?
1. Villa houses can not be built on the ridge, or the valley of the entrance, or not only can not get the geographical Fukuzawa

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords