Utility ESS Lithium-ion LFP Battery Container Energy Storage System 2.58/3.01/3.44MWH Customized MWH
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 SET
- Supply Capability:
- 1000000 SET/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Utility ESS Lithium-ion LFP Battery Container Energy Storage System 2.58/3.01/3.44MWH Customized MWH
1.Lithium iron Phosphate battery Proven track record
2.System charging and discharging efficiency>90%
3.The battery cycle life under energy storage conditions exceeds 6000 cycle
4.Integrate high-speed communication, power distribution and metering, AC output adopts 2-level controllable switch + passive protection
5.Adopt high-current high-efficiency two-way active equalization technology to eliminate series losses caused by inconsistent batteries
6.Modular design, indoor or outdoor, space efficient
Product Description
CFE main technical indicators | |||
Serial number | Index | ||
System nominal | |||
Rated power | 500KW | 1000 KW | 1000 KW |
Nominal capacity | 2580KWh | 3010 KWh | 3440 KWh |
Communication side | |||
Rated voltage | 380V | 380V | 380V |
Rated current | 759A | 1500A | 1500A |
Rated frequency | 50HZ | 50HZ | 50HZ |
Power factor | >0.98 | >0.98 | >0.98 |
Wiring | Three-phase three-wire | Three-phase three-wire | Three-phase three-wire |
Isolation transformer | 630KVA | 1250KVA | 1250KVA |
Inrush current | Less than 7 times Ie | ||
Harmonic distortion rate | Less than 3% (secondary side of transformer) | ||
DC side | |||
Rated voltage | 768V | 768V | 768V |
Lower limit voltage | 600V | 600V | 600V |
Upper limit voltage | 876V | 876V | 876V |
Rated current | 650A | 1300A | 1300A |
Cell specifications | 280Ah | 280Ah | 280Ah |
Number of batteries | 2880 | 3360 | 3840 |
Number of modules | 180 | 210 | 240 |
Module specifications | 1P16S | 1P16S | 1P16S |
Actual capacity | 2580KWh | 3010KWh | 3440KWh |
Battery management | |||
Cluster battery | 12 | 14 | 16 |
Cluster unit | 12 | 14 | 16 |
Voltage accuracy | 0.002 | 0.002 | 0.002 |
Temperature accuracy | 0.01 | 0.01 | 0.01 |
SOC accuracy | 0.05 | 0.05 | 0.05 |
Power accuracy | 0.01 | 0.01 | 0.01 |
Cabinet | |||
Battery cabinet | 966*855*2400mm | 966*855*2156mm | 966*855*2156mm |
Control cabinet | 2000*600*700mm | 2000*600*700mm | 2000*600*700mm |
PCS cabinet | 1400*825*2180mm | 1400*825*2180mm | 1400*825*2180mm |
Air conditioning | |||
Installation method | Embedded | Embedded | Embedded |
Cold power | 30KW | 30KW | 30KW |
Fire control | |||
Fire fighting medium | Heptafluoropropane | ||
Spray method | Pipeline (battery room) | ||
Fire detection tube (PCS room) | |||
Communication Interface | |||
Wireless | 2G,1 minute update | ||
Wired | Network, 5 seconds update | ||
System cycle life | >6000Cycle(25℃) | >6000Cycle(25℃) | >6000Cycle(25℃) |
Capacity availability | >80% | >80% | >80% |
Weight | <20T | <41T | <45T |
Structure size | 12.192m*2.438m*2.591m | 12.192m*2.438m*2.591m | 12.192m*2.438m*2.591m |
FAQ
CFE Lithium-ion Battery
Q: What kind of battery you can provide?
A: a.12.8V-25.6V 30Ah/40Ah/50Ah/100Ah//200Ah LFP battery for replacement of Lead-acid/Gel battery.
b. 51.2V 50Ah/100Ah LFP battery module for residential energy storage with cube (10,15,20 kwh).
c. Solar hybrid inverters with power 4,5,6,8,10,12kw, solar off grid inverter 3,5 kw.
d. Inverter & Battery ALL IN ONE, with capacity 5,10,15,20 kwh.
e. E-mobility battery for E-scooter, E-bus, E golf cart etc.(Rank Top 3 in China).
f. 48V 50A/100AH/150AH/200AH LFP Battery for Telecom-towers.
Q: What is the capacity of production?
A: CFE has 13 production lines with a total capacity of 12Gwh for both storage and E-mobility.
Q:How long is the warranty period?
A: Our limited warranty is valid for a period 5 years (12.8V products) /10 years (51.2V products) after delivery. It is restricted by specifications and warranty terms.
Q: How long is the estimated delivery time?
A: The delivery time is within 25 days after receiving the payment.
Q: Are you able to handle shipment transportation?
A: We can arrange the shipment to most places as required.
Q: What kind of certification do you have?
A: We have SGS, TÜV, IEC 62040-1, IEC 62109-1, IEC 62109-2, IEC 62619, UN38.3, IEC 62133, CEC, UL, MSDS, ISO 9001 certifications, but each product may be different.
Q: What kind of product quality your factory offer?
A: We provide the most competitive products at the highest quality. (100% cell sorting test under inner resistance ≦2mΩ, voltage differ ≦ 2mV,100% EOL test, 100 % aging, 100% final product testing) .
Q: Can we print our logo on products?
A: We can provide one to one customized OEM with a MOQ demand.
Q: What is the validity of the quotation?
A: Due to the raw material price fluctuation, the quotation validity is 10 days.
- Q: How to repair the battery?
- Pry open the adhesive or heat-sealed battery cover, reveal the maintenance-free battery rubber exhaust valve, carefully remove the exhaust valve, save, observe the battery internal situation. Add 0.1% to 0.5% of the electrolyte to the battery, just to the battery above the flow of electrolyte. At the same time, check whether the black impurities, if there are obvious black turbid impurities, indicating that the battery plate has been significantly softened, the possibility of battery repair is relatively small. If there is no black muddy impurities, need to wait 4 hours later, the water fully into the battery. If it is only because the deactivation time is long and cause the battery capacity to decline, do not need to carry out this step operation, should go directly to step 3 pre-charge.
- Q: How is the capacity of the battery defined?
- The capacity of the battery unit is AH (safety) is the product of current and time.
- Q: What is the difference between a maintenance-free battery and a conventional battery?
- Different materials will produce a different phenomenon: the traditional battery in the course of the use of the phenomenon of liquid reduction occurs, because the antimony on the grid will pollute the sponge on the negative plate of pure lead, weakened after the full charge of the battery Electromotive force, resulting in excessive decomposition of water, a large number of oxygen and hydrogen, respectively, from the positive and negative plates to escape, so that the electrolyte reduced. With calcium instead of antimony, you can change the fully charged battery back electromotive force, reduce the overcharge current, liquid gasification rate decreases, thereby reducing the loss of electrolyte.
- Q: How to deal with waste batteries?
- The rest of the various types of waste batteries are generally shipped to a special toxic, hazardous landfill, but this approach not only cost too much but also cause waste, because there are many useful raw materials available.
- Q: What are the hazards of battery over discharge?
- When the battery discharge current is large, the heat will become more obvious, there will be serious heat generated when the battery deformation, when the concentration of lead sulfate is particularly large, will form a larger crystal particles, that lead to the battery Internal irreversible sulfation.
- Q: Maintenance-free battery how to detect it?
- When using a maintenance-free battery, it is easy to think that maintenance-free is the idea that no maintenance is required. Maintenance-free Although maintenance costs and times can be reduced, but for the appearance of the clean-up is essential, so that "maintenance-free" more point to the battery inside.
- Q: What are the advantages of maintenance-free batteries?
- Maintenance-free battery because of its normal charging voltage, the electrolyte only produce a small amount of gas, so throughout the use of the need for the addition of distilled water, in the normal charging system, do not need to remove the charge from the removal. But in the maintenance of the proportion of its electrolyte should be checked.
- Q: How does the battery increase the voltage?
- You can use the same battery in series, with 5 12v battery in series becomes 60v, if you need the current is relatively small, you can use DC-DC module to 12v voltage rise to 60v.
- Q: What is a maintenanceable battery?
- It also has a shock, high temperature, small size, self-discharge characteristics. Life is generally twice the ordinary battery.
- Q: Battery 200ah / 104 what does that mean?
- This should be refers to 2V200AH battery 104, power with the 220V. Lead-acid battery nominal voltage is 2V / (each or monomer), but in fact will be higher than 2V, so the actual use and charging equipment for the matching will use 104, also useful 103, also useful 108 Only.
Send your message to us
Utility ESS Lithium-ion LFP Battery Container Energy Storage System 2.58/3.01/3.44MWH Customized MWH
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 SET
- Supply Capability:
- 1000000 SET/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords