Used Ringlock Scaffolding Q235/353 Steel Galvanized
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 10000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ring Lock system is the latest item up to now. It’s mainly used in ship building, ship repairing, stage building etc.It’s stable, easy-assemble, easy working, safe-using and with big bearing capacity.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Product Show
The modular RINGSCAFF system is characterised by the standardised, fast and simple assembly outlined above.
These procedures are continually repeated in the assembly of the scaffold.
In this way, as many as four ledgers and four diagonals can be attached to one ring! This creates a connection point which can bear very heavy loads.
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
- Q: An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
- Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
- Q: In the process of high-rise building construction, bowl buckle type steel pipe scaffolding foundation and foundation treatment should meet the requirements
- In fact, the construction of high-rise building scaffolding over a certain height, should be carried out economic comparison, otherwise, the height of a one-time erection is too high, the cost will be high.
- Q: Bowl buckle scaffold is not a pipe fitting scaffold
- Bowl buckle scaffold with steel scaffolding is different
- Q: What are the specifications for the setting of the wheel - fastener scaffold
- Technical code for safety of steel tubular scaffold with couplers in construction
- Q: Everybody calls it either one, i want the one that goes across the top of your ear. Would it be safer to have two helix done instead of putting the bar straight in and getting the actual piercing or should i get two helix and put a bar in once it has healed? i would ask the piercer to line the two up. ive heard that industrails go wrong alot if a bar is put right in.
- As long as the bar's the correct length (long enough to accomodate a little bit of swelling, but not too long), and you have a good piercer, you shouldn't have a problem. Getting two and then changing to a bar later also costs twice as much money :P
- Q: is scaffolding a trade that i could emigrate to australia with?
- I'm not sure about the immigration regulations, but there's plenty of work for scaffolders, riggers, plant operators etc. Good money too! (maybe look at an allied trade to mark in the box on the forms, as there's definately a skill shortage in Oz.)
- Q: the council has put non alarmed scaffolding on our flats and I have already seen a strange man climbing up. Will my insurance still be valid if a thief uses the scaffolding to break into my home?
- Does your insurance have a 'warrant' about scaffolding requiring an alarm, or your flat requiring an alarm? If not, no. Lock your windows.
- Q: hat is the safest height for static internal scaffolding towers?
- i think 0.00 mm would be safer
- Q: Basically iv had my scaffold for around 2 years, it is completely healed. About six months ago i had to take the single bar out and put two separate bars in, i went to the shop i had it done at and they sold me two clear labret bars, at the time i did not realise that these were much thinner than my normal bar and because after time they became brittle and discoloured i changed them to two metal eyebrow bars as a short term solution, i need some advice on what to do regards changing back to a single scaffold bar, i would like to freely be able to change between a single bar and two bars/hoop, but im sure it would cause too much damage to my ear and too much pain to keep stretching it to a scaffold bar to then let it go down and stretch it again i will be needing a single bar at weekends not in the week, what should i do?
- What you should do is stop drinking bong water.
- Q: What is the size of the bowl buckle scaffold?
- lg-120 1200 7.41lg-180 1800 10.67lg-240 2400 14.02lg-300 3000 17.31
Send your message to us
Used Ringlock Scaffolding Q235/353 Steel Galvanized
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 10000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords