Underground GRP engineering pipe DN600
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Underground GRP pipe/ FRP pipe
FRP winding pipe characteristics
1. Good physical mechanics performance
2. Being resistant to chemical erosion and longer service life
3. Excellent hydraulic characteristics
4. Lower installation and keeping cost
5. Flexible design and shorter reform term
6. No medium pollution
FRP pipe classification by application field
1.Chemical medium transportation pipe
2.Various producing process pipe (chemical process, paper making process, polluted water treatment process, sea water purifying process, food and drink producing process, and medicine producing process)
3.Pressure pipe for small hydroelectric power station on the ground and cycling pipe for power plant
4.Polluted water collecting and transporting pipe
5.Drink water transporting main line and tubing pipe
6.Oil field water injecting pipe and oil transporting pipe
7.Heat transporting pipe and sea water transporting pipe
8.Agricultural irrigation pipe
9.FRP set (ventilation, air-conditioner, chimney, cleaner) and piping
10.Gas drainage pipe for mine
FRP pipe classification by pressure in working state
1.Medium and low pressure pipe 0.6MPa2.5 MPa
2.High pressure pipe5.5MPa24 MPa
3.Mobile gravity pipe (which can be used when the pressure is under 0.6MPa)
4.Vacuum tube, external pressure pipe or siphon
If you have interest in the FRP pipe, please provide the following parameters: media, pressure and the use of the environment (overhead or buried), temperature, stiffness requirements, connections, we shall provide you most competitive price. Looking forward to our cooperation!
- Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
- No, polycyclic aromatic should be anthraquinone This is certainly not all of the hydrocarbons are carcinogenic
- Q: Air to water heater host and air conditioning host is not the same
- Issued a test report, Detection can be used to pass, failed to use!
- Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
- Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound
- Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
- Can be small, according to your roof to do what material.
- Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
- You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
- Q: What is the whole heat exchange fresh air ventilator?
- Depends on the main control panel is not cold and warm, single cold common motherboard. Only a generic motherboard can be changed. In the single cold air-conditioning on the outdoor machine to install the appropriate specifications of the four-way valve, adjust the amount of refrigerant to the appropriate level can be.
- Q: External wall insulation method of operation There are several combinations of materials
- Seeking the existing building construction specifications Daquan! The The @
- Q: Ventilation is very good, why still have to install fresh air system
- You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
- Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
- Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
- Q: HVAC Heating: What are the main components of the air distribution system?
- (HS Code) Yes, the tax rebate is 13% (April . 2009 latest data). Floor of the board of the tax number is, the tax rebate is 9% (June . 2009 the latest data), floor board is the inspection of goods, exports need to be checked. There is nothing to understand where to add me MSN:
Send your message to us
Underground GRP engineering pipe DN600
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords