• Underground GRP engineering pipe DN1600 System 1
  • Underground GRP engineering pipe DN1600 System 2
  • Underground GRP engineering pipe DN1600 System 3
Underground GRP engineering pipe DN1600

Underground GRP engineering pipe DN1600

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


Underground GRP pipe/ FRP pipe

FRP winding pipe characteristics

1. Good physical mechanics performance

2. Being resistant to chemical erosion and longer service life

3. Excellent hydraulic characteristics

4. Lower installation and keeping cost

5. Flexible design and shorter reform term

6. No medium pollution

FRP pipe classification by application field

1.Chemical medium transportation pipe

2.Various producing process pipe (chemical process, paper making process, polluted water treatment process, sea water purifying process, food and drink producing process, and medicine producing process)

3.Pressure pipe for small hydroelectric power station on the ground and cycling pipe for power plant

4.Polluted water collecting and transporting pipe

5.Drink water transporting main line and tubing pipe

6.Oil field water injecting pipe and oil transporting pipe

7.Heat transporting pipe and sea water transporting pipe

8.Agricultural irrigation pipe

9.FRP set (ventilation, air-conditioner, chimney, cleaner) and piping

10.Gas drainage pipe for mine

FRP pipe classification by pressure in working state

1.Medium and low pressure pipe 0.6MPa2.5 MPa

2.High pressure pipe5.5MPa24 MPa

3.Mobile gravity pipe (which can be used when the pressure is under 0.6MPa)

4.Vacuum tube, external pressure pipe or siphon

If you have interest in the FRP pipe, please provide the following parameters: media, pressure and the use of the environment (overhead or buried), temperature, stiffness requirements, connections, we shall provide you most competitive price. Looking forward to our cooperation!


Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
No, polycyclic aromatic should be anthraquinone This is certainly not all of the hydrocarbons are carcinogenic
Q: Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q: US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Embedded stove, such as the use of rubber tube connection, then the rubber tube in the platen, often subject to heat radiation easily aging; and aging, falling more difficult to find, so many local poisoning and other vicious accidents
Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Extruded board of course, can generally use this to do, indoor and outdoor to do almost, most of the outside is done because of saving space inside the room. Recommended: do indoors, because I was doing the external walls, the insulation often do, the wall is not very good for the first time, because you do before the insulation wall itself is the weight of the valve valve closure of the bone shop stall wipes , Benzene board sticky benzene board is not very strong, live well for a few years, bad two or three years there will be signs of shedding, looking twice thinking.
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.
Q: Air conditioning machine work when the sound is too much reason
Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
Q: External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Polystyrene should not be polycyclic aromatic. Polycyclic aromatic groups generally refer to aromatic groups when multiple benzene rings are used. Not all of the hydrocarbon chemical products are carcinogenic, and our bodies are producing hydrocarbon compounds all the time. Polystyrene carcinogenicity is small. General benzene ring on the more substituents, the toxicity is relatively small, such as toluene is less than the toxicity of benzene. Of course, there are many compounds with benzene ring, so there are a lot of scholars to study with our body creatures do not meet the quality of raw materials to do the polymer, such as lactic acid production of polylactic acid, but the current Can be put into use much.
Q: HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords