Aluminum Foil Tape with Release Paper Used In HVAC System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 roll
- Supply Capability:
- 20000 roll/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Aluminum Foil Tape
Description of Aluminum Foil Tape
Aluminum Foil Tape is made of aluminum foil as backing material which single coated with acrylic adhesive of excellent tackiness and adhesive layer is covered with a protective silicon paper as release liner. Aluminum Foil Tape has excellent resistance against chemical corrosions due to the protection of a thin layer of aluminum oxide which coated on the surface of aluminum foil carrier.
Features of Aluminum Foil Tape
Features high peel adhesion with good tack, temperature and aging resistance, and water vapor resistance
Aluminum Foil Tape Features:
1) High tensile strength aluminum foil made from special aluminum
alloy, coated with aggressive solvent-based acrylic adhesive,
which provides high peel adhesion and quick sticking
2) Designed for sealing joints and seams of foil jacketing in
air-conditioning duct work
Image of Aluminum Foil Tape
Specification of Aluminum Foil Tape
Property | Unit | Value | Test Method |
Backing thickness | micron | 36 | PSTC-33/ASTM D3652 |
Peel adhesion | N/25mm | 18 | PSTC-1/ASTM D3330 |
Tack Rolling Ball | cm | 20 | PSTC-6/ASTM D3121 |
Tensile strength | N/25mm | 45 | PSTC-31/ASTM D3759 |
Elongation | % | 3 | PSTC-31/ASTM D3759 |
Service temperature | °C | -10~+120 | |
Applying temperature | °C | 10 ~ 40 |
FAQ
We have organized several common questions for our clients,may help you sincerely
Where to use the tape?
The aluminum foil tape is widely used in HVAC system. They are easy to take and install. Their aluminum face can reflect 97% of the outside sunlight to keep the duct insulation well. Also the aluminum foil tape can be used in home application production and daily life etc.
How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test; We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
How long can we receive the product after purchase?
In the purchase of product within 10 working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 20 to 25 working days can be served.
What is the storage condition?
The welded wire mesh should be stored at room temperature and kept from wet and heat source.
- Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
- But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
- Q: Air to water heater host and air conditioning host is not the same
- You can try asphalt! Is the kind of paving the way! Very useful!
- Q: Air conditioning ventilation when the sound is a big reason
- Buried plastic pipe under external load, the diameter of the vertical diameter deformation rate should be less than the allowable diameter of the pipe deformation rate The diameter of the allowable diameter of the pipe shall not be greater than 5% The diameter deformation rate of the pipe and the allowable diameter deformation rate are calculated as follows: ε ΔD / D0 × 100% [ε] ε0 / K where: εΔD pipe in the combined load (Mm) [ε] Permissible diameter Deformation rate ε0 Elastic diameter Deformation rate (%) of pipe, by the flattening of the diameter of the pipe diameter (mm) The test determines the K safety factor, generally desirable 15
- Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
- Can be small, according to your roof to do what material.
- Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
- Common points are all sandwich panels, with a hard protective layer, the difference is the middle of the different materials, such as polystyrene board, polyurethane board. Polystyrene board which is the most common, because the price is cheap, easy to use so the use of more, but if the temperature is more than the requirements of the chicken inertia glycosylation moxibustion slim faint words, polystyrene board is not satisfied , So there is a polyurethane sandwich panels, polyurethane thermal conductivity of less than 0.. in the existing insulation materials, large quantities of processing, be the best. But because of its process is more complex, and the cost is relatively high, so with less, the common combination of cold storage and the like, I believe that with the economic and technological development, polyurethane sandwich board market share will be more and more High
- Q: Air conditioning machine work when the sound is too much reason
- This is based on the density of benzene board decision, not what you said, know it buddy.
- Q: What is the whole heat exchange fresh air ventilator?
- Second, the new insulation decorative board is integrated through the production line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing construction energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing Building energy-saving transformation of the preferred materials
- Q: External wall insulation method of operation There are several combinations of materials
- Seeking the existing building construction specifications Daquan! The The @
- Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
- Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
- Q: HVAC Heating: What are the main components of the air distribution system?
- The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt
Send your message to us
Aluminum Foil Tape with Release Paper Used In HVAC System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 roll
- Supply Capability:
- 20000 roll/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords