truck mounted crane BJ1149VKPEG 7ton lifting tools and equipment
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Feature: Truck Crane
Condition: New
Application: for ship,seaport using ,Logistics handling
Rated Loading Capacity: 0
Rated Lifting Moment: 17.5tm
Max. Lifting Load: 7,000kgs
Max. Lifting Height: 12M
Span: 5.5M
Place of Origin: Jiangxi, China (Mainland)
- Model Number: SQ703
Certification: CCC,TX
Warranty: ONE YEAR
color: yellow,red,blue,white as you like
Packaging & Delivery
Packaging Details: | Container packing / LCL / SKD / CKD / etc. |
---|---|
Delivery Detail: | 5-15 days |
Specifications
1.Chassis model:BJ1149VKPEG
2.Reinforced hexagon structure
3.360 all rotation
4.Design as demanded
5.OEM
FOTON Brand BJ1149VKPEG-FB Truck mounted Crane | |||||
ENGINE MODEL | ISF3.8s3168 | POWER(KW) | 125 | ||
DISPLACEMENT | 3760 | OVERALL SIZE(MM) | 8310*2175*2440 | ||
INNER(MM) | 5200*2100*550 | TOTAL | 14495 | ||
FRONT PASSENGER | 3 | CURB WEIGHT(kg) | 3700 | ||
RATED LOAD(kg) | 10795 | TIRE MODEL | 8.25R-16 |
Main Parameter of Telescopic Crane 7Ton
Model | SQ704 | Unit |
Max Lifting capacity | 7,000 | Kg |
Max Lifting Moment | 17.5 | T.M |
Max Lifting Height | 15 | M |
Max.Working Radius | 12 | M |
Max oil flow of Hydraulic system | 63 | L/Min |
Max pressure of Hydraulic system | 20 | Mpa |
Oil Tank Capacity | 80 | L |
Rotation Angle | All Rotation | |
Crane weight | 250 | Kg |
Installation space | 900 | mm |
Derricking Scope | 1-70 | ° |
Number of Booms | 4 | Sections |
Outrigger Span | 5.5 | M |
- Q: What does Canada trade to Norway? Norway gives us minerals and machinery, but what do we trade them? HELP!!?
- Canadian exports to Norway consist mainly of primary products, namely ore mattes and concentrates. Exports of machinery and aircraft and aircraft parts are also significant. Norwegian exports to Canada include petroleum, machinery, fish and seafood, and metals.
- Q: Excuse me, what is the meaning of the construction team Jixietaiban? What is the meaning?
- Shift from "Taiwan" and "class", "Taiwan" refers to machinery and equipment units, such as: "a car, two excavators and other"; "class" refers to "work by the time into the paragraph, such as" night shifts, day shift, etc., in accordance with China's working hours established a "class" refers to the eight hours of work time.
- Q: What is mechanical connection?
- It is to connect two or more independent parts together to form a whole. The connection methods are: locking, riveting, welding, etc. two,......
- Q: replacement battery and charger for gmc (global machinery company) 18v mag cordless drill?
- === batteries plus === that is your store to buy the replacement ....go to the store or go online and order == describe the old battery well so the order taker gets it right ..... the Global Machinery Company is located in the UK and they build high quali
- Q: Poll: Can you operate heavy machinery?
- Yep! I can in fact I have the master key's to all Caterpillar equipment made in the USA or Mexico....
- Q: Suppose that a piston is moving straight up and down and that its position at time t seconds iss = Acos(2πbt)with A and b positive. The value of A is the amplitude of the motion and b is the frequency(the number of times the piston moves up and down each second). What effect does doubling the frequency have on the piston's velocity and jerk?Follow up question, why does machinery break when you run it too fast?
- f = 1/P, where f is the frequency and P is the period P = 2π/(2πb) = 1/b, so P = b Let v = velocity v = ds/dt = -A sin (2πbt) ? 2πb = -2πAb sin (2πbt) Let f* = 2/b, so P* = 2π/(2/b) = bπ v* = -2πAb sin (πbt) The amplitude of the new velocity is 2πb times the original amplitude. Let a = acceleration a = dv/dt = -4π^2Ab^2 cos (2πbt) Let j = jerk j = da/dt = 8π^3Ab^3 sin (2πbt) a* = 8π^3Ab^3 sin (πbt) The amplitude of the new jerk is 8π^3b^3 times the original amplitude. An increased jerk means the machinery is subjected to greater stress, which causes it to break down.
- Q: I have recently sprayed an small plot of land. The grass has burned off but has not been dug up yet. I'm not sure what machinery i should use to dig the plot. P.S. The plot is small but is too big for me to dig myself.Machinery like tillers, rotivators e.t.c.
- Hello I'm new at this and I really an not sure what I am going to suggest will even work. Do you think a tiller will work? Or maybe one of those tractor things with the scoop on the front? My brother came through over with one and went through my overgrown wooded area to make a beautiful path for me to be able to use for walks. I was able to walk around that trail same day! He was able to take out the vegetation close to the ground too. The ground was rough and muddy when he was done but I don't think there's a way to prevent rough ground when digging. Chances are you will be able to get out there with a shovel afterwards to break things up or like me turn the grass upside down to die. If you rent one it shouldn't cost too much. It's also fun to work with those thing. Is it your plan to replant? Do you add any manure and compost to your ground. I've sprayed and then cut grass short before when I wanted to make a garden. I created raised beds by putting the manure compost, topsoil and pearlite on top of the dead grass. A few longer blades stuck out but they were very dead. I grew my best garden ever that year! Plus it was so easy. I was very pleasantly surprised by the result! I can't promise it will work as well for you though. That's all I can think of though. Thank you for taking the time to read my answer. Jeannie
- Q: Urgent! Is mechanical engineering major or special?
- The main research directions of mechanical engineering are: the design and development of mechanical equipment, the manufacture and management of mechanical equipment, the quality control of mechanical equipment, the performance test, the production equipment management, the use of nurturing and maintenance.
- Q: What are the concrete construction machinery?
- A reinforced concrete structure is a structure made of reinforced concrete. The main load-bearing component is constructed of reinforced concrete. It includes thin shell structure, large formwork cast-in-place structure and reinforced concrete structure built with sliding formwork and lifting plate. A structure made of steel and concrete
- Q: Material costs, machinery costs, management costs, labor costs accounted for the proportion of construction projects
- 5, travel expenses, property insurance, 6, 7, 8, engineering maintenance fees, sewage charges, 9, labor protection fees, inspection fees, 10 test, 11, outside the unit management fee, 12, finishing materials and sporadic freight, 13, material shortage and damage
Send your message to us
truck mounted crane BJ1149VKPEG 7ton lifting tools and equipment
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 20 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords