Tower Crane VFD PLC Hoistingf Mechanism New
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC7021(QTZ250)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC7135
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 50、55、60、65、71 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 16 | ||||
Tip load @ 71m(t) | 3.5 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-4 | 0-8 | 0-8 | 0-16 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF280-8-55KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YPBE132M-4-7.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YLEW112M-6-120N.M×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 26 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 95 | ||||
Power supply requirement (KVA) | 255KVA for generator | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V 146A |
Loading diagram:
70m jib length:
R | 3.7~18.26 | 20 | 22 | 24 | 26 | 28 | 30 | 32 |
4 Falls (t) | 16 | 14.48 | 13.02 | 11.8 | 10.77 | 9.89 | 9.12 | 8.45 |
R | 34 | 36 | 38 | 40 | 42 | 44 | 46 | 48 |
4 Falls (t) | 7.86 | 7.34 | 6.87 | 6.44 | 6.06 | 5.71 | 5.39 | 5.1 |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 |
4 Falls (t) | 4.84 | 4.59 | 4.36 | 4.15 | 3.95 | 3.76 | 3.59 | 3.43 |
R | 66 | 68 | 70 | |||||
4 Falls (t) | 3.28 | 3.14 | 3 |
71m jib length:
R | 4.7~35.36 | 36 | 38 | 40 | 42 | 44 | 46 | 48 |
2 Falls (t) | 8 | 7.98 | 7.38 | 6.96 | 6.58 | 6.24 | 5.93 | 5.64 |
R | 50 | 52 | 54 | 56 | 58 | 60 | 62 | 64 |
2 Falls (t) | 5.37 | 5.13 | 4.9 | 4.7 | 4.5 | 4.32 | 4.15 | 3.99 |
R | 66 | 68 | 70 | 71 | ||||
2 Falls (t) | 3.84 | 3.7 | 3.56 | 3.5 |
65 m jib length:
R | 3.7~19.55 | 21 | 23 | 25 | 27 | 29 | 31 | 33 |
4 Falls (t) | 16 | 14.79 | 13.36 | 12.16 | 11.15 | 10.27 | 9.5 | 8.83 |
R | 35 | 37 | 39 | 41 | 43 | 45 | 47 | 49 |
4 Falls (t) | 8.24 | 7.7 | 7.23 | 6.8 | 6.41 | 6.05 | 5.73 | 5.43 |
R | 51 | 53 | 55 | 57 | 59 | 61 | 63 | 65 |
4 Falls (t) | 5.15 | 4.9 | 4.66 | 4.44 | 4.24 | 4.05 | 3.96 | 3.7 |
65m jib length:
R | 4.7~38 | 39 | 41 | 43 | 45 | 47 | 49 | 51 |
2 Falls (t) | 8 | 7.77 | 7.35 | 6.96 | 6.61 | 6.29 | 5.99 | 5.72 |
R | 53 | 55 | 57 | 59 | 61 | 63 | 65 | 66 |
2 Falls (t) | 5.47 | 5.23 | 5.02 | 4.81 | 4.62 | 4.45 | 4.28 | 4.2 |
60m jib length:
R | 3.7~21.45 | 22 | 24 | 26 | 28 | 30 | 32 | 34 |
4 Falls (t) | 16 | 15.57 | 14.13 | 12.93 | 11.89 | 10.99 | 10.2 | 9.51 |
R | 36 | 38 | 40 | 42 | 44 | 46 | 48 | 50 |
4 Falls (t) | 8.89 | 8.34 | 7.84 | 7.4 | 6.99 | 6.61 | 6.27 | 5.96 |
R | 52 | 54 | 56 | 58 | 60 | |||
4 Falls (t) | 5.67 | 5.4 | 5.15 | 4.92 | 4.7 |
60m jib length:
R | 4.7~41.9 | 44 | 46 | 48 | 50 | 52 | 54 | 56 |
2 Falls (t) | 8 | 7.58 | 7.21 | 6.87 | 6.56 | 6.27 | 6 | 5.75 |
R | 58 | 60 | 61 | |||||
2 Falls (t) | 5.52 | 5.3 | 5.2 |
55m jib length:
R | 3.7~21.54 | 23 | 25 | 27 | 29 | 31 | 33 | 35 |
4 Falls (t) | 16 | 14.89 | 13.57 | 12.45 | 11.48 | 10.63 | 9.89 | 9.24 |
R | 37 | 39 | 41 | 43 | 45 | 47 | 49 | 51 |
4 Falls (t) | 8.65 | 8.13 | 7.65 | 7.22 | 6.83 | 6.47 | 6.14 | 5.84 |
R | 53 | 55 | ||||||
4 Falls (t) | 5.56 | 5.3 |
55m jib length:
R | 4.7~41.6 | 43 | 45 | 47 | 49 | 51 | 53 | 55 | 56 |
2 Falls (t) | 8 | 7.71 | 7.33 | 6.98 | 6.65 | 6.35 | 6.08 | 5.82 | 5.7 |
50m jib length:
R | 3.7~22.4 | 24 | 26 | 28 | 30 | 32 | 34 | 36 |
4 Falls (t) | 16 | 14.85 | 13.58 | 12.5 | 11.56 | 10.74 | 10.011 | 9.37 |
R | 38 | 40 | 42 | 44 | 46 | 48 | 50 | |
4 Falls (t) | 8.79 | 8.27 | 7.8 | 7.38 | 6.99 | 6.63 | 6.3 |
50m jib length:
R | 4.7~43.6 | 44 | 46 | 48 | 50 | 51 |
2 Falls (t) | 8 | 7.92 | 7.53 | 7.18 | 6.85 | 6.7 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: I work in downtown Atlanta, and they are doing some kind of work on top of one of the high rise buildings downtown with a big crane. I was wondering how they got that heavy of a crane there to begin with? Thanks ahead of time!
- If they have more than 13 floors, in fact there is a 13th floor. People are just too superstitious for some buildings, like hotels to state them. It will skip from 12-14.
- Q: I've been wondering about the infamous Crane Stance that many people associate with Martial Arts. Is the Crane Stance a technique that can be used in a fight and strike an opponent effectively without overly exposing yourself to strikes by your opponent? If it is, what are some techniques that can be used out of a Crane Stance?
- As always Sensei is on the top. And I agree with him about stslavik. Nice answer - brief and to the point and esy to understand for a beginner or lower/lower-intermediate level student (who would be asking this type of question). Some more easy/beginner answers to consider: A) Some other possible applications would be a knee (like in Saifa kata), using the shin/leg for blocking, etc. B) Learning to generate snap in a kick without using the body behind it. Many patterns break down techniques into seperate parts to help learn specific principles. Later you can combine or alter those specific sections to match the situation. There are a lot of reasons for stances and techniques that appear in traditional martial arts. It takes a lot of study and very good teachers (or sempai..haha) for the practitioner to discover those meanings. I gave you some easier answers to help you discover these meanings on your own. That will help you more in the long run... Good luck!
- Q: How to build a tower crane?
- 4, combination and installation with the boom, hung with arm pull rod.5, the assembly and installation of crane. This boom just installed in the rotary device, the other end is able to lift and hang rod, in accordance with the installation instructions.The power supply auxiliary hoist with 6, switch on the tower cap following installation, the installation of counterweight boom hoist with the.
- Q: How would you argue that Helga Crane does change in Quicksand by Nella Larsen?
- Helga Crane
- Q: I have a question about cranes...does anyone know what the maiximim weight is that they can lift. A friend and I were discussing this and i was just wanting to know if anyone might have the answer. Thanks guys
- Do not know where you live but I worked in a Shipyard in South Mississippi That had Cranes which picked up Modules which weighed 100 tons. Most were in the range of 50 to 70 tons the limiting factor was the range of the lift away from the crane. The further away from the Crane the less the load limit but the Cranes were rail mounted so they could traverse and carry the load anywhere. We had one Crane capable of handling 500 tons, a real monster. These are all located at Pascagoula Mississippi. Most were imported from Germany.
- Q: how does the power electronic drives employed in cranes?
- Most large cranes run electrical motors. Depending on what power is available at the site, the crane may run from a generator or be powered by the grid. The power requirements depend on the size of the crane. Larger cranes may use a six-pole, three-phase, one-wye, 440-volt circut. Smaller cranes could use a three-phase 220-volt circuit.
- Q: Ever felt like a paper crane?
- Made to fly, bended to will, broken in the process because some jerk knocked you down. At the end of the day tossed away because you're nothing more than a delicate pretty thing in their eyes, with a skin as thick as the tissue paper you're made of. Yep.
- Q: Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
- Agency level lifting mechanism: M5 luffing mechanism: the maximum working range of M4 working range: 56m minimum generation writers instead of me...... Thanks...... 6T tower crane CAD diagram
- Q: please tell an article about electromagnetic crane?
- electromagnetic crane has a huge electric magnet instead of a hook. this magnet is operated by an electrical current. when electric is switched on the magnet becomes magnetized,allowing metal objects to be picked up just like an ordinary magnet.when Electric is turned off the metal object will fall away, as it is no longer magnetized.
Send your message to us
Tower Crane VFD PLC Hoistingf Mechanism New
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords