Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC5613(QTZ80)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC5613
Free standing height (m) | 46 | ||||
Max height with attachment (m) | 150(200) | ||||
Working range can be adjusted(m) | 44、50、56 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 8 | ||||
Tip load @ 56m(t) | 1.3 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZRWFc250M-4/8 30/30KW | ||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||
Motor | |||||
Slewing mechanism | Speed(r/min) | 0~0.6 | |||
Motor | YZR132M2-6-3.7KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 14.1 | ||||
Mast section size(L×W×H)m | 1.8×1.8×2.5 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 42 | ||||
Power supply requirement (KVA) | 190KVA for generator | ||||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 179A | ||||
Rated working voltage & current | 380V 128A |
Loading diagram:
56m jib length:
R | 2.5—13.7 | 14 | 20 | 24.9 | 26 | 32 | 35 | 38 | 44 | 50 | 56 |
a=2 | 4t—24.9m | 3.80 | 2.94 | 2.63 | 2.36 | 1.94 | 1.63 | 1.38 | |||
a=4 | 8t—13.7m | 7.79 | 4.12 | 3.92 | 3.72 | 2.86 | 2.55 | 2.28 | 1.86 | 1.55 | 1.30 |
50m jib length:
R | 2.5—15.1 | 16 | 22 | 26 | 27.6 | 32 | 35 | 38 | 42 | 50 |
a=2 | 4t---27.6m | 3.34 | 2.99 | 2.70 | 2.37 | 1.88 | ||||
a=4 | 8t-15.1m | 7.48 | 5.15 | 4.22 | 3.92 | 3.26 | 2.91 | 2.62 | 2.29 | 1.80 |
44m jib length:
R | 2.5—16.3 | 20.9 | 26 | 29.8 | 32 | 35 | 38 | 40 | 42 | 44 |
a=2 | 4t---29.8m | 3.69 | 3.31 | 2.99 | 2.79 | 2.63 | 2.48 | |||
a=4 | 8t---16.3m | 6.0 | 4.64 | 3.93 | 3.61 | 3.23 | 2.91 | 2.72 | 2.55 | 2.40 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:A 3000-lb wrecking ball hangs from a 40-ft cable of density 10 lb/ft attached to a crane. Calculate the work done if the crane lifts the ball from ground level to 40 ft in the air by drawing in the cable.
- The total work done by the crane equals the potential energy gained by the wrecking ball and the cable; the potential energy gained is W = V_final = Mg L + ρ L g L/2 which is the final potential energy of the wrecking ball and the cable added together. In the case of the cable, you take the center of mass of it which is located right at the center (L/2). The result is then W = 3000*32*40 + 10 * 40 * 32 * 40 / 2 = 4096000 ft-lbf = (4096000)*(0.001285067) BTU = 5263.63 BTU
- Q:What is an attached tower crane?
- Attached tower craneAttached tower crane is arranged close to the building, the tower by themselves to rise up with the increase of buildings and roof, tower, every 20m with attachment support device, the tower body is fixed on the building, in order to maintain stability. Figure 11 is a QT4 - 10 self - elevating four - tower crane (attachable, stationary, walkable, and climbing).
- Q:I was watching house m.d. When I notice house walking with a crane I asked a friend who knows house and has seen it but dosent remember why and how. why is he?
- It's a cane not a crane. Whew! To summarize, what happened to House's leg was that there was muscle death of the leg. He should have had it amputated, but he didn't. Instead, he wound up with a nearly useless, and chronically painful leg. Stacy, as a participant in this demise, well, I guess the relationship was all downhill from there. House realizes it was all his fault. If he would have just got the amputation, he wouldn't have screwed it all up Stacy is his ex-wife.
- Q:Is there an effective utility for estimating the required size of a crane? I’m an estimator for a mechanical contractor, and it seems we never allow enough money for crane rental. How can I effectively adjust my estimates?
- The only effective way to estimate the size of a crane when needed is to know, without a doubt the weight of the heaviest thing that you have to lift, and allow at least a 20% margin for safety. This is standard practice in building bridges, in particular - the weight of EVERYTHING is clearly marked, or just generally known. If there are bridge segments to load on a barge, for example and the heaviest segments are 220 tons, then a 300 ton crane is used. Always err on the side of safety.
- Q:Operation points of tower crane (tower crane)?
- Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
- Q:I am writing a short paper on the significance of the white doves and the crane in the book Sadako and I'm really not sure what to say.
- Anyone who folded a thousand paper cranes would be granted a wish. Sadako wished to healthy again so that she could run and play like before, and she pursued her goal with such determination that, although she died of her disease, she succeeded in transforming the paper crane into a symbol of peace for children all over the world.
- Q:I've always been puzzled how cranes operate.Because as buildings get taller so do cranes but i don't know how they increase the height of the cranes.Can you help answer this please?
- search for others, animation and video of process more edit Some cranes actually climb the structure of the building and are taken apart when the building reaches its full height.
- Q:I have been doing a science projet and i cant find it anywhere
- The wild Whooping Crane flock spends its summers in Wood Buffalo National Park in the Northwest Territories of Canada. They nest and rear their young there. During the fall season, the Whoopers migrate 2,500 miles south to Aransas National Wildlife Refuge in Texas where they spend the winter and early spring. There are currently 193 birds in this flock.
- Q:Please write in days, hours, weeks, etc.I need math help!!!!
- If it takes 7*60 + 11 = 431 seconds to make 1 crane, then making one million would take 431,000,000 seconds. There are 3600s*24hr*365.25d = 31,557,600 seconds in an average year. Dividing 431 million by this gives a little over 13 years, with a remainder of 20,751,200 seconds. There are 3600*24*30 = 2,592,000 seconds in an average month. So that gives 8 months with a remainder of 15,200 seconds. There are 3600 seconds in an hour, so that gives 4 hours plus 800 seconds. The 800 seconds = 60*13 + 20 = 13 minutes, 20 seconds. This works out to 13 years, 8 months, 4 hours, 13 minutes, and 20 seconds. Though answers can vary depending on how many days you define to be in a year, and how many days in a month.
- Q:How to build a tower crane?
- 7, the boom of the horizontal installation, setup of counterweight, main hoist installation, installation sequence of these large, there are provisions in the instructions.8 、 install operating room, main cable and control cable. Installation of crane wire rope, hook, lifting the car has been in the assembly of the boom when installed.9, at this time has completed the basic installation, the later self lifting installation, the main work by the tower crane itself equipment and artificial to complete.10 tower crane from basic height to work height.Each type of tower crane has different self lifting mounting methods. In fact, in addition to carrying heavy loads, the installation of a large number of high-strength bolts is a heavy work.11, the above is the general procedure, the actual installation work in strict accordance with the installation instructions. According to historical experience, tower crane installation accidents often occur in some professional installation team.12, the old type of tower crane installation is relatively simple, but also have independent installation, and now the development of automobile crane is not a must, general use of car crane can complete all the installation.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC5613 Climbing Cage CMAX Brand
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords