• Tower Crane TC5610 Construction Equipment Building Machinery Distributor Sales System 1
  • Tower Crane TC5610 Construction Equipment Building Machinery Distributor Sales System 2
  • Tower Crane TC5610 Construction Equipment Building Machinery Distributor Sales System 3
  • Tower Crane TC5610 Construction Equipment Building Machinery Distributor Sales System 4
Tower Crane TC5610 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC5610 Construction Equipment Building Machinery Distributor Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC5610 Description:

1.CMAX Tower Crane TC5610  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5610  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5610 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5610  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5610  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5610  Parameter:

 Max. working range 56m, tip lifting weight 1T and Max. lifting weight 6T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 41.5

Max height with attachment (m) 141.5

Working range can be adjusted (m) 44、50、56

Min working range (m) 2.5

Max lifting capacity (t) 6

Tip load @ 50m (t) 1


Tower Crane TC5610   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5610 Diagram:

Tower Crane TC5610 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC5610 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC5610 Technical Sheet:

Tower Crane TC5610 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC5610 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5610 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56 meter, and the last two letter “10” means the tip load is :1 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:I had a dream and it wos really scary so realistic i woke up crying and could go to work the next dayi was in my house and woke up and came downstairs and there were letters on the floor and someone was picking them up then i looked outside and there wos a big fire and a crane had fallen down and explosion and everyone was dying their faces burnt i burst out crying. what does it mean?
Probably some stress or fear is looming large in your subconscious mind. Scary dreams often occur when you have something that is stressing you. That is assuming you didn't read some book or watch some movie that brought it on, that is another possibility. Often we replay images we have in our heads from the day before. I don't think it is an omen or anything. So, be glad to say it was only a dream.
Q:would 2 500 ton crawler cranes be able to lift a 854 ton bridge section 80 feet in the air?
wow. im helpful anybody tried it!! why : the recommendations co-ordinates the strikes of the finished physique. fairly the arms and the ft, so once you're turning your appropriate foot in clockwise path, with the help of drawing 6 jointly with your hand, that's an ANTI-CLOCKWISE circulate, the recommendations then makes the foot circulate anti-clockwise. Thats how suitable GOD made us!!
Q:I need it for my English class, not to cheat, but because my literature book only has an excerpt, in which I didn't even know Yukiko's name. And my teacher insists on finding it out for ourselves and I just want to know what the story is about and what the scandal repeatedly implied in the excerpt is.
Apparently okorder /
Q:Who is the most gruesome Stefano DiMera or Alistar Crane?
The DiMera's have been around longer than the Crane's. Alistar is the more gruesome because he messes with his own family memebers whereas Stefano they do anything for their own.
Q:I've been thinking about selling origami and I think it will worked out. And also because this is my hobby and I want to have my own cash.
I take it you are still in school. I would say 25 cents apiece, 50 for more complex designs.
Q:how a tower crane for a high rise building construction is erected?
Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
Q:in design of steel structures as per asce2005 or ibc2006 ,what load combinations are to be considered when crane loads and seismic loads are present?
Asd Load Combinations
Q:i probably sound like an idiot asking this question :Pis it electricity? fossil fuel burning involved? pulleys? how does the pulley work? any human power involved? specifically, how is it stupid to lift a chair that can be lifted by a person, with a crane?
A crane is a pulley and using simple machines like wedges, screws, pulleys etc. takes less work.
Q:Does anyone knows where could I find this book online and free ? I would love to read it from my tablet or computer
The Lost Language of Cranes is a novel by David Leavitt, first published in 1986. So the author wasn't thinking about ebooks back then and never signed a contract to make ebooks. See if your public library has a copy in paper. Amazon sells it in paperback and hardcover. Anyone that has a copy for free has stolen intellectual property and is cheating the author and publisher.
Q:In order to ensure the stability of tower cranes, generally along the height of the tower and building a number of meters attached
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords