Tower Crane TC5013A Construction Equipment Sales Building Machinery Distributor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC5013A Description:
1.CMAX Tower Crane TC5013A is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC5013A can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC5013A has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC5013A has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC5013A has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC5013A Parameter:
Max. working range 50m, tip lifting weight 1.3T and Max. lifting weight 6T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 40
Max height with attachment (m) 121
Working range can be adjusted (m) 44、50
Min working range (m) 2.5
Max lifting capacity (t) 6
Tip load @ 50m (t) 1.3
Tower Crane TC5013A Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC5013A Diagram:
Tower Crane TC5013 Technical Sheet:
- Q: A crane operator must ensure that the load is within load chart ratings for _________ and the __________ of the crane.A. Boom length; CenterpointB. Boom length; Load RadiusC. Center Point, Load RadiusD. Center of Gravity; Load Radius
- B. The load radius is the horizontal distance from the center of rotation of the crane to the center of gravity of the load being lifted. The load radius is a critical consideration when determining what size crane is required for most lifts. There is generally a chart that tells what that machine will lift at any boom length,
- Q: Is Fireplace Crane a modern term for the swing-out metal arms that hang over a fireplace for cooking? e.g. like in dutch ovens or pots/cauldrons that hang over a fire.It sounds like a more modern term and I need to know if there is an older term. Thanks.
- Apparently that IS what they were called. Who knew? I would have guessed something a little more poetic like Dragon's Tail because it's long and straight, swings on a pivot and frequently has notches along to top for latching the bails of cooking pots and the like. Crane sounds so... so... ordinary.
- Q: would a tower crane be a first class, second class, or third class?
- Did you open your ME book? The answer is in there.
- Q: the highest ranking American serviceman, at least in the so called prison camp
- Bob Crane did not commit suicide. His head was caved in with a video camera tripod while he was in bed, presumably, asleep. This happened at a time when he was doing dinner theater in Arizona. It is believed that a male friend of his who liked hanging around with Crane did the deed as Crane was seeking to end their friendship. Crane was a chick magnet and very interested in video taping his encounters with women. This friend of Crane's used to pick up the leftovers that Crane didn't sleep with and thus the reason for his being angry when Crane wanted to end the friendship.
- Q: I have to create a crane to support a dead load for my Engineering Technology class. It can be made out of only 1/8 inch balsa wood and wood glue, and is going to be graded by the ration of weight held to structure weight.Could anybody give me some suggestions as to how to go about designing this thing? I already know most of the basics, but if anybody could give me some specific tips, they would be greatly appreciated.Thanks!
- Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.
- Q: What does "automatic tower crane" mean less than 100 tons per metre?
- The crane must not exceed the maximum lifting capacity when working! Otherwise, there will be danger.
- Q: What is the dumbest bird in the aviary community? Is it really the Crane?
- The owl is close to being the dumbest bird. An expert who told us this explained that its eyes were so big, there wasn't much room left in its skull for brain . . .
- Q: what are the effects of fiction in cranes?
- Huh? Cranes like the bird or like the construction equipment?
- Q: I'm not afraid of snakes, mice, spiders, or any insect, for that matter. Except crane flies. I'm not even afraid of mosquitoes! However, I've been afraid of crane flies since I was six. I live in Louisiana and The crane flies came today, exactly on the same day they came last year. I don't care about them outside but I freak out when they're inside- especially in my bedroom, the bathroom, and the living room. What can I do to a) protect my house from them and b) not be afraid of them? I'm 14 by the way.
- I'm glad i'm not the only one scared of crane flies! They're huge and when you crush them eggs or poop come out. ;A;
- Q: I want to make a sculpture out of 1,000 paper cranes. I have sometime to work on it, but not months. Has anyone ever known someone to do this, or done this themselves? How much time should I allow for such a project?
- I think it will be hard to tell, the easiest form to calculate is the time to make one crane times 1000. However, as long you fold you will get a little bit exhausted therefore you should add 1/5 of the total times to make of the 1000 cranes, good luck!
Send your message to us
Tower Crane TC5013A Construction Equipment Sales Building Machinery Distributor
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords