• Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment System 1
  • Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment System 2
  • Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment System 3
  • Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment System 4
  • Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment System 5
  • Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment System 6
Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane

1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

  

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment

Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment



Tower crane Specifiction

Tower Crane 4 Tons to 10 Tons Building Construction Machinery and Equipment

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


About CNBM


CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Q: the lenght of beam is 4.5mmaterial of beam is ASTM Gr60
difficult question
Q: how do they get cranes on top of building sites?
With anouther crane.
Q: Which style of Kung Fu has an animal system besides Shaolin? Which one has the Tiger, Monkey, Mantis, Snake, and Crane animals (not Shaolin because Shaolin has Dragon, Tiger, Leopard, Snake, and Crane.)
Mantis is not a part of a style, it is a style in its own right. There are also more than one type or style of Mantis. There is Southern Mantis as well as others. There are estimated to be at least 300 to 400, and possibly more style of Kung-Fu. Man have more than one version of branch. Do not get caught up in the idea that Shaolin contains this or that as the subject is controversial at best. You mentioned Shaolin as being Dragon Leopard, Tiger, Snake and Crane. But truth is that everyone did not learn all of those styles. Many students were taught only one of them. The problem here is that people tend to assume that things are always one way, when in fact they often break all rules of assumption. Monkey is another concept or style that is often misunderstood. There is and is not such a thing as a monkey style. It is not easy to clearly explain. The few styles that are called Monkey styles are rare. There is also what ar known as drunken styles. These are not always separate styles but sometimes are taught as a version or level of other styles. Drunken Monkey is often perceived to be a set style or referring to only one specific style. It is not so. drunken monkey can refer to more than one variation of this and may also be seen as something coming form more than one unrelated style. As I have attempted to do, it is a difficult and confusing subject that is often not clear or correct as to what has been published about it. ....
Q: In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
Seneca Crane was the man who ran the Hunger Games in the year that Katniss was in it. He was killed in the end because in the time HE ran the games, TWO people were allowed to win, and President Snow had him killed. It effected the Gamemakers when she wrote it on the dummy because they were shocked and reminded about punishments if they run the games wrong.
Q: The Wayfarerby Stephen Crane The wayfarer, Perceiving the pathway to truth, Was struck with astonishment. It was thickly overgrown with weeds. Ha, he said, I see that none has passed here In a long time. Later he saw that each weed Was a singular knife. Well, he mumbled at last, Doubtless there are other roads.I understand that it is about a person taken the easy way out, but what other underlying meanings are there?
This Site Might Help You. RE: Deeper meaning of this Stephen Crane poem? The Wayfarer by Stephen Crane The wayfarer, Perceiving the pathway to truth, Was struck with astonishment. It was thickly overgrown with weeds. Ha, he said, I see that none has passed here In a long time. Later he saw that each weed Was a singular...
Q: Tower crane 5610 why call QTZ63 tower crane, 5613 call QTZ806015, call QTZ100
As for the calculation method, the weight of a simple arm length * arm tip can not be used, because the nominal lifting torque of the tower crane is not calculated at the maximum amplitude.However, the maximum weight can be calculated by the maximum amplitude of the maximum weight, such as 5613 tower cranes, the maximum lifting capacity of 6 tons, while the maximum variable distance of 6 tons reached 15m, 60KN * 15m=800KN.m.The above is only my personal understanding of the tower crane, but I am not a professional construction machinery, the above calculations do not know whether it is reasonable, I hope to help you.
Q: I have to read this book for an AP class next year. I did read the book and i don't understand how i can discuss the setting and its possible relationship to the theme. I looked stuff up on the internet and I've asked other people who have read the book and they're just as confused as I am. I need help!
I can't tell you what to write or what you see as the theme but one of the themes in the book is man versus nature. Maybe you could discuss the setting as part of nature and what Crane seems to be saying about it. One thing that might help is a poem Crane wrote which explains how he sees things. Maybe you already know it. It's titled A man said to the universe A man said to the universe, Sir, I exist! However, replied the universe the fact has not created in me a sense of obligation. An indifferent universe. Not unlike how Thomas Hardy saw things.
Q: Emergency treatment of interrupted electricity during lifting of tower crane
The rotating gear shall be immediately inserted into the screw or wood, while the power supply shall be checked rapidly to remove the trouble.
Q: Does a crane have a pulley?AND....Is an axe a wedge?THANX CUZ I DONT KNOW WHAT IM DOING, AND OMG IM SO GOING TO FAIL MY TEST BECAUSE IM SO DUMB.
Of course cranes have pulleys. If you know how they work it should be clear. Why else do you think there are two, or more (depending on the crane), ropes attached to their hook. Every rope added, except for the first, halves the weight of the object you want to lift. If you have two ropes and an object is 5 tones, the crane will only need the power to lift 2,5 tonnes. If it has six ropes it even only need the power to lift one tonne. And an axe is a wedge, logically. In fact, every tool with a blade is more or less a wedge. After all the wedge is the principal of a blade's function.
Q: I'm a little confused as to what the difference is between the crane and the flare boom-____- I'm thinking that the flare boom is what they use to burn off oil I there's a fire, but is that right? And what does the crane do?
It's called a flare boom because the flare is out on the end of a boom like structure. To keep the flame as far as possible from the rig production operations.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords