Topkit Tower crane 25 TONS For Building Construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Product Description:
The 6t climbing building construcion tower crane construcion tower crane in china features stable operation and reliable management due to the adoption of various advanced technologies. It is configured with diverse devices like the hydraulic self-propelling device, frequency converting slewing device and a series of reliable safety devices like hoisting height limiter, slewing range limiter and multifunctional limiter. It is thus easy for this heavy lifting equipment to control the hoisting capacity, load moment and trolley traveling range more precisely. Additionally, multiple electric safety devices such as anemoscopes and obstacle lights effectively prevent the breaking of trolley axles and wire ropes.
The PLC (Programmable Logic Controller) adopted by our aerial equipment can timely diagnose the cause of breakdowns. The frequency converter easily realizes continuously variable speed regulation and greatly improves the stability, reliability, and operability of the control system as well as the work efficiency of the flat top tower crane. In addition, the electric components are introduced from world-class enterprises including Omron, YASKAWA, Schneider (TE) and MEAN WELL. They ensure a low failure rate of the electric control system.
Main Product Features:
1. Widened equipment capacity and working scope.
2. Suitable for the groups of tower cross framework.
3. Noise relief stability with and combination amplitude range.
4. Can sustain height adjustment for occasional exceptional height construction procedures.
5. Large weight capacity, effectively solving high steel structure construction lifting capacity requirements.
Product Specifications:
Minimum Order Quantity: | 1 set | Unit: | set | LoadingPort: | |
Supply Ability: | 1000 set/month | Payment Terms: | TT OR LC | Package: | set |
Product Images:
tower crane Specifiction
FAQ:
1.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
2. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
3.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q:Who is it? And when in the book do they say who it is?Thank you so much! :D
- Seneca Crane was the headmaster that allowed both Peeta and Katniss to live from the 'berry' incident and was executed by President Snow. You can refer to page 20 of Catching Fire, Chapter two for more info.
- Q:I am reading catching fire and I'm at the part where Katniss just made a little dummy in the training session and she wrote the name seneca crane on it and the gamemakers were like shocked. Who is seneca crane? and whats up with her?
- Seneca Crane is the previous Game Master, the one that was killed for letting Katniss and Peeta live. She hung the dummy in the training session to make a statement about the Capitol having him killed and replaced.
- Q:How do you calculate ground bearing pressure for cranes?
- Crane Ground Bearing Pressure Calculator
- Q:I have tried so many times to make that crane, and i always fail. Can anyone give me a video that is really good, or instructions that are really good and have pics? Thanks in advance!
- The okorder /
- Q:do they eat them or what??i hear about hunting them and i think cool but what do you do with them i mean do they tast good??
- Eating Sandhill Crane
- Q:What are the types of cranes?
- Two, crane according to the structure is divided into bridge crane and jib crane two categories. (1) traffic, metallurgy specialcrane and Longmen crane, cable crane is a crane (2) portal crane, tower crane, truck crane, crawler cranes, truck cranes, cantilever crane is a crane arm.
- Q:how do they get the construction crane onto the the tall buildings?
- If the crane has a mountaineering physique it is going to diminish itself down, removing its very own tower sections till it somewhat is low adequate to be bumped off by potential of a cellular crane. If it doesnt a smaller crane stated as a derreck crane would be set up on the roof of the development, it is going to take the tower crane dowm, as quickly because it somewhat is bumped off the derreck crane is disassembled and taked down by potential of the homes raise
- Q:This poor little guy has been out on my balcony where I smoke my cigarettes for two days now. One wing is badly mangled and he can't fly away, I thought to just let him work it out yesterday in hopes of him healing on his own somewhere, but today he was climbing on my leg as if asking for help and I feel horrible for him now...he's suffering, he hasn't gone far in at least 24 hours I feel I should feed him and give him water until he heals...what do crane flies even eat?? Any advise aside of killing him and putting him out of his misery would be great!!
- Well, it looks like they only have a lifespan of a 2 weeks at the most, so I'd just make him comfortable and let nature do its thing. According to Wikipedia, adult crane flies don't really eat--they just hang out and mate... If you really want, I suppose you could put some sugar water in a bottle cap or something for him.
- Q:Examples of filling and acceptance forms for tower cranes and examples of filling in.
- The 1 conclusion is "qualified" project, fill out the "tick".2, the conclusion is "unqualified" project, fill in "x"". Part of the "unqualified" sub item should also be painted on its number *".
- Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
- 1, this depends on the specific construction organization design, the general height of less than 20 meters, all with the hoist.2, the framework of the structure, four, 18 meters, construction area, if large, with tower cranes, of course, labor-saving, time-saving and rapid progress, if the construction side agrees, it is best to use tower cranes.3, artificial wages are too high, the project is big, with the winch is not worthwhile, progress can not catch up, workers are also big grievances. The track type tower crane is usually used in shipyard or fixed freight yard.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Topkit Tower crane 25 TONS For Building Construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords