Three Meter Dn125 Delivery Pipe With Sk Flange 4.1mm st52
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 5000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
The 3 meter Delivery Pipe WithoutFlange normally made by steel material No.ST52, 20#, 37MN5, Q235B according to customer’s requests, and also package in bundles or nude packing directly put into container.
Scope of Application of the pipes
The 3 meter Delivery Pipe With Sk Flange is a concrete delivery for combined use with other concrete pipelines in concrete placement operations. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.
This pipes can only be used in concrete construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The pipe is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.
Product Advantages:
OKorder's Delivery Pipe Without Flange Channels are durable, strong, and safety.
Main Product Features:
· Premium quality
· Prompt delivery & seaworthy packing (5-10 days)
Reliable performance
Easy to weld
High safety.
· Professional Service
· Competitive pricing
Measuring of wall thickness from the outside
Low purchase cost
FAQ:
Q1: How long about delivery time?
A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.
Q2: How do we guarantee the quality of our pipes?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.
Q4: If we can produce some pipes according to customers request?
A4: Yes, we can produce Concrete Placing Boom according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.
Q5: How to make a quick resolution for after service?
A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed,
- Q:What type of industry does the machinery and building accessories processing belong to?
- There are only three tax categories in our country: 1 consumption tax, 2 VAT, 3 special tax (agriculture). Therefore, as long as the manufacturing or processing of industrial value added tax on enterprises. It has nothing to do with the economic nature, classification and categories of an enterprise.
- Q:Where are the hanging baskets for the building?
- It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
- Q:What are the sectors of machine building and parts processing?
- Industry to classify, it is not very strict. For example, the insurance industry, mining, energy, food, hotels, real estate services industry, garment industry, advertising industry, aerospace, aviation, chemical, chemical, construction, health care, education, training, computer, metal smelting, fire, police, soldiers, accounting, beauty, body, media, publishing, wood, paper retail, wholesale, agriculture, tourism, justice, lawyers, sports, sports, arts, entertainment, medical, art, design, banking, finance, Internet, music, dance, postal, courier, transport, consulting services.
- Q:What are the details of construction machinery parts in sand casting?
- (3) equipped with fittings, installation type air switch and air shower room installed in the furnace. (2) all kinds of vehicle tracks, transmitters, differential pressure and buttons are all materials other than the equipment body. (3) rotating filter network circulating water system for equipment, induction phase shifter, manhole and other various products embedded parts, clean bench, meter, scientific research and other functions of the machine, and pipeline safety device, railing, peep hole, ventilation air heater (1):
- Q:What are the construction materials, components, fittings and equipment in construction?
- : construction engineering materials, components, fittings, equipment, each refers to: 1, engineering materials: engineering materials mainly refers to raw materials. Such as: sand, stone, steel, etc., there is no processing materials. 2, structural parts: the main structure here is the main structure of the building, the two structure and other accessories. Most of the semi-finished products and the structure of part of the installation accessories, such as: beam beam, continuous beam, beam, beam, cantilever beam, curved beam; steel, timber, concrete beam.
- Q:What are the safety protection equipment, machinery and equipment, construction machinery and accessories for construction enterprises?
- Different types of work, security appliances are not the same. For buildings, the main safety helmets, safety nets, safety belts (San Bao), etc., for electrical operators, mainly insulated shoes, insulating gloves, insulation rod, insulation table, etc.
- Q:What are the mechanical drawing software?
- The plane is mainly CAD and CAXA, there are some non mainstream mechanical engineer what, mainly engaged in your spare parts of machinery industry, roughness, form and position tolerance requirements, recommendations for CAXA, which symbols are readily available, there are standard parts library, mechanical symbols library etc..
- Q:Construction Engineering, moving equipment and stationary equipment, respectively
- 2. Static equipment: reaction equipment (code R). Such as reactor, reaction kettle, decomposition pot, polymerizer, autoclave, converter, digester, steam ball, sulfonation pot, gas producer and so on. Heat exchange equipment (code H). Such as tubular waste heat boiler, heat exchanger, evaporator, condenser, cooler, heater, sterilization pot, water jacket, etc. for dyeing dryer, steamer, cooker, gas preheating. Separation equipment (code S)
- Q:What is the use of spare parts prices in Chinese market by foreign companies?
- You might be gathering information for him. You have no data for one person, if there are several people? They can analyze a lot of things through big data. You can't find out, you're OK. Once you find out, your whole life is over.
- Q:Construction machinery production need to deal with what documents?
- Construction machinery production needs for documents are: first, the construction enterprise safety production license application form 1, form three copies; 2, fill in the application form for details of the "instructions" application form "; 3, the legal representative of the enterprise statement" column should be the legal representative signature, enterprise official seal;
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Three Meter Dn125 Delivery Pipe With Sk Flange 4.1mm st52
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 pc
- Supply Capability:
- 5000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords