Table Formwork with Large Bearing Capacity and Easy Dismantling
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Table Formwork Description
Table formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props.
2. Main Features of Table Formwork
-For any storey heights and slab thickness.
-Fast in transportation and concrete casting due to pre-assmebled table unit.
-Can choose shoring props or towers according to different loadings and height.
3. Timber beam wall formwork Images
4. Timber Beam Wall Formwork Specifications
Basic unit sizes(width*length): 2m*4m / 2m*5m / 2.5m*4m / 2.5m*5m
Main components:
-- 18mm/21mm brown film plywood;
-- Main beam - H20 timber beam(EN13377)
-- Secondary beam - H20 timber beam(EN13377);
-- Fixed or swivel table head for option
-- Shoring prop (10KN/20KN/30KN loading capacity with 2.5m to 5m open length, HDG, EN1065)
-- Shoring tower bros (35KN/60KN loading capacity with extreme height, HDG)
-- Handrail post
5. FAQ of Table Formwork
1) What promises can be done by us?
. If interested in this kind of formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
2) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
- Q:1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
- General principles for the implementation of 1.0.1 in the construction of formwork engineering in China to implement the principles and policies of safe production, to achieve advanced technology, economic and reasonable, easy to apply and to ensure safety in production, the development of this specification. 1.0.2 This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction. 1.0.3 template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation work to improve the reuse rate. The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
- Q:What is the building template support
- (1) the material of the template support: high performance cold rolled steel, thickness of 2.5 mm to 2.7 mm, the new material is characterized by: corrosion resistance, elasticity, strong deformation.(2) the specification of new steel building formwork support:
- Q:What is the use of building wall formwork support? Thank you
- In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket
- Q:86335 template support, what is the concept of those advantages
- In the case of the construction industry, after 20 years of this industry, dedicated to technical analysis and improvement. After painstaking research, invited the domestic industry elite Magi to discuss, repeated demonstration, combined with the actual measurement through the practice of technical staff, spend long time hard work. Finally invented this new type of digital steel template support combination structure, so far spent ten years of painstaking research on the huge sums of money technology finally succeeded. To fill the gaps at home and abroad (with our understanding of the current international and domestic architectural template combination structure has not been any new structure), and won the national invention patent.
- Q:Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
- Here we use multiple beams, and the waterproof, thermal insulation, in tile.What is the waterproof tile?Timber can do SBS? Don't understand what you mean, if not the construction of SBS membrane surface; or SBS polymerization coating applied to the beams? Feel that is not necessary, just like a bit of preservatives, like the outside paint brush.
- Q:Technical specification for construction formwork safety JGJ162-2008 who has made me please
- Template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation workload. To improve the reuse rate.The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Table Formwork with Large Bearing Capacity and Easy Dismantling
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords