• Suspended Platform ZLP630 System 1
  • Suspended Platform ZLP630 System 2
  • Suspended Platform ZLP630 System 3
Suspended Platform ZLP630

Suspended Platform ZLP630

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
1 Set m.t.
Supply Capability:
300Sets Per Month m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

ZLP630 Suspended Platform

ZLP series Suspended Platform(temporarily installed suspended access equipment), is ideal equipment for building facade construction,

decoration, cleaning and maintenance. And it is also widely used in elevator installing, ship building and repairing, or in other works such as

big-size tank, bridge, embankment and chimney. ZLP series versatile knock-down platforms provides workers safer, easier and more

efficient platform access.

 

Specification:

ype

ZLP630

Rated Capacity

630kg

Rated Lifting Speed

8 -10 m /min

Steel Rope Diameter

8.6mm

Hoist

Type

LTD6.3

Rated Lifting Force

6.3KN

Motor

Type

YEJ 90L -4

Power

1.5KW

Voltage

380V

Frequency

50 Hz

Rotation Speed

1420rpm

Brake Torque

15Nm

Safety lock

Type

LSB30

Permission Force of Impact

30kN

Locking Cable Distance

<100mm

Platform Dimension  L × W × H (mm )

5000 × 690 × 1460

 

6000 × 690 × 1460

 

Weight of Suspension Mechanism

375kg

Counter-Weight

800kg/900kg

Weight of Lifting Part

Steel Platform

405kg / 450kg

Aluminum Platform

260kg / 280kg

* Voltage and frequency of the motor can be manufactured to meet the needs of the customer's requirements

Suspended Platform ZLP630

 

Suspended Platform ZLP630

 

Q:The staff on the construction platform shall not exceed the number of people
There is no specific specification that should be more platform-specific
Q:There are differences between the construction elevator and the construction elevator
Construction lifter and building construction elevator, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction lifter is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. There are many kinds of elevators in construction, there are no two kinds of weights and weights in the way of operation, and they are controlled by manual control and automatic control. You can also add inverter and PLC control modules as needed, and also add floor calling devices to the peace layer.
Q:Is there any violation of the law after the construction elevator is scrapped?
Wire rope derrick type: 5 years Gear rack: 8 years After the accident, the person in charge will be unlucky
Q:The construction elevator can only go up can't come down what happened
Does the motor have electricity when it falls? Look at the switch and the line first, then check the controller.
Q:Are there any good signs in the construction elevator door
Above is construction, safety, please stay away from the ground.
Q:How to adjust the weight limit of the construction elevator
You're talking about a weight monitor! There are a lot of models and not a good idea.
Q:Construction elevator positioning should consider which problems
First make sure that the whole fence can be put down, and there should be no other extension of the fence that does not interfere with the lifting up and down of the cage Considering the length of the wall support, ensure the effective adjustment of the enclosed wall Then consider the installation of the wall support Consider whether access to the building is appropriate Some sites have been put into buildings directly, and some sites have considered scaffolding between them
Q:How many kw is the sc construction elevator
A double cage, the three-drive is 11 * 3 * 2KW and the two drives are 12 * 2 * 2KW
Q:What's going on with the decline in construction lift
Check whether the brake work is valid.Check to see if there is any problem with holding the brake.
Q:Where is the location of the elevator in the project
The position of construction elevator is usually set in the project to facilitate access to material, material handling and personnel up and down, not affecting the construction process.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords