Steel Ringlock Scaffolding for High Rise Construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 100000 kg/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Steel Ringlock Scaffolding for High Rise Construction
Quick Details
Place of Origin: | Brand Name: | chuangyu/CY | Model Number: | steel ringlock scaffolding for high rise construction | |
Material: | steelQ235/Q345/aluminium | Standard: | ISO9001:2008 | Name: | steel ringlock scaffolding for high rise construction |
Finishing: | power coating/HD Galv/painted |
Packaging & Delivery
Packaging Detail: | pallet bundle or as your request (steel ringlock scaffolding) |
Delivery Detail: | 15-20 Days after payment (steel ringlock scaffolding) |
- Q: Is there a such thing as a scaffold fracture?
- Are you sure you didn't mean to say Scaphoid Fracture. The scaphoid process is a projection coming from your Scapula(shoulder Blade), that connects with the clavicle( )and humerus(arm). Hope this helps thanks.
- Q: In the process of high-rise building construction, bowl buckle type steel pipe scaffolding foundation and foundation treatment should meet the requirements
- In fact, the construction of high-rise building scaffolding over a certain height, should be carried out economic comparison, otherwise, the height of a one-time erection is too high, the cost will be high.
- Q: I have been siding my house using pump jack scaffolding on wood poles. I am at a second floor section that is located over a pitch roof. Is there a safe way to mount poles on top of pitch roof to finish this section?
- At that height you need support beams, scaffolding alone won't cover it.
- Q: I got my industrial pierced about three days ago. The shop I wanted to go to closed so I went to another one that cost a bit more. The guy who pierced it said to only clean it with warm water, but when I got my helix, tounge webbing and angel bites I was told that all new piercings need disinfectant. What are some disinfectants I could use and am I right by doing this or should I listen to the piercer?
- Well you definitely need to use more than just warm water to clean it. Try using something like Provon soap and do sea salt soaks at least twice a day to keep it clean.
- Q: Full house scaffolding height of more than the number of meters experts need to do
- Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction. Mainly in order to work or work on the construction of the perimeter of the safety net enclosure and high altitude installation components, etc., is put on the shelf, scaffolding materials are usually made of bamboo, wood, steel or synthetic materials, etc.. Some projects also use scaffolding as a template, in addition to advertising, municipal, transportation, Luqiao, mining and other sectors are widely used.With the Chinese construction market is becoming more mature and perfect, bamboo scaffolding has been gradually out of the construction market, only in some remote and backward areas are still in use; and the door type scaffolding, scaffolding used only in small amounts, municipal bridge engineering, ordinary steel tubular scaffolding because of many advantages of the simple maintenance and long service life and low input cost, China occupy more than 70% of the domestic market, and have larger development space.
- Q: Hello, in a Construction project who is required to check the scaffolding equipment?check the installation? and frequently check the scaffold during the day?is it the Planning supervisor, Contractor, Principle contractor, CDM coordinator or Works manager
- as a builder for over forty years ..i have never seen anybody check the scaffold once it is erected ..and providing it has not been altered it is the scaffolding contractor who is responsible for it ..and its extremely rare for a contractor to have his own scaffolders ..here in the uk they have work strictly to a code of practice and carry a public liability insurance
- Q: There are three instances (hester alone, dimmesdale at night and the last time) and itd be reallllly great if someone could help me find quotes :)
- I Yahooed it and got plenty of quotes so try 'Scarlet Letter + scaffold'.
- Q: What are the specifications for the setting of the wheel - fastener scaffold
- Technical code for safety of steel tubular scaffold with couplers in construction
- Q: A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold. If the plank's mass is 20kg , how close to the left end of the plank can he stand without tipping the plank? ( The scaffold supports are 2.5m apart, and the plank extends beyond the scafold supports, 1.5m on each end.)
- The mass of the plank on the left side of the scaffold is: M? = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L? = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T? = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M? = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L? = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T? = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T? = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
- Q: Tell me how much the shear strength can reach MPa, thank you
- The type of steel pipe is 48 * 3, and the wall is made up of 2 steps and 3 spans, the vertical distance is 3.60 meters, and the horizontal distance is about 4.50 meters. Construction live load is 3.0kN/m2, taking into account the 2 layer construction. The bamboo scaffold board piece, load 0.15kN/m2, calculated according to the laying of 13 layers
Send your message to us
Steel Ringlock Scaffolding for High Rise Construction
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 100000 kg/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords