Steel Coupler Rebar Scaffolding Tube as High Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 4000 pc
- Supply Capability:
- 500000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Scaffolding Tube High Quality
1.Description of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube:
Advantages of Cut and Bend Services
Rebars are cut and bent to exact specifications, ensuring precision and consistency.
Cut and bend reinforcement bars do conform to BS 8666.
Material wastage is controlled and reduced.
Lesser on-site labour is required.
Better utilisation of on-site space, logistics and reduction of inventory on-site.
In-house processes and procedures that ensure traceability down to the order level
Weather independent
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
6.FAQ
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q:Any advise on nerves? I have 11 piercings but I'm still terrified of needles! Any tips on keeping my cool?
- I got my industrial two days ago and it was my first piercing besides the standard lobes and i heard it hurt the worst of all the ear piercings and u have 11? Lol if I could do it u can do it lol I was soooooo nervous and then it just happened and not gonna lie it hurt a lot lol but what I did to distract myself I just talked really loud about the pain lol I was like O MY GOD IT HURTS SO BAD lmao and now it's a lil sore but ull be happy with the results :D
- Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
- some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
- Q:A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
- Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
- Q:improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
- I believe that you have covered it all. Improper handling covers my first thought; workers carelessness by not following safety guidlines
- Q:My mom wouldn't let me get snakebites or cyberbites but she will let me get my scaffold pierced. I know people have different things for pain etc etc I know it will hurt but I want it pierced. So, to someone who has gotten it pierced or knows about it is there anything special you have to do to take care of it or is it just like the ear lobe piercing.
- it probably does hurt cuz of your cartilage just put rubbing alchahol on it and it should be okay =)
- Q:What are scaffold spanners used for?
- Ratchet Podger Spanners...Aluminium Scaff Spanners Spanners are wide wrenches that are made from durable metals. Spanners are made specifically for scaffolding and are designed to fit into the tool belt nicely. Spanners are very useful for a number of jobs and are often used along with other scaffold tools on a safety lanyard to prevent dropping the tool to the street below. Spanners work the same as traditional wrenches but like many scaffolding tools are made with a hole in the end of the wrench for the safety strap to be inserted through. Stainless steel and aluminum are the most commonly used metals for spanners to ensure durability even if the item is dropped from high.
- Q:This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
- The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
- Q:Cantilever scaffold technical disclosure
- Vertical bar, vertical horizontal bar (large cross bar) of steel pipe length of 3-6 meters, horizontal horizontal bar (small cross bar) steel pipe length of 1.1~1.3 meters, the lateral bracing steel pipe length of 3-4 meters.
- Q:Im hoping to get an industrial/scaffold piercing done at the very beginning of the summer holidays.Is it possible that they can be pierced with 2 separate pieces of jewellery rather than one bar.Also would it be healed in time to take it out once the holidays are over (6 weeks)??Please help??!?Thanks x
- Yep, some piercers prefer to do it that way. Just make sure you let them know that that's what you want when you go into the shop and they can accommodate you. No cartilage piercing is healed enough to remove in 6 weeks. Cartilage piercings can take anywhere from 6-12 MONTHS to fully heal.
- Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
- Link Scaffolding = A search found no answer. - Ask teacher to clarify.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Steel Coupler Rebar Scaffolding Tube as High Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 4000 pc
- Supply Capability:
- 500000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords