Steel Coupler Rebar Scaffolding Steel Scaffolding Tube with Price Low
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 200000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Scaffolding Steel Scaffolding Tube
1.Description of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube:
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
6.FAQ
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q: What are the general specifications of bowl buckle scaffold?
- Different specifications of the bowl buckle scaffolding accessories in the use of steel pipe materials and fasteners are different, the price is naturally the larger the price will be more expensive. What are the advantages of bowl-scaffold: Processing 1, scaffolding is very simple, the most commonly used 48 steel pipe, welding on the bowl, fastener scaffold steel pipe improvement can even use the traditional.
- Q: Which kind of scaffolding is the most convenient and time-saving?
- 4, the new type of formwork is the most suitable for the early removal of the keel, through early demolition can save a lot of keel, formwork and support rod, saving about 30%.5, strong and durable, plug and socket is not afraid to fall, not easy to be dead by cement, easy to transport, easy to inventory. At the same time, there is no loss of spare parts, lower than the bowl buckle type multifunctional scaffold.
- Q: My mom wouldn't let me get snakebites or cyberbites but she will let me get my scaffold pierced. I know people have different things for pain etc etc I know it will hurt but I want it pierced. So, to someone who has gotten it pierced or knows about it is there anything special you have to do to take care of it or is it just like the ear lobe piercing.
- it probably does hurt cuz of your cartilage just put rubbing alchahol on it and it should be okay =)
- Q: Scaffolding installation process, construction preparation
- Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
- Q: Scaffold removal should comply with those requirements......
- Preparation of scaffold safety demolition before demolition1 check the scaffold fastener connection, the wall, the support system is in line with safety requirements.2 according to the inspection results, supplement and improve the design of the demolition process, and after the implementation of the approval.
- Q: scaffold, where to buy?
- heres okorder there are many different sizes and kinds of scaffolding , buy what best suits your needs...
- Q: This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
- The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
- Q: Hi(: My names Tasha, and I love piercings. (I have 8) And I want to get an industrial piercing(Some call it a scaffold). But my ear doesn't have a bend like most people do.I got my first four piercings done by a professional. But felt I was much more comfortable having my brother(22) do it. Since he's someone I know, and hes done piercings and stuff before.
- This is why you need a pro. I can see where you should probably put a helix-to-helix industrial in that ear, but if yall can't see it, then I don't think you should be trying this, as neither of you have the experience a professional piercer does.
- Q: What are the requirements for the construction of the scaffolding structure?
- The invention also provides an anchoring device for anchoring a scaffold structure to a building. Arm with longitudinal axis. The anchoring device further comprises an anchoring device which is fixed to the building by the anchoring device and the scaffold structure.
- Q: scaffolding business?
- The only scaffold I know of is building a frame and puttin boards on to walk on, so one can do physical work at different heights.==I hope this helps you in building something to building up your business needs.
Send your message to us
Steel Coupler Rebar Scaffolding Steel Scaffolding Tube with Price Low
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 200000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords