• spider lift  28m System 1
  • spider lift  28m System 2
  • spider lift  28m System 3
spider lift  28m

spider lift 28m

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Model:FM280
Max.working height28M
Max.platform height26M
Loading capacity200KGS
Lateral Outreach11M
Platform rotation180°
Jib rotation180°
Turntable rotation360° non- continuous
Size of platform1.2×0.8×1.1M
Overall stowed length7.70M
Overall stowed width1.7M
Overall stowed height2.10M
Power capacity 
Standard power sourcediesel engine  
220V AC power
Driving speed0-1.5KM
Max climbing ability30°
Total weight4600kgs



Q: What about the heat treatment of the lifting platform?
The silk rods are generally used for the processing of the adjustment, and the semi-finishing process is a stabilizing stress treatment.
Q: What is the use of a silk pole elevator?
It can be used in single or combination, which can be controlled by a certain degree of accuracy, which can be driven directly by electric motive or other power. It can also be manually, with the maximum input speed of 1500r/min, the maximum speed is 2.7 / min. There are different structural forms and assembly modes, and the height is customised according to the user's requirements. The change device can be self-locked.
Q: What can be done when the hydraulic platform is down?
You can't see your schematic diagram, theoretically do not use hydraulic lock, should balance valve, the frequent switch of hydraulic lock causes jitter and unstable. Shunt valve, speed regulating valve or pressure compensating valve is a common solution to solve synchronization problem. Synchronous diverters are expensive
Q: What is the reason for the automatic lowering of the hydraulic platform
The hydraulic lift can rise steadily or maintain position because of the pressure oil in the cavity.
Q: Hydraulic platform repair work instruction book, trouble which big man helps to provide
The maintenance system of elevators is maintained every month. Roller, intermediate shaft and bearing, oil cylinder pin shaft and bearing, arm hinge shaft and bearing, etc. All parts are filled with lubricating oil to extend the life of the bearing.
Q: Where do the elevator motors go?
Electric elevators are widely used in factories, hotels, buildings, malls, stations, airports and stadiums. Can be used as a maintenance tools, paint decoration, change the lamps and lanterns, electrical appliances, cleaning and maintenance, power lines, lighting appliances, overhead pipeline installation and maintenance, air cleaning, etc. A high-altitude assignment for a single person. It can easily enter and exit the common entrance tunnel, and can enter the ordinary elevator to carry the multi-storey building work. The two phase power supply is used for the power, the infinitely variable speed, the user's high-altitude operation is safer, more convenient, the noise is small. It is ideal to use fast and convenient.
Q: What certificate is required to operate hydraulic platform
I don't know that hua nanjun helped me to do other people's production. You can call and ask for advice. I don't know. Check it online...
Q: How to use the elevator to be safer and more efficient
Monthly check Roller, shaft and bearing, oil cylinder pin shaft and bearing, arm hinge shaft and bearing, etc. All parts should be filled with lubricating oil to extend the life of the bearing. Oil and oil level of hydraulic oil. The platform rises all the way up, and in this position, the hydraulic pressure should be 40 to 50 mm above the bottom of the box. The hydraulic oil is dark, sticky or gravel, etc. If found, it should be replaced in time (32 # hydraulic oil).
Q: Simple manual lifting mechanism, a nut a bolt can
The next face is worn, welding a circle, ok turn, rise, also can not be fixed, also can rise! The general problem is not too big, it's a two-point position, if it's fixed at three points, it's high in accuracy
Q: What should the chain's main elevator be aware of when installing the chain
The rail link elevator usually requires a design pit. For equipment and the ground level factors, design should be carried out in accordance with the actual demand design pit size, at the same time when the production equipment shall be carried out in strict accordance with the size of the pit production.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords