spider lift 23m
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model: | FM230 |
Max.working height | 23m |
Max.platform height | 21m |
Loading capacity | 200kgs |
Lateral Outreach | 9.30m |
Platform rotation | 180° |
Jib rotation | 120° |
Turntable rotation | 360° non- continuous |
Size of platform | 1.2*0.8*1.1m |
Overall stowed length | 6.50m |
Overall stowed width | 1.60m |
Overall stowed height | 2.10m |
Power capacity |
|
Standard power source | diesel engine |
220V AC power | |
Driving speed | 0-1.7km/h |
Max climbing ability | 30° |
Total weight | 3700kgs |
- Q: How does the table in the middle of the tatami mat go up and down
- Need to buy the metal platform of suitable height, use screw to install small table board. Steps are as follows: Installation: desktop lock desktop board with screws on the top of the lifting platform (such as manual lifting platform should be first in the middle of the desktop is boring, the size of the hole to match the rocker tank size).
- Q: There is no easy way to push the goods when the platform is loaded.
- It's convenient to push forward when you need to, the load is 300, 500, the main view is that the main building needs, I know what I know, please take it... Hey hey.
- Q: What is the phenomenon of the worker's transport of wood using a lift
- The stationary elevator is a kind of stability and stability, can not move can only hold the homework, makes the high-altitude homework to be easy. The transport of goods mainly used in production lines or between floors; The material is up and down. Adjust the height of the workpiece when the workpiece is assembled; Top feeder: Lifting up parts when large equipment is assembled; Material on large machine tools; The warehousing and loading and unloading facilities shall be equipped with the loading and unloading of goods such as forklift truck.
- Q: Tomb raider 9 research base elevator to go to go to go to go to the order to pry the gear not to go down to go down to go down the card 3 to break up
- When I play this card for a long time, also I am getting rid of the four is only the past, the front three gear easy to find, the fourth in 3, 4 layer between the right of the lift, there is a hole, was blocked by a few boards, you can go out from there the fourth also make it
- Q: Does the shear fork lift stand belong to special equipment?
- It belongs to special equipment, the manufacturer must have special equipment production qualification "special equipment manufacturing license" to be able to produce the sale shear fork lift machine. The products of the manufacturer without relevant documents are not eligible.
- Q: How is the lifting handle of the universal knee-milling machine very tight
- Maybe it's too tight.I hope my answer will help you.
- Q: How to use the ball screw platform?
- Second, heyman screw can see lu, platform settled on first use, carefully to see if there are any more abnormal hydraulic parts, electrical appliances, layout, to ensure that no more than about geomagnetic held before commissioning, no-load again after 3 ~ 5 times a load test.
- Q: How to improve the oil leakage line
- Hydraulic cylinder oil leak, should be hydraulic cylinder seal damaged, want to replace seal, also check hydraulic cylinder piston Wear and burrs, piston wear and burrs are easily damaged by sealing, causing oil leakage. If you have That requires a new hydraulic cylinder or professional maintenance.
- Q: Introduction of vertical elevator milling machine
- Vertical knee-type milling machine is a general-purpose milling machine. Vertical milling machine by end milling cutter, end mill, cylindrical milling cutter, saw blade milling cutter, wafer cutter, end milling cutter, and various forming milling cutter for machining various parts.
- Q: How to use the elevator to be safer and more efficient
- Constantly check the operation of the various agencies is normal, have no noise, if find fault, the elevator must be eliminated in time. 2, check the connection of the ministries, such as loose should be tight. When the compression of the connecting bolts should be in body check firmness, slightly shaft must have a split pin all connections, and to open fully. Always check all electrical wires and cables for damage. Make sure to cover and replace damaged parts in time. When the motor is overheat, stop the engine in time, and then keep running after the failure. The motor bearing lubrication is good.
Send your message to us
spider lift 23m
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords