• Solar PV Cable(photovoltaic cable) System 1
  • Solar PV Cable(photovoltaic cable) System 2
Solar PV Cable(photovoltaic cable)

Solar PV Cable(photovoltaic cable)

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
2000 km m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Application: t is suitable for various fields in the solar energy plant or PV system. Product performance standards: IEC61215, TUV 2Pfg-2007 and UL4703.


Features: 1.Conductor resistance at 20℃ meets the standard requirements. Sheath surface resistance is ρ≥109 Ω.cm.
2.The temperatureof waterpressure test is 20±5℃, immersion length 10M,one hour, Ac power frequency voltage 8000V, maintain 5min not breakdown.
3.Vertical burning test: Fixed point and the carbonation beginning point distance ≥ 50mm; burning down retardant to fixed-point distance ≤ 540mm. Combustion gas corrosion test: pH value≥4.3, conductivity ≤10μs/mm.
4.Inner insulation mechanical properties, the tensile test before aging: tensile strength ≥ 5N/mm2,elongation at break ≥ 200%; after aging (135 ± 2 °C), tensile strength change ≤ ± 30%, elongation at break change ≤ ± 30%. Airbomb aging tensile test: air pressure is 5.5 bar (127 ° C); tensile strength change ≤ + 30%, elongation at break change ≤ + 30%. Hot drawing test: oven temperature is 250 ± 3℃, mechanical pressure20N/cm2, Load elongation ≤ 100%, elongation after unloading≤ 25%.
5.Sheath mechanical properties of stretchingbeforeaging: tensile strength ≥ 10.0N/mm2; elongation at break change ≥300%; after aging (85±2℃): elongation at break ≥ 250%; tensile strength change ≤ ± -15%;elongation changesat break less than -25%.


Cable cross-section figuration:


Q:Apple 6splus charge may not support this accessories how to do more
5 small cable, if you feel high cost Can be from the distribution box to the circuit The first light using a small cable low-voltage bus to the equipment side, due to the power distribution room to the equipment side will appear more climbing, bus installation climbing very troublesome and affect the beautiful, The bus outlet cabinet uses cables and installs the transfer box on the busbar
Q:Why this cable has not yet been certified
The manufacture of wire and cable is completely different from that of most electromechanical products
Q:Do not know why not mislead. The The The The The Fire resistance is IECGBBS6387. GB is the general principle of flame retardant and fire resistant wire and cable, quoted the above criteria...........................
About 140 PVC threading tube, which depends on how many lines you row. PPR cold / hot water pipe 42 meters, PPR cold / hot water pipe with 4 m / root and 6 m / root of the points, short will make the joints more recommended to use long, generally longer expensive. Decoration in meters to count, to facilitate the settlement of labor, 42 meters is the amount of my home My house 115 square meters, indoor area of 98 square meters. I hope useful to you. According to the 2011 price, the general brand of wires and pipes, their own materials to buy, without artificial about 4000-5000 yuan. I decorated last year, the package to the decorating company hydropower workers with me to calculate the 9800 yuan it, of course, each region has a price difference.
Q:This cable or accessory has not been certified and may not be able to work with this iphone reliably
The installation process is a certain requirement, high and low voltage cable bridge should be installed separately as usual, a wall laying vertical pipeline (slot) or installation equipment, the power distribution between the depth of D1 = 1200 ~ 1500mm; weak Between the deep distance from the D2 = 1100 ~ 1400mm more reasonable. The length L1 and L2 between the power distribution and the weak can be determined according to how much electrical equipment and pipelines (slots) are installed in the room. "Civil building electrical design specifications" proposed "shaft size in addition to meet the wiring spacing and terminal box, distribution box layout must be the size, but also in the box before the left not less than 0.8m operation, maintenance distance" requirements. In the weak equipment, the operation and maintenance distance is not specified in the provisions of the Code for Electrical Design of Civil Buildings, but it should not be less than 0.8m. Cable to wear steel pipe wiring, should be reserved in the floor steel pipe, wiring should be completed after the plug fire fire blocking material. Cable bridge installation should be horizontal, the maximum sag should not be greater than 10 mm; proposed separate installation
Q:Engineering materials inspection, all types of cable wires should be issued a test report?
LCD TV can not be connected to the top of the box and DVD reasons: the connection line is wrong, you need to re-connect the video cable or high-definition multimedia interface line, component color line. . the first audio and video cable to DVD and LCD TV ("video 1" or "DVD" signal source); . Moreover, the set-top box and LCD TV (HDMI1 . the LCD TV, DVD and set-top box power are open; . according to the source selection, if you want to watch the DVD program, put the signal source to switch to the "high-definition multimedia interface cable (HDMI cable) Video 1 ", if it is to see the set-top box program, put the signal source to switch to" HDMI1 ". . so that put DVD and set-top boxes are also connected to the TV.
Q:IPhone6 This cable or accessories have not been certified how to solve
The color is easy to distinguish. General yellow on behalf of the video line, red white plug left and right audio.
Q:Wire and cable model ZD what does it mean
Wire pipe water problem: In fact, this problem is very serious, then this line should be scrapped or replaced, if you continue to reluctantly use not only to bring you the safety of trouble and the insulation of the wire dropped sharply! Because there is water it will lead to internal leakage can also make the wire heat caused by wire burning and trivial trivial accident, so be sure to take the necessary replacement! Supplement: the wire out of all, with the wire to grab the absorbent gauze and the like back to the twitching, many times for the gauze to dry the water, hair dryer toward the tube to heat the tube to dry and then re-layout of the new line.
Q:Four lines only reached a phase line, at the other end all charged, I use the digital pen! In addition, I often check the cable when the cable current through the dot digital pen voltage symbols sometimes have time to disappear, in other bare wires when the test keys are normal! What is this going on! Ask the heroes to give the younger brother a complete point of the answer! More
This is too difficult to give you a way to just try: with a fine wire rope, that is, lift the clothes on the stick so thick, the end of a bend, with a tape wrapped around the head, try can not wear, wear When the possibility of rotating wire rope, if you can go through the success of the half, the key is to use the wire through the more difficult, can only use the cord, hard-line 100% make life difficult.
Q:Apple 6 Charging Why always show this cable has not yet been certified
Set-top box with the AV cable connection: yellow - video, red and white - audio, corresponding to the TV's AV input interface can be connected (do not receive the TV component interface). As for the emergence of partial pink, the possible reasons are: . poor contact. You will re-connect the three-color AV cable to the set-top box, on the TV, to ensure good contact. . cable quality. Three-color AV cable may not be the quality, if you can replace a group of try, or use the DVD and other equipment connected with the TV to test the AV line with or without problems. . TV AV input failure. You can use other video source equipment connected to the TV test, such as: DVD, VCD machines and so on. . set-top box failure. May be set-top box AV output port problems, if there are multiple sets of AV output, you can try other port okay, not the case may be the quality of set-top box, call customer service it.
Q:What machinery is required to make wire and cable?
Oh, the pipeline is poured before the layout according to the design drawings.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords