Solar Panel MS-P230(60) Poly Solar Cells
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 watt
- Supply Capability:
- 100000 watt/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Solar Panel MS-P230(60) Poly Solar Cells
Physical characteristics
Dimension | 156mm X 156 mm ±0.5mm |
Wafer Thickness | 200um ±30um |
Front(-) | Four 1.1mm wide bus bars(silver) with distance 39mm, Acid texturized surface with blue silicon nitride AR coating. |
Back(+) | 2.4mm wide silver/aluminum soldering pads, aluminum back surface field. |
Typical electrical characteristics
Efficiency code | 1720 | 1740 | 1760 | 1780 | 1820 | 1840 | |
Efficiency (min) | (%) | 17.2 | 17.4 | 17.6 | 17.8 | 18.2 | 18.4 |
Pmax | (W) | 4.186 | 4.234 | 4.283 | 4.332 | 4.429 | 4.478 |
Voc | (V) | 0.631 | 0.632 | 0.634 | 0.636 | 0.640 | 0.642 |
Isc | (A) | 8.446 | 8.485 | 8.523 | 8.573 | 8.660 | 8.700 |
Vmp | (V) | 0.525 | 0.527 | 0.529 | 0.531 | 0.535 | 0.537 |
Imp | (A) | 7.973 | 8.035 | 8.097 | 8.160 | 8.280 | 8.340 |
Data under standard testing conditions(STC): 1,000W/m2, AM1.5, 25℃, Pmax: Positive power tolerance.
Typical teperature coefficients
Voltage | -2.08 | mV/K |
Current | +4.58 | mA/K |
Power | -0.40 | %/K |
Typical I-V curve
Package
Typical package for one carton contains 1,200 cells. The cells are sealed in cell box every 100 pcs.
Gross weight per unit carton shall be around 16.4kg.
Cell Picture
- Q: Electric power automation equipment
- Power grid dispatching automation, power system analysis and control, power electronics, power market, distribution automation,
- Q: Complete sets of power equipment life of the country what are the provisions for the aging of the equipment how to deal with, there is no standard?
- Such as frequency of use, load characteristics, working environment, etc.. The service life of a certain type of equipment must refer to the specifications of the corresponding industry.
- Q: Power transformers and other equipment are what units procurement bidding, all those procedures!
- There are also a small number of individual units, such as large projects and large enterprises.The procedure is according to the conditions of the project are open to the public, the public required invitation required. There is also a project that is only through the construction project bidding units, equipment, the overall package to the construction unit, organized by the construction unit procurement.
- Q: What are the technical measures to ensure the safety of the power line equipment?
- Electricity, electricity, hang the ground and install signage, hanging Obscuration using personal security line
- Q: Large engineering construction (such as buildings, factories, institutions) distribution room of the power equipment as required? What's the difference? For example, some requirements never power, and some to eliminate harmonics to improve power quality, the more detailed the better the program
- Construction of electricity, then it is necessary to look at the site to enter the electricity equipment, under normal circumstances, with 380, 220V power is enough
- Q: Electric power equipment start-up and commissioning of the project there is a difference?
- The difference is that one is the equipment debugging, testing period to start, one is in the formal production of the time to start.
- Q: The two devices of the power system have those
- 4, relay protection and automatic devices, such as relays, automatic devices, used to monitor the operation of a system, rapid response to abnormal and accident, and then acts on the circuit breaker, protection control.5, DC power supply equipment, such as storage batteries, DC generators, silicon rectifier, etc., to provide control and protection of DC power supply and DC load and emergency lighting, etc..6, high frequency wave blocking device.7, since the cast device.
- Q: Definition of power equipment defects
- Emergency defectEquipment or facilities directly threaten the safe operation and the need to deal with, at any time may cause equipment damage, personal injury, large area blackout,Fire accident.Major defectsSerious threat to the human body, power grid and equipment, but also to adhere to the operation, not timely treatment may cause accidents.General defect
- Q: Pre checking and checking of goods in power system
- Pilot: the full name of the preventive test, generally in terms of a power system equipment, in order to find in the operation of equipment problems, to prevent the occurrence of accidents or damage to equipment, equipment for inspection, testing or monitoring, including oil sampling test or gas samples. The preventive test is the operation of power equipment and to maintain an important aspect of the work
- Q: Ask the expert about the design of the power system diagram, 6kV side of the electrical equipment how to supply
- 220380 through 6KV.4kvIf you need to use 6kV from the 6KV bus with the line (equipped with power distribution switch), without the 6KV transformer, your system diagram is not equipped with the outlet is wrong
Send your message to us
Solar Panel MS-P230(60) Poly Solar Cells
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 100 watt
- Supply Capability:
- 100000 watt/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords