• Sleeper factory System 1
  • Sleeper factory System 2
  • Sleeper factory System 3
  • Sleeper factory System 4
  • Sleeper factory System 5
  • Sleeper factory System 6
Sleeper factory

Sleeper factory

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Prefabricatedbi-block sleepers is the main structural component of the passenger dedicated ballastlessrailway, the accuracy and quality of which determines directly the level ofconstruction quality of the ballastless-track. At present, the ballastless PassengerLine of bi-block sleepers generally sets at the construction site prefabricatedfield. Our company uses the factory management method, standardizedassembly-line; applications and process of mechanization and automation, sothat our products have the outstanding advantages of reliable quality andcontrolled precision.

List of major equipments of thetwo-block sleepers’ field

No.

Name

Remarks

1

5T Bridge crane

Span of 18.5mconvergence of the sleeper pouring,  stripping and conservation channel.

2

5T Bridge crane

Span of 16.5m,stacking reinforced raw materials, trusses, semi-finished products  of stirrups

3

10T Gantry Crane

Double cantilever with the span of 38m,for storage and loading of the  sleepers.

4

2T Single girder crane

Span of 6m,the library palletizing for the sleepers and model maintenance

5

Forklift

Transporting, loading the sleepers and  accessories inside the  field.

6

Loaders

3m3 ZL50, Feeding gravel.

7

Air compressor

4.8m3/min,8kg/cm2,SLT-40A,offering gas  for the fabrication of the reinforced and sleepers.

8

Steam boiler and gas system

DZL2-1.25-AⅡ,ensuring the maintenance of the sleepers.

9

Concrete mixing plant

1m3 vertical shaft planets,offering concrete for sleepers.

10

Stone washing machine

Meet the needs of gravel clay content and powder  content.

11

Chiller

KRS-200,for cooling sleepers-line.

12

AC Welder

YK-505FL4Cold-rolling reinforced, and welding truss  material.

13

Gas shielded spot welder

YD-500CL5,Maintenance for equipment and model.

14

Ordinary lathe

CA1640,Maintenance for equipment and model.

15

Radial Drilling

Z3040, Maintenance for equipment and model.

16

DC welding

WS-350

17

Plasma cutting machine

LGK-100

18

Sleeper production line

Finishing all steps of sleepers production(Including:fabric  machine, vibration table, spreader, transport car, stripping station, roller,  conservation Channel.

19

CNC Bend steel hoop machine

 

20

Reinforced truss welding production line

 

21

Cold-rolled steel production line

 

22

Steel automatic butt welding machine

Unw-63

23

Cooling circulation system

(Cooling water)3.5m3 /min KR-250

24

The sleeper dedicated fixture and mother regulatory

 

25

The steel formwork dedicated fixture

 

Main parameters of key equipments- concrete distributor’sparameters


No.

Item

Parameters

1

The cart’s driving motor power

2×2.2kW

2

Concrete hopper’s volume

1.8m3

3

Length of walking cart track

>8m

4

Cart travel speed

0-0.4m/s

5

Size of concrete  distributors bucket

2500mm×1500mm×2000mm

6

Track beam’s span

>8000mm

7

Drive beam’s speed

0-0.25m/s

8

Trolley’s drive power

1×1.5kW

9

Rated voltage

220V/380V/50Hz

10

Weight

2800kg

11

Fabric screw

Drive power

4×4.0kW

Rated voltage

220V/380V/50Hz

Speed

15-35 r/min

12

Rail

Length

9800mm

Track

8000mm

Height

2500mm

Main parameters of key equipments-concrete vibration table’s parameters


No.

Item

Parameters

1

Vibration power

4×1.5kW

2

Voltage

220V/380V/50Hz

3

Elevating power

40kN

4

Roller’s drive power

1.1kW

5

Length × width × height

3000mm×1620mm×620mm

6

Roller’s speed

0-0.5m/s

7

Weight

1500kg



Q: Reader is on unimproved private road half fuel load distant from nearest known public assistance in outdoor recreationvehicle presently owned. For whatever reason the enginecannot be made to operate. Dead zone prevents cel' CB.To signal distant passer-by what are your resources? Whatare symbols that denote specific problems for aircraft fly-by?
hi there S O S, in a clearing close to your car made from bright clothing or logs around 5 feet in height, a signal mirror,or flash light, SOS is dot,dot dot dash dash dash dot dot dot. a smokey fire to direct overhead rescue, to your position. good luck.
Q: Best cardio workout from home w/ no machinery?
if you happen to have Comcast as your cable provider, in their OnDemand area they have a thing called exercise TV and they have loads of free workouts. I've been using the Biggest Loser cardio routine and it's a great workout =)
Q: no i cannot hear any machinery, no fans?
I was feeling part of the scenery... I stepped right out of the machinery...
Q: Well the machinery is hydraulic and so it trips automtically after a certain temperature. It is because of the oil or pressure or what. What should I do in order to let it run for longer time. I mean it runs for few minutes.
you need to describe your question better. Is the high temp on the hydraulic system or the crusher system? If it is hydraulic, add an oil cooler to the system and depending on the temperature desired it could be an air or water cooler. If it is the crusher, you can lighten the feed rate or open it up a little to let air go through the machine. The other thing look at the set temperature for tripping and make sure the switch is set properly. The other thing is, is the crusher set up right for the material that you are crushing. You may have to adjust the mix of feed or put another crusher in line if you are overloading it. And all crushing is not the same. You can crush aluminum cans by just squeezing them into a block or you can shred them into bits with a shredder/crusher. Not clear what you are doing.
Q: This includes simple or complex mechanical components in plain view and hidden view as well as the input and output functions, IED class-intro engineering design
Make it simple to understand.... Each key is a press switch. Each key has its own tone generator. All those tone generators output are connect to an AF power amplifier.
Q: I want to buy a machine like the one above to start a business. Does anyone know where I can buy one?
Look for concrete saws. They cut rock as well. There's a wide variety available. The link below is one place to start.
Q: a.mRNAb.tRNAc.translation factorsd.ribosomese tein polymerase
e. protein polymerase
Q: Machinery manufacturing industry can be subdivided into those sectors
Agricultural machinery @| edible oil processing equipment | slaughtering and meat processing equipment at the beginning of the soil | feed processing equipment | grain processing equipment | tillage machinery | | planting machinery plant protection machinery | irrigation machinery | harvester | field machinery | tractor | | agricultural fertilizer machinery experimental equipment | | other agricultural machinery agricultural machinery parts | fertilizer processing animal husbandry and aquaculture machinery equipment | | | fishery machinery and forestry machinery
Q: The school was like 3 months. And he says he has an offer to go to Alberta, Canada for 6 months and they'll pay him $140,000. Is this realistic, has anyone ever heard of people making that much money in 6 months?
Never heard of that. Given that the hot market in Alberta and shortage of all types of labour, it may be possible but you have to tell your friend about the skyrocketing expenses there.
Q: JFK Jr crashed his airplane while drunkJFK shot himself while drunk - and they blamed it on some guy behind a bushTeddy drown his mistress while driving drunkPatrick crashed his car into the Capital while drunkwhat's with these clowns ?
Joe operated whiskey stills ok. maria shriver has operated the terminator ok so far i guess.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords