Semi electric stacker-SPMW series
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
All products are granted CE or GS certificates by Rheinland Group. The products are widely used in the field of modern logistic. There are seven product categories and over 2000 sorts. Besides standard products, we also customizes according to your requirements.
We focus on improving our core competitiveness and grasp the trend of upsizing, intelligentizing and environmental friendly. Based on self-developement and innovation, we cooperate with scientific research institution and schools and study new products, technique and craft which are suitable for market.
- Q: What about the heat treatment of the lifting platform?
- The silk rods are generally used for the processing of the adjustment, and the semi-finishing process is a stabilizing stress treatment.
- Q: The hydraulic platform is compared with the normal lift platform
- Double protected leg structure, work safer, and can be close to the working face lift. The machine is the answer for you!!
- Q: Hydraulic platform repair work instruction book, trouble which big man helps to provide
- Jinan zhihua elevator machinery co., LTD. Is specialized in the production and development of a unit hydraulic elevator for the oil and oil. The lift is raised all the way up. In this position, the hydraulic pressure should be 40 to 50 mm above the bottom of the box. Hydraulic oil is a variation of dark, sticky or grit, such as a discovery should be replaced in time (32 # hydraulic oil) The lift is maintained every year Check all hydraulic pipes and connectors. The pipe shall not be broken, the joints shall not be loose, and all the joints must be tightened.
- Q: How to improve the oil leakage line
- Adjust the work pressure so that it can satisfy the work while not causing high pressure on the pipe. The sealing design is not reasonable, not meet the work pressure requirement.
- Q: How do I design this hydraulic lift?
- Do you do it by yourself or by design? I can give you a simple composition on qq1140283127, but I can't stick it
- Q: How do you remove the horizontal universal elevator milling cutter
- When the milling cutter is removed from the vertical milling machine, the lever nut must be released and then the end of the rod is gently tapped. ; You should not release too much, as long as you have some loose space. When you release too much, the thread connecting the rod and the milling cutter is too short, and when you tap, you slip and even drop the knife.
- Q: Can the stepping motor drive the hydraulic platform?
- The hydraulic platform is driven by an oil cylinder, and the motor drive is a completely different way through mechanical means (screw, chain, gear, rack, etc.). In addition to mechanical means, depending on the power size, the step motor usually means that the equivalent power is not much, the maximum is a few hundred watts. The hydraulic platform is generally heavy, so it's unlikely. Or do you use a step motor to drive the hydraulic pump? It can, but also to consider the power problem, said earlier, smaller power stepping motor, if the original motor is a few kilowatts, certainly not.
- Q: The automatic mahjong machine has a lift station always one. What is the other three normal
- The synchronous motor is out of control, or the motor is broken by a series of windings
- Q: What is the difference between elevator and elevator platform and high-altitude platform
- The elevator will use the motor to reverse the deceleration and pull the cable to lift the basket. The platform, like the high-altitude operating platform, USES hydraulic oil to pressurize or unload the platform. High altitude (pinyin: gao kong zuo ye) refers to the work performed at a certain location on a high level. National standard GB 3608-2008 "high job grading" regulation: "where in the fall for more than 2 m height datum (2 m) to operate the heights of the likely to fall, are called high homework." According to this rule, the scope of the construction industry is quite extensive. When working in a building, operate on a shelf above 2m.
- Q: The hydraulic cylinder with hydraulic platform is changed to whether the cylinder is feasible
- The pressure cylinder is very close, the hydraulic cylinder is not suitable to change to the cylinder, the change is equal to make a new cylinder.
Send your message to us
Semi electric stacker-SPMW series
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords