Semi-Electric counterbalanced crane-SPN-P-J
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Semi-Electric stacker with hook, lifting by electric, moving by hand, boom is flexible.
Ideal for lifting and moving mould,clamp,goods in workshop.
Ideal for lifting and moving mould,clamp,goods in workshop.
Easy to use, smart, widely applied.
- Q: Who knows the price of a sloping platform?
- You're asking too much! Do you know how big is your mesa, aspect, slope, a direction tilt, lifts the lowest, highest, up to how much time and so on, is behind the question welcome phone
- Q: The characteristic of shear fork platform
- Shear fork lift platform is mainly used in the logistics industry, production lines, lifting, loading and unloading goods to floor between basement, can also be used to lift stage, lifting work station, etc. The product has a stable structure, low failure rate, reliable operation, safe and efficient and easy to maintain.
- Q: The structure of the universal elevator milling machine
- The bed is used for fixing and supporting milling machine parts. There is a horizontal guide to the top of the beam. The front wall is a vertical guide with tails, which can be moved up and down the platform. Internal main motor, main shaft variable speed, main shaft, electrical equipment and lubricating oil pump, etc. The beam end of the beam is equipped with a hanger to support the pole to reduce the bending and vibration of the pole. The beam can be moved along the horizontal guide of the bed, and its stretching length is adjusted by the length of the pole.
- Q: You need to make a small lift platform, on top of the robot, non-industry. What you want is to add a light pole with a nut and a bolt, and you can use an electric motor to turn the bolts and the nuts.
- If use reduction motor may speed not soon (and consider the design of lifting platform under actual gravity reduction ratio), the situation of the specific need according to the design requirements, weigh the pros and cons.
- Q: What happened to the rise and fall
- Replace when necessary. Indicator, press the up button, motor rotation and lifting platform does not rise inspection or greater power contact, inverted power supply after the motor, it can be power supply is correct.
- Q: Do you have a personal elevator with hydraulic platform
- Hydraulic platform itself is not flat layer device, the upper and lower limit is oil cylinder and the mechanical structure limits. Platform only "motor" "stop" "up" "down" button. The safety of the sheared platform can also be shaken when it starts and stops, without the thought preparation. In different floor installed several travel switch, electric cabinet, become automatic stop, hardware does not need how many money, the line a little trouble. Can do it. Just installed is not good
- Q: Introduction of vertical elevator milling machine
- XD5032 X: milling word pinyin initials, on behalf of the milling machine D: should be on behalf of the manufacturer, 50: dalian is 32: vertical lifting platform structure is the most giant slalom spindle diameter of 320 mm
- Q: How to use the elevator to be safer and more efficient
- Monthly check Roller, shaft and bearing, oil cylinder pin shaft and bearing, arm hinge shaft and bearing, etc. All parts should be filled with lubricating oil to extend the life of the bearing. Oil and oil level of hydraulic oil. The platform rises all the way up, and in this position, the hydraulic pressure should be 40 to 50 mm above the bottom of the box. The hydraulic oil is dark, sticky or gravel, etc. If found, it should be replaced in time (32 # hydraulic oil).
- Q: What standard elevator platform needs to go to the special equipment inspection to report
- Hello, it should be the elevator that is rated above or equal to 0.5 t, which belongs to the special equipment management scope. Let's take a look at this rule. Special equipment safety inspection regulations
- Q: What should the chain's main elevator be aware of when installing the chain
- Oil cylinders and power unit system problems. Too much power or too little can cause all kinds of problems in the elevator, so choose the right power unit.
Send your message to us
Semi-Electric counterbalanced crane-SPN-P-J
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords