• Scaffolding Sleeve Coupler/External Joiner System 1
  • Scaffolding Sleeve Coupler/External Joiner System 2
  • Scaffolding Sleeve Coupler/External Joiner System 3
  • Scaffolding Sleeve Coupler/External Joiner System 4
Scaffolding Sleeve Coupler/External Joiner

Scaffolding Sleeve Coupler/External Joiner

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Standard:
EN74,BS1139
Place of Origin:
Shandong, China (Mainland)
Finish:
Electro galvanized
Technic:
pressed
Item:
Scaffolding Sleeve Coupler/External Joiner
Size:
48.3mm
Material:
Q235
Model Number:
SD-1021A
Brand Name:
SD
Weight:
1.00KG

Scaffolding Sleeve Coupler/External Joiner

 

Product Description

 

 1.Item:      Scaffolding Sleeve Coupler/External Joiner

 2.size:48.3mm;

3.material :Q235;

4.standard : EN74,BS1139

5.ISO 9001:2000 is approved;

6.OEM service is available.

 

 

Commodity name

      Scaffolding Sleeve Coupler/External Joiner

Usage

Fixed Scaffold Pipe

Origin

China Mainland

Material

Q235

Process

Forging

Surface

Electro-galvanized

M.O.Q

2000PCS

Packing

Woven bags + steel pallet

Delivery time

20-25 days after order confirmation

Payment term

T/T, L/C, Western Union

Business type

Manufacturer and exporter

Certifications

SGS

Advantage

1.High Quality  2.Professional service 3.Competitive price

Notes

Special marks can be made according to customers requirements;


It is available to produce by customer drawing.

Main products

Different kinds of scaffold coupler, Ringlock scaffolding system, Cuplock Scaffolding System, Kwikstage scaffolding  system, shoring prop, formwork system, frame system, Accessories

Scaffolding Sleeve Coupler/External Joiner

                                               Scaffolding Sleeve Coupler/External Joiner

.jpg

                                                                      Scaffolding Sleeve Coupler/External Joiner


picture name surface treatmentweight
Scaffolding Sleeve Coupler/External JoinerSleeve coupler  electro galvanized 1.00kg
Scaffolding Sleeve Coupler/External JoinerSleeve coupler  electro galvanized1.20kg

  

 

Company Information

Scaffolding Sleeve Coupler/External Joiner

Scaffolding Sleeve Coupler/External Joiner

Scaffolding Sleeve Coupler/External Joiner

 

We are always focusing on to supply our value produce and best service to all our customers.

 


Q: Does anyone know the name of the song or perhaps have a link to the video if they have seen it on net for example on youtube.?
Is there a bad song by Garth Brooks - no. I loved going to his concert in NYC central park. That had to be the best concert I ever attended. When he did The Thunder Rolls and had the sound effects of thunder to start the song it brought chills up my spine. Garth rocks!
Q: Exterior wall scaffold construction plan?
Vertical pole:Double row scaffolding pole, pole top high eaves 1.5m structure. Single tube base for vertical rod bottom. The vertical rod joint is connected with a butt fastener, and the vertical rod and the large cross bar are connected by a right angle fastener. When the joint is staggered, the two adjacent column joints are avoided to be in the same span, and the distance between them is not less than 50cm; the distance between each joint center and the main node is not greater than 60cm.
Q: Which God can tell me what is required, how to get ah?
The same height of the building to be calculated separately, and ultimately is to pay attention to security, you can look at the yuan Tuo mall information on this aspect is still a lot of
Q: How to maintain the scaffold after use
The use of the end of the scaffolding (including the construction of accessories) should be returned to the library, classified storage. Open dumps, the site should be smooth, good drainage, under the support pad, and covered with a sheet, accessories, parts should be stored indoors. Wuxi Dongfang scaffolding scaffolding factory products strictly according to JOD-1999 and OD15001-1205 standards, a type of mobile scaffolding scaffolding, scaffolding, roulette scaffolding, scaffolding and scaffolding accessories.
Q: So I had a scaffold/industrial done about 10 weeks ago, and its been infected at the top hole only for about 3/4 weeks. It has like a little bubble near the hole and sometimes its filled with pus a little bit and sometimes its not. Well I went the doctors about 2 weeks ago and he prescribed me a weeks worth of antibiotics as well as anti-septic cream. So I took the pills for a week and it was clearing up, I was also applying the cream twice a day. But then yesterday I noticed the lump has gotten a little bit bigger. I don't know what to do, should I take it out? But I really don't want to. And plus the doc said to wait up to 3 weeks and if nothings changed to go back and take it out. If I continue to use the cream, will it eventually go? Thanks :)
dw i had the lump for 6 months nd after a year it has finally healed but u have to be patient nd the other comment is right use tea tree
Q: The construction scheme of high rise and external cantilever scaffold!
(2): Fastener fastener should comply with the "steel pipe scaffolding fasteners" (GB15831 1995). The provisions of fastener can't crack, porosity, trachoma and other casting defects. Surface fastener and steel tube to contact good fastener clamping steel pipe, the minimum distance of the opening should be less than 5mm.(3) the foot board; steel foot plate generally with thick 2mm steel plate, and the table has a uniform distribution of anti slip hole, board length 2~4m, width 250mm of fir or pine, board length 3~6m, width not less than 150mm.
Q: THIS METAL SCAFFOLDING IS CONNECTED TO EARTH.Need 2 more questions to be answered:1.Is he going to be electrocuted if he wasn't holding the metal scaffolding?2.will the current flow through him or through the wire in both cases?
First of all, are you working with AC ( alternating current - like a house) or DC ( direct current - like a car)? Assuming you are working with AC, then: Which wire are you holding? This again is assuming 120 vac - Bare copper ( ground) White ( neutral ) or Black ( Hot ) If you have a bare copper ground wire or the White insulated wire you will be fine. If you have the Black insulated wire in your hand then you are going to have a bad day. Yes to the first question Yes to the second question ( I would hope he was smart enough to let go before being too badly zapped) Both is the answer to the third question, as the person is basically an extension of the circuit - being burnt up - until he touches earth (ground) allowing the current to seek ground. All in all I would say leave any exposed wires alone until you have a professional with a multi meter check it out first. If this is in a commercial ( business) setting the voltages are much higher, not to mention it is most likely 3 phase - so watch out. All colors are referenced for the United States.
Q: Which loads are considered in the design of the scaffold
The load of the scaffold can be divided into permanent load (constant load) and variable load (live load).The permanent load of the scaffold shall contain the following contents:
Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
Q: Okay so i have one cartilage piercing already.plan a) i just get a scaffold piercing using already the cartilage piercing i haveplan b) i get another cartilage piercing then just wait for a while get a straight titanium barbell and stick it in threw bothI also need help convincing my mom.Help Me Out Please Thnk You
the one you have needs to line up with the one you want, know what i mean. i imagine that most single cartilage piercings are not pointing the right direction to accommodate scaffolding.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords