Scaffolding Aluminium System High quality
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Diameter of tube: | Thickness: |
Packaging & Delivery
Packaging Detail: | Package |
Delivery Detail: | 25 DAYS |
Specifications
Aluminum scaffolding tower
4.8m,6.0m.9.0m,12m are available
Easy for installation
High quality,competitive prices
Aluminium scaffolding (SC-60)
Material: aluminium 6061-T6
Diameter of tube: 50.8mm with 2mm thicness
Working platform size: 2495x1250mm
Total height:6000mm
Max. working hegiht: 5000mm
Loading qty:14pcs/20' container, 29pcs/40'container, 33pcs/40HQ
Product features:
1) With EN 1004 approval
2)Fully welded design
3)Easy to assemble and pull down
4)Very tough non-stick plywood deck
5)Ladder & Hatch Deck for safe internal access
6)Toe board to prevent articles falling over
7)Weather resistant and durable aluminum
8)Strong and durable aluminum for years of usage
9)Solid aluminum short spigots for ease of assembly
10)High quality 6 meter aluminum ladder included
11) High quality adjustable 200mm castors with
12)brake or adjustable base plates available
13)Diagonal Brace ensures the platform is sturdy and stable
- Q: What is the pros and cons of the cast iron engine and the aluminum alloy engine?
- Filling system is also used to close the molecular structure, you can put an end to the condensation of water vapor
- Q: High-rise (30m and above aerial work) Building outside the scaffolding whether to conduct expert demonstration ??
- Without the norms, procedures, labor limited technology and technology can become a new technology and new technology. For example, the construction technology, in 20 years ago is a new technology and new technology, is now very mature, with the appropriate technical information, engineering guidance, reverse construction is no longer a new process of new technology. Technology.
- Q: How to Measure and Calculate the Flexible Pipe Deformation Rate
- Quantitative analysis of the problems in safety construction. In order to solve this problem, you must first understand the specification. However, the specification is not enough, not only to understand the safety load of scaffolding. Please forgive me, I am not here, in the past, it is too much trouble. In this process, the construction specification is calculated. Technical specification for safety of fastener type steel pipe scaffold (JGJ130-2001)
- Q: Clothes rack stainless steel is good or good aluminum
- The distance between the test tube is 10 meters
- Q: What is the extra aluminum alloy of the car?
- In considering vertical transport facilities, it is necessary to take into account the level of transport with which they are accompanied
- Q: Development Trend of Aluminum Alloy Cabinet Industry in Small and Medium - sized Cities
- The thermal insulation performance of these materials, the advantages and disadvantages, mainly by the material heat conduction performance level (the index for the thermal conductivity) decision
- Q: To warm the design and construction of the heating tube-intensive area spacing is less than 100mm, the external should be flexible sleeve Will the role of flexible casing is what Thank you
- . you can choose a lot of insulation materials! There are many plates! Polystyrene board, cement foam board, rock wool, composite board! . curvature is not the case, you can use the scene of the foam coagulation chicken paternity tan wine lay the end of the set of soil! The cost is relatively low, the insulation effect is also good! . this depends on your comprehensive consideration! Cost and insulation effect you choose it!
- Q: There are those children's roller shoes is one of the aluminum alloy stent,
- Try to use other fireproof materials, do not think there is no hidden place on the use of such materials can be burned
- Q: Made a sniper rifle total length of about 1.5 meters ~ aluminum tube to more than 400 to buy the aim of the mirror and the stent ~ gun dragged with a taste of two Bai fat paste mixed Thai aluminum alloy and screw decoration ~ no function is just a decorative model Is it illegal? More
- Scaffolding in the span of 4 refers to: full of scaffolding width direction, at least 4 spans, that is, there are five pole (between the two pole between a spender for the sprinkling of the fence, Table 1.2 * 1.2 ~ 0.4 * 0.. the span is 1.2 ~ 0.4m). That is, the vertical and horizontal support frame at least 4 span.
- Q: Ceiling decoration scaffolding is what material, aluminum alloy material is good?
- In fact, the identification is very simple: Extruded panels are closed-cell honeycomb hatching make-up makeup both acting on the road structure, flexibility, from the side torn off for the block structure, there are small holes! Benzene board is a granular structure, a grain of a grain, grain and grain between the gap, easily dispersed into particles!
Send your message to us
Scaffolding Aluminium System High quality
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches