• Aluminum Scaffolding On Rental System 1
Aluminum Scaffolding On Rental

Aluminum Scaffolding On Rental

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Guangdong China (Mainland)


Model Number:
HJ-truss
material:
aluminum 6061-T6
height:
2m to 40m
Loading Capacity:
Max.300KG/ floor
length piece:
2m
hieght piece:
2m
width piece:
1.4m
type:
aluminum scafolding truss with wheels
payment:
TT
delivery time:
5 to 10 dyas after receiving all payment
price:
factory price ,FOB price ,CIF price

Packaging & Delivery

Packaging Detail:bubble packaging or carton packaging
Delivery Detail:within 5-10 dyas after receiving all payment

Specifications

aluminum scaffolding truss 4 wheels
1)Easy dismantie and assemble .
2)carrying tools shall be easy
3)small storage room

Aluminum Scaffolding are new assorted aerial working production , are developed and inland custumer’s characters , its advantages are light weight , convenience to build , many kinds combination , big platform area , flexible to move .

It Can afford to many people work on the platform at the same time , increase the work efficiency largely , widely used for hotel , office sports ground , theater , hall cinema , construction company and so on , its special toy bricks build style , can meet many kinds complex work conditions .

The rapid aluminum scaffolding accord with Europe HD1004 safety standard , work height range from 2M to 40M , Flexible to assemble , rapid to load and unload , can save cost and easy storage , its light weight , prevent oxidation and fire , easy to maintain .

The Aluminum scaffolidng good point as following :

1,Light weight

It is made of light but firm aviation alluminum alloy so it is easy to assembled, move and keep. And its weight is only one third of the traditional one made of steel, which avoids any damage to the floor.

2,Safe and firm structure

It is a safe and firm platform with all joints tightly engaged. With new cold-work technique of in-expand and out-compress, oer joint is distributed with 4100- 4400 Kg, much stronger than the permitted one with 2100KG. The load of the 12M Double Deck reaches about 500Kg. Each deck can stand the weight of 272Kg and the complete tower of 900Kg

3,Easy assembly and dismantlement

It is of "toy bricks" design,with standard parts. No assembling tools should be needed. An aerial platform of 20M will be assembled by two persons within a short time.

4,Easy transit

It has castors so that it can be moved and locked easily and work at different place.

5,High applicability

It is allowed to be erected on escalators and stairways. And the castors prevent any damage on the marble or wood floor and the lawn. And it is designed for use in confined spaces such as narrow alleyways and corridors. And it can be assembled in many ways.

6,Flexible assembly

It can be designed and assembled according to any operation request of any special maintenance in all working sites.

7,Rust-proof,Corrosion- proof,Maintenance-free

All parts of the ladderspan are anti-oxygenation, with interlocks made by casting of spray pellet, which provides itself a lifespan of 30 years

MeasurementsAluminum Scaffolding have two types :

1. Double Width uprightness climb ladder scaffolding

Double width(135cm)

135cmx200cm

height

2M-40M

Carrying capacity(each floor)

300 kg

Total carrying capacity

900 kg

Material

Aluminum alloy 6082

Thickness

2mm or 3mm

2. Single Width uprightness climb ladder scaffolding

Single width(75cm)

75cmx200cm

height

2M-40M

Carrying capacity(each floor)

272 kg

Total carrying capacity

900 kg

Material

2mm or 3mm

Packing : Standard Export packing by carton

Delivery day : 10days



Q: The gearbox is good or the iron is good 490
Using aluminum scaffolding, I am here to calculate the product safe and efficient week. Beautiful appearance. Easy to reach scaffolding
Q: Clothes rack stainless steel is good or good aluminum
First, the "Safety Production Law" (Ninth National People's Congress 28 times) Second, the "Construction Safety Production Management Regulations" (State Council Decree No
Q: Puma skates with PP plastic stents and aluminum stents why plastic than aluminum is also expensive ah? In the end which is better? More
Not tested or tested unqualified shall not be used 5 demolition operations must be carried out from top to bottom, is strictly prohibited from top to bottom at the same time operations Sub-demolition of the height difference should not be greater than two steps With the wall bracket with a wall bracket, the connector must be removed with the bracket layer, is strictly prohibited to remove all or several steps before the removal of the bracket 6 unloading should meet the following requirements: It is strictly prohibited to pipe, fasteners thrown from the height to the ground Second, as China's market economy system is increasingly perfect and the continuous expansion of foreign trade, to a large extent will make our products to participate in greater competition in the market, and to make fasteners and products at home and abroad The market a firm foothold, both "keep alive", 7 operating layer on the construction load should meet the design requirements, not overload Scaffolding can not be connected with the template bracket 8 stencil bracket during use, shall not be arbitrarily removed rod When the template support base or adjacent to the equipment at the base, the trench, the use of the stent in the process shall not be excavated, or must take 9 reinforcement measures
Q: Development Trend of Aluminum Alloy Cabinet Industry in Small and Medium - sized Cities
The thermal insulation performance of these materials, the advantages and disadvantages, mainly by the material heat conduction performance level (the index for the thermal conductivity) decision
Q: To warm the design and construction of the heating tube-intensive area spacing is less than 100mm, the external should be flexible sleeve Will the role of flexible casing is what Thank you
Cast iron is the most original design, in fact, a little bit, especially in the conversion, only the cast iron can withstand high-intensity turbocharged! The famous 4G63 is cast iron, 4 cylinder 2.0 is easy on the 500 horsepower! Aluminum alloy body flash effect is good, the body weight will become low, can reduce the weight of the vehicle installation. But the aluminum alloy is very good this feature will make the re-manufacture of the body when the body to bring the process of casting technical problems. Cast iron Del flash performance is not as good as aluminum, the same volume of body weight is also larger, but the cast iron casting body is relatively low degree of difficulty. So it is good. But because of the heavy, the current trend is aluminum!
Q: What is better for mosquito nets? (Plastic? Aluminum alloy or other)
Climb up to big brother, very tiring. I now have an occupational disease. The joints are always hurt.
Q: Scaffold metal fittings are good for stainless steel or aluminum
In general, look at the process. Single material, then aluminum alloy.
Q: The store said that if you buy aluminum are imitation goods, is that so? Please professional answer, thank you more
Note that there is generally a middle of the waist, that is, protective railing General scaffolding step is 15 meters, there are 18 meters, it is decoration scaffolding Return to the topic, know what step is to understand the top step, is the scaffolding scaffolding the last step General cantilevered scaffolding will involve the top of the top step need to take a long pole, because there will be a pole to prevent the next layer of cantilevered arrangement So the need for short steel pipe in the top step to use long
Q: Two-wheel skateboard and aluminum alloy bracket which is a good point? Why are the same price is different
Section 6.4.4 of the technical specifications for the construction of fastener steel scaffolding (JGJ130-2001) stipulates that a double-row scaffold with a height of 24 m or more shall be provided with a rigid wall member Reliable connection to the building.
Q: Why all the ultra-pole all use aluminum alloy shell?
With foam plate fixed in the greenhouse on the wall from the role of insulation, with mortar paste the paste directly on the wall, probably need 7 ~ ~ 8 bags.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords