• Aluminum Scaffolding On Rental System 1
Aluminum Scaffolding On Rental

Aluminum Scaffolding On Rental

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Guangdong China (Mainland)


Model Number:
HJ-truss
material:
aluminum 6061-T6
height:
2m to 40m
Loading Capacity:
Max.300KG/ floor
length piece:
2m
hieght piece:
2m
width piece:
1.4m
type:
aluminum scafolding truss with wheels
payment:
TT
delivery time:
5 to 10 dyas after receiving all payment
price:
factory price ,FOB price ,CIF price

Packaging & Delivery

Packaging Detail:bubble packaging or carton packaging
Delivery Detail:within 5-10 dyas after receiving all payment

Specifications

aluminum scaffolding truss 4 wheels
1)Easy dismantie and assemble .
2)carrying tools shall be easy
3)small storage room

Aluminum Scaffolding are new assorted aerial working production , are developed and inland custumer’s characters , its advantages are light weight , convenience to build , many kinds combination , big platform area , flexible to move .

It Can afford to many people work on the platform at the same time , increase the work efficiency largely , widely used for hotel , office sports ground , theater , hall cinema , construction company and so on , its special toy bricks build style , can meet many kinds complex work conditions .

The rapid aluminum scaffolding accord with Europe HD1004 safety standard , work height range from 2M to 40M , Flexible to assemble , rapid to load and unload , can save cost and easy storage , its light weight , prevent oxidation and fire , easy to maintain .

The Aluminum scaffolidng good point as following :

1,Light weight

It is made of light but firm aviation alluminum alloy so it is easy to assembled, move and keep. And its weight is only one third of the traditional one made of steel, which avoids any damage to the floor.

2,Safe and firm structure

It is a safe and firm platform with all joints tightly engaged. With new cold-work technique of in-expand and out-compress, oer joint is distributed with 4100- 4400 Kg, much stronger than the permitted one with 2100KG. The load of the 12M Double Deck reaches about 500Kg. Each deck can stand the weight of 272Kg and the complete tower of 900Kg

3,Easy assembly and dismantlement

It is of "toy bricks" design,with standard parts. No assembling tools should be needed. An aerial platform of 20M will be assembled by two persons within a short time.

4,Easy transit

It has castors so that it can be moved and locked easily and work at different place.

5,High applicability

It is allowed to be erected on escalators and stairways. And the castors prevent any damage on the marble or wood floor and the lawn. And it is designed for use in confined spaces such as narrow alleyways and corridors. And it can be assembled in many ways.

6,Flexible assembly

It can be designed and assembled according to any operation request of any special maintenance in all working sites.

7,Rust-proof,Corrosion- proof,Maintenance-free

All parts of the ladderspan are anti-oxygenation, with interlocks made by casting of spray pellet, which provides itself a lifespan of 30 years

MeasurementsAluminum Scaffolding have two types :

1. Double Width uprightness climb ladder scaffolding

Double width(135cm)

135cmx200cm

height

2M-40M

Carrying capacity(each floor)

300 kg

Total carrying capacity

900 kg

Material

Aluminum alloy 6082

Thickness

2mm or 3mm

2. Single Width uprightness climb ladder scaffolding

Single width(75cm)

75cmx200cm

height

2M-40M

Carrying capacity(each floor)

272 kg

Total carrying capacity

900 kg

Material

2mm or 3mm

Packing : Standard Export packing by carton

Delivery day : 10days



Q: Is it better to use an aluminum bracket or a wooden stand?
Scaffolding demolition and step and so on, I do not know how you take, I give you a calculation tool bar
Q: The gearbox is good or the iron is good 490
Before seeing these two issues, the scaffolding is also very strange, so deliberately on the Internet to search these two issues
Q: What is the pros and cons of the cast iron engine and the aluminum alloy engine?
Air conditioning without heating the case, compared to other heating methods, the air conditioning power. When the ambient temperature is 5 degrees or more (the inverter air conditioner is slightly better and can be above ambient temperature -15 degrees) "Air conditioning is the most efficient and consumes about 1000 watts of electricity in all heating products, producing about 3000 watts of heat Power and have a better effect. "If you feel the room cool off, one hour hot and open an hour this will be more costly. Both healthy and energy-saving approach is to reduce the indoor and outdoor temperature difference. In order to set the temperature of the air conditioning, do not be higher than 20 degrees, set the best 17 degrees. Summer set air conditioning cooling temperature, neither less than 26 degrees, and not less than the indoor temperature of 3 to 6 degrees. Such as indoor temperature 30 degrees, set 27 degrees; indoor temperature 35 degrees, set 29 degrees.
Q: How to Measure and Calculate the Flexible Pipe Deformation Rate
The part price is about 2.5 times that of iron.
Q: Clothes rack stainless steel is good or good aluminum
First, the "Safety Production Law" (Ninth National People's Congress 28 times) Second, the "Construction Safety Production Management Regulations" (State Council Decree No
Q: What is the extra aluminum alloy of the car?
Just want to quietly make friends.Is it just to feel that I am so beautiful?
Q: To warm the design and construction of the heating tube-intensive area spacing is less than 100mm, the external should be flexible sleeve Will the role of flexible casing is what Thank you
Mainly the evaporator is dirty or the filter is dirty
Q: What scaffolding in interior decoration can give a construction plan? Thank you
Haier gas water heater Product Code: GD0N5100W00GJCAA. which is a production model and coding, does not represent the date. One of the joints of the gas inlet is rusted. Store in the reservoir area. Moisture may be caused by the production process. The production of the joint itself is not caused by the oxidation process.
Q: Scaffold metal fittings are good for stainless steel or aluminum
Rock wool, glass wool, soft and high fire rating, suitable for arc-shaped external wall insulation
Q: Why all the ultra-pole all use aluminum alloy shell?
With foam plate fixed in the greenhouse on the wall from the role of insulation, with mortar paste the paste directly on the wall, probably need 7 ~ ~ 8 bags.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords