Scaffolding Aluminium Profiles Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Customized Scaffolding Aluminium profiles
1. What kind of products and service we can provide:
- Aluminium profiles for construction, such as doors, windows, fence, screen, curtain wall, handrail, partition, wardrobe, greenhouse and sunroom, etc.
- Industrial Aluminium profiles for scafolding, ladder, solar energy, LED, machinery, advertisement, transport, auto part, exhibit shelf, telecom. etc.
- Doors and Windows System, include sliding door, side hung window, tilt and turn window, etc.
- Machining for aluminum and S/S products: Cutting, drill holes, punch, milling, deburr, chamfer, stretch bending, welding and so on;
- Stainless Steel Welded Tubes
- Engineering design and Consult.
Material
| Alloy: 6005, 6082, 6061, 6063, 7075 etc. |
Surface treatment | Mill finish, powder coating, anodizing, sandblasting, electrophorsis etc. |
Deep precessing ability | Drill hole, stretch bending, milling, welding, fabrication etc. |
Time of sample | 15-20days, including makeing mould |
Thickness | Above 0.7mm or customized. |
Length | Max6.6m |
- Q: What is the pros and cons of the cast iron engine and the aluminum alloy engine?
- High-rise (30m and above aerial work) Building outside the scaffolding whether to conduct expert demonstration ??
- Q: How to Measure and Calculate the Flexible Pipe Deformation Rate
- The part price is about 2.5 times that of iron.
- Q: Puma skates with PP plastic stents and aluminum stents why plastic than aluminum is also expensive ah? In the end which is better? More
- Not tested or tested unqualified shall not be used 5 demolition operations must be carried out from top to bottom, is strictly prohibited from top to bottom at the same time operations Sub-demolition of the height difference should not be greater than two steps With the wall bracket with a wall bracket, the connector must be removed with the bracket layer, is strictly prohibited to remove all or several steps before the removal of the bracket 6 unloading should meet the following requirements: It is strictly prohibited to pipe, fasteners thrown from the height to the ground Second, as China's market economy system is increasingly perfect and the continuous expansion of foreign trade, to a large extent will make our products to participate in greater competition in the market, and to make fasteners and products at home and abroad The market a firm foothold, both "keep alive", 7 operating layer on the construction load should meet the design requirements, not overload Scaffolding can not be connected with the template bracket 8 stencil bracket during use, shall not be arbitrarily removed rod When the template support base or adjacent to the equipment at the base, the trench, the use of the stent in the process shall not be excavated, or must take 9 reinforcement measures
- Q: To warm the design and construction of the heating tube-intensive area spacing is less than 100mm, the external should be flexible sleeve Will the role of flexible casing is what Thank you
- Mainly the evaporator is dirty or the filter is dirty
- Q: There are those children's roller shoes is one of the aluminum alloy stent,
- Try to use other fireproof materials, do not think there is no hidden place on the use of such materials can be burned
- Q: What is better for mosquito nets? (Plastic? Aluminum alloy or other)
- Mainly used for purification plant ceiling, enclosure, building plus layer, temporary office, warehouse and so on
- Q: Scaffold metal fittings are good for stainless steel or aluminum
- In general, look at the process. Single material, then aluminum alloy.
- Q: The store said that if you buy aluminum are imitation goods, is that so? Please professional answer, thank you more
- Note that there is generally a middle of the waist, that is, protective railing General scaffolding step is 15 meters, there are 18 meters, it is decoration scaffolding Return to the topic, know what step is to understand the top step, is the scaffolding scaffolding the last step General cantilevered scaffolding will involve the top of the top step need to take a long pole, because there will be a pole to prevent the next layer of cantilevered arrangement So the need for short steel pipe in the top step to use long
- Q: Two-wheel skateboard and aluminum alloy bracket which is a good point? Why are the same price is different
- So as long as there is no weight to press it or have a hard hit it, it is not frivolous
- Q: Why all the ultra-pole all use aluminum alloy shell?
- 003W / Mk, mainly for the refrigerator And freezers and other refrigerated insulation, the price is about 100 yuan per square The latest development of a super-fine glass fiberboard, made of this vacuum insulation board, thermal conductivity can reach 0002W / mK Do not look only fell by 0 in fact, a great progress, the general Japan and South Korea's senior refrigerator Are using this, the price of 150 or so 2 Silica as the core material, the thermal conductivity of 0004 or so, the general use of more European countries Dow Corning has been using The price is estimated at around 120
Send your message to us
Scaffolding Aluminium Profiles Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords