• scaffolding accessories wedge clamp System 1
  • scaffolding accessories wedge clamp System 2
scaffolding accessories wedge clamp

scaffolding accessories wedge clamp

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Hebei China (Mainland)


Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Couplers

Packaging & Delivery

Packaging Detail:In woven bag or in pallet
Delivery Detail:20 days

Specifications

surface treatment: white galvanized or painting
weight:0.45kg
material:steel45 or malleable
Used for Deformed Bars
of 6mm

1.Cast iron scaffolding rapid clamp for formwork

2.Material: ductile iron

3.Weight: 0.45kg or as per customer's request

4.Surface: Galvanized or painted

5.Diameter: 80,90,100 and 120mm, or as per your requirement.

5. anti-rust, skidproof, high breaking strength

6.Manufacture process: Casting or Forged

7. Body is made of Malleable Castingand the Pin is made from Forged Steel.The Teeths on the Wedge is Heat Treated for Maximum Life.


Q: What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
Advantages and disadvantages of bowl buckle scaffold(1) multi function: according to the specific requirements of construction, composed of different group frame size, shape and bearing capacity of single and double row scaffolding, supporting frame, support columns, material lifting frame, climbing scaffolding, cantilever frame construction equipment and other function. Can also be used to set up construction shed, shed, lighthouse and other structures. The utility model is especially suitable for building curved surfaces and heavy load support frames.
Q: What are the general specifications of bowl buckle scaffold?
2, of course, scaffolding to the new is better than the quality of steel is much improved with the old, regular use can generally be used for about 10 years, abandoning the bolt connection. Component jingpengnaike. Even if the corrosion does not affect the spelling and use. This does not require special maintenance and maintenance. Fastener type steel pipe scaffolding in general about 3 years on the need for screws and other operations. So I think it is convenient to bowl buckle scaffold. 3, disassembly more secure, more convenient, better performance than traditional fastener type steel pipe scaffolding.
Q: What are the characteristics of disc scaffolding
The Pankou scaffolding 60 heavy support frame as an example, the height of 5 meters of the single pole of the allowable bearing capacity of 9.5 tons, the failure load reached 19 tons, is 2-3 times of traditional products. Advanced technology: disc scaffolding connection disc to the rod force through the center node is mainly used in Europe, countries and regions, is the rise in price replacement products, the scaffold is firm, stable structure of disc type scaffold material upgrade: the main materials used in low alloy structural steel (GB Q345), strength higher than the traditional carbon steel tube scaffold (GB Q235) 1.5-2 times
Q: I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
Q: i had it done 2/3 months ago, it was fine at first but now on each end i have two lumps on my ear:S there relitavely smal...the size of like a really tiny pea.there really painfull and sore and quite red and sometimes they scab over with yellowy crust [yes i know sounds disguisting]im just a bit worried that its gone all weird or are these normal? am i cleaning it right?
I had the same situation occur when I got my scaffold/industrial done. I wouldn't be too concerned. The lumps are called hypertrophic scars, and supposedly they are pretty common and are caused by overcleaning, harsh products, or (as I think was my case) general irritation from the jewelry moving repeatedly back and forth through the piercing or being bumped around or rubbed/touched. Mine lasted quite a long time. Try leaving your piercing alone for a couple of days. Then salt water solutions or compresses are supposed to help the lumps to heal, and I also used tea tree oil and neosporine intermittently. Hot compresses like a heated washcloth applied to the area help to reduce the lumps, as well. Sometimes it's recommended to try another type of jewelry, like titanium, or switch temporarily to two separate bars. You might also try finding a really gentle cleanser/soap. I just kept my original piercing, using the above techniques off and on, and after months of the lumps remaining red and sore, they just went away totally. Just keep your eye out for any pussing (hypertrophic scars ooze, but they don't usually pus), increased swelling, and the area feeling very hot- these are signs of infectiona nd you should see your doc right away. Good luck! :)
Q: Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.
Q: What is a bar in the scaffold
Scaffolding is 1.5 meters of the cross bar is called the cross bar; long to such as the steel pipe is generally called the 6 horizontal pull rod
Q: What are the requirements for acceptance of external scaffolding? Want to know before
7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure. 8, the erection of the scaffolding on the steel pipe, fasteners, foot board and connection points shall not be arbitrarily removed. When necessary, the construction site must be approved by the person in charge of the site and take effective measures. 9, the use of scaffolding, the site should be responsible for the organization of inspection and acceptance, acceptance and fill in the inspection form before use. In the construction process should be professional management, inspection and warranty, and periodic settlement observation, found abnormal should take timely reinforcement measures.
Q: Scaffolding Vertical Standard, Length: 3000mm, Part Number AS1001
Please okorder Type ‘Aluminum Scaffolding+supplier+your location’ into its ‘Search’ panel, and click on ‘Enter’. Several pages of site listings giving details and links of suppliers who offer Aluminum Scaffoldings in, or near, your locality will be presented to you. Contact them, one by one, and then choose the supplier who suits your specific needs best. Happy hunting !
Q: Bowl buckle scaffold inspection and evaluation
(2) the focus of quality inspection of structural parts:Steel tube wall thickness, welding quality, appearance quality, adjustable base and adjustable support rod diameter, and nut with gap and material.(3) scaffold erection shall be inspected at the stage:The first 1 paragraphs to a height of 6m for the first stage (left bottom stage) the inspection and acceptance;The 2 frame should be checked regularly with the progress of the construction, to achieve a comprehensive inspection and acceptance;3 cases of more than 6 winds, heavy rain, heavy snow after the special inspection;4 shutdown for more than a month before recovery.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords