• Sc/Sc Electic Construction Hoist Elevator Motor Good Performance System 1
  • Sc/Sc Electic Construction Hoist Elevator Motor Good Performance System 2
  • Sc/Sc Electic Construction Hoist Elevator Motor Good Performance System 3
  • Sc/Sc Electic Construction Hoist Elevator Motor Good Performance System 4
  • Sc/Sc Electic Construction Hoist Elevator Motor Good Performance System 5
Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Building Hoist


Model NO.:(SC200/200)

Type:Lifting Platform

Application:Construction Usage

Tower Crane Type:Slewing Tower Crane

Sling Type:Wire Rope

Main Girder Form:Double Girder

Power Source:Hydraulic

Moving Type:Fixed

Installation:Jack-Up

Certification:ISO9001: 2000, CE

Condition:New

Max.Lifing Load:2*2000kg

Max.Lifting Height:400m

Main Power Source:3~380V

Cage Size:3mx1.5mx2.6m

Cage:Double

Mast of Section:0.65X;0.65X1.508m

Color:According to Customer Need

Warranty:1 Year

Total Power:43.5

Max. Free End Height of Guides:7.5m

Export Markets:North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia, Western Europe


Building hoist Specifiction

Elvator classification ModelRated load capacity(kg)Lifing speed
(m/min)
Motor power
(kw)
Rated fixing load capacity
(kg)
Balanced weight capacityDimension inside cage(length*width*height)
Normal frequency construction elevatorsingle cageBalanced weightSCD2002000332× 11100010003.0× 1.3× 2.4
Unbalanced weightSC2002000333× 11200003.0× 1.3× 2.4
SC1001000332× 11100002.5× 1.3× 2.4
double cageBalanced weightSCD200/2002× 200033(2× 2)× 112× 1000210003.0× 1.3× 2.4
Unbalanced weightSC100/1002× 100033(2× 2)× 112× 100002.5× 1.3× 2.4
SC200/2002× 200033(2× 3)× 112× 200003.0× 1.3× 2.4
Frequency construction elevatorsingle cageBalanced weightSCD20020000-633× 15100010003.0× 1.3× 2.4
Unbalanced weightSC20020000-633× 15200003.0× 1.3× 2.4
SC10010000-633× 11100002.5× 1.3× 2.4
double cageBalanced weightSCD200/2002× 20000-63(2× 3)× 152× 10002× 10003.0× 1.3× 2.4
Unbalanced weightSC100/1002× 10000-63(2× 3)× 112× 100002.5× 1.3× 2.4
SC200/2002× 20000-63(2× 3)× 152× 200003.0× 1.3× 2.4

Building Hoist Images


Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance

Sc/Sc Electic Construction Hoist Elevator Motor Good Performance


FAQ of Building Hoist

 

Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

Q: What is the main structure of building hoist? 

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & 

protection system, electrical top crane and safety device.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience


Q:What is the meaning of double straps in the construction elevator?
Used for heavy to offset the hoisting cage weight so as to realize energy-saving province electric hoist, by making use of the fixed pulley for heavy gravity into upward traction hanging basket of traction, so as to reduce the drive motor load, achieve energy saving.
Q:The construction elevator can only go up can't come down what happened
Does the motor have electricity when it falls? Look at the switch and the line first, then check the controller.
Q:Does the new approach builder need a localizer test report
When the distance of the meter cage is not more than the distance shown in the test, the safety device meets the requirements of the relevant specification. You're talking about a construction elevator that's the kind of gear rack that you don't want to have as long as you want to
Q:What is the main function of the construction elevator safety guard
For safety device of construction hoist main effect is in the process of elevator used in times of emergency power, hit the brakes, let hoisting cage security attached on the guide rail frame, prevent the hoisting cage falling!
Q:How large a leakage protector is used for the construction elevator
If it is 33KW, direct start, single cage, 160A, leakage action current 50ma-75ma, movement time 0.1 s, electrical machine leakage protector. The best.
Q:What's going on with the decline in construction lift
Check whether the brake work is valid.Check to see if there is any problem with holding the brake.
Q:How many meters or how many layers should the construction elevator be installed?
In the guangdong area, the first installation and acceptance of the equipment will be below 7 levels, and more than 7 floors will be charged for the inspection. Another 9 meters per wall, the most suitable installation time is a building at least 12 meters, which can be installed at 21 meters in the evening.
Q:There are two 18-story buildings under construction and tower cranes.
Do not have a regulation, as long as the benefit construction organization, installation does not install construction lift machine all can. It should be explained that the construction elevator has manned and pure cargo.
Q:What about the energy efficiency of the escalator
Variable frequency construction elevator energy saving effect general. Frequency conversion is not energy efficient. The difference between the frequency and the common machine is the smoothness and speed of the operation. Frequency conversion speeds up to 90m / 1 minutes and the average is only 35m / 1 min Frequency conversion when parking is slow down and stop Ordinary is directly stop delay parking and adjustment made door light who bow Angle decyl with brush spring connection will be better. The frequency conversion requires the site voltage to be strictly a little bit looser than the voltage requirement Energy consumption is: according to the elevator drive mechanism for general three transmission two kinds of the elevator are three 11 kw motor, that their energy consumption are 3 x 11 = 33 kw is hours each hanging basket consumes electricity 33 degrees, the actual power consumption will be bigger.
Q:What is the height of protecting door protection of construction elevator
Elevator protection door is strict according to the mandatory standard to set up elevator well protection measures for safety technology. The shaft must be set in the range of 1.5 to 1.8, with protective railings or fixed gate and protective railings or fixed doors. 2, elevator well in plus or minus zero layer need to set up the first safety net, every two layers, the upper part of most every 10 m AnQuanPing network design, network security quality must gb5725-1997 "safety net" of standard network, methods must be checked in accordance with the relevant provisions. Installation in the safety net elevator dismantlement, the operator should wear the seat belt according to the regulation. On the floor and roof, a short side hole is larger than 1.5 m, the hole should be set in the requirement of the protective railing, the bottom setting safety net. To set safety warning signs that meet national standards in the elevator shaft. Safety warning signs are clear, warning lights should be set at night. The protective railings and gates shall be marked with yellow and black stripes and shall be manufactured according to the standards of construction safety technical specifications. 5, elevator wellhead protection facilities need to dismantle or change temporarily, and by the project full-time safety sign shall be the responsibility of the project director, and ready to move or change the security countermeasures. To inform all staff at the same time; Recovery after safety facilities must be by the project director, full-time security personnel and other related personnel on-site inspection management, qualified rear can continue to use.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords