• Building Construction Hoist SC200/200 ,Electric Hoist ,Electric Motor with Double Cage System 1
  • Building Construction Hoist SC200/200 ,Electric Hoist ,Electric Motor with Double Cage System 2
  • Building Construction Hoist SC200/200 ,Electric Hoist ,Electric Motor with Double Cage System 3
  • Building Construction Hoist SC200/200 ,Electric Hoist ,Electric Motor with Double Cage System 4
  • Building Construction Hoist SC200/200 ,Electric Hoist ,Electric Motor with Double Cage System 5
  • Building Construction Hoist SC200/200 ,Electric Hoist ,Electric Motor with Double Cage System 6
Building Construction Hoist SC200/200 ,Electric Hoist ,Electric Motor with Double Cage

Building Construction Hoist SC200/200 ,Electric Hoist ,Electric Motor with Double Cage

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
100 pc
Supply Capability:
1000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Building construction hoist SC200/200 ,electric hoist ,electric motor with double cage


Descriptions of our building hoist:

The general building hoist manufactured by our company have the features as good quality, long life, wide application range and convenient for maintenance, the gering adopts imported bearing, enameled cable, and oil seal, the electric parts adopt products from world renowned manufactures such as Schneider, Siemens, and LG, the racks and pinion adopts special material and heat-treatment technique, which prolong the life of these parts. The steel structure uses quality steel from famous domestic manufacturers, the surface of the structure can apply paint-spray, Parkerizing baking finish or hot galvanizing processing according to users requirements, the cage can be produced and decorated by aluminum molded board, punched-plate or figured aluminum board.

 

Main Features of Building Material Hoist 

1.      the recommended cage dimension(LXWXH):2.0X1.0X2.5, 2.5X1.0X2.5, 2.5X1.3X2.5, 3.0X1.5X2.5, 3.2X1.5X2.5, 3.8X1.5X2.5, 4.0X1.5X2.5, 4.2X1.5X2.5 etc, we can also manufacture cages of other size according to the user.

2.      The cage and the door material can be aluminum molded board, punched-plate, figured aluminum board or other type according to your requirements.

3.      The mast and the tie-in surface can adopt paint-spray, or hot galvanizeing processing.

 

Advantage of our building hoist:

1. Our own systems of production engineering.

2. Production design from the concept to the engineering details.

3. Technical experts with great experience in the sector.

4. Continuous development of new solutions and products adapted to the requirements of our clients.

5. Methodology and project procedure administration in compliance with current guidelines.

6. Extensive worldwide commercial network

 

Specification of our building hoist:

 Building Construction Hoist SC200/200 ,Electric Hoist ,Electric Motor with Double Cage

 

 

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

sc200/200 3*2*11kw building electric hoist

Production line 

 

 

 FAQ

  1. 1.      why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 

 

Q: The electric hoist has no response. You can look it up for half a day. The new electric hoist
The contactor should be your stamp on the auxiliary contact That is the thin line of point contact undesirable Loosen the screw Or is the auxiliary contact internal contact dislocation Need to replace or sub (sub is temporary emergency measures will lose interlock function So use for a long time not safe)
Q: moped type: 50cc, 4 stroke, 20009
Not much with an engine that small. Make sure your tires are aired properly and the engine is tuned, particularly the spark plug being clean and correctly gaped. Ditto with the air filter.
Q: Will the wire rope electric gourd request an annual inspection in 2015?
On October 30, 2014, the general administration of quality supervision, inspection and quarantine of the state administration of quality supervision, inspection and quarantine (aqsiq) issued a catalogue of new special equipment, which was implemented, and the lifting equipment was cancelled
Q: Help, please. I'd like the lyrics for the 'pirate song' that is being sang the duration of the movie. It's first appearance is when the boy is singing it while everyone is being hanged? The refrain is something like this...Yo ho, all together.Raise the colors high.Heave, ho. Theives and beggars.Never shall we die. Any help is greatly apprechiated.:]]
Hoist the Colours High. Yo, ho, haul together, hoist the Colors high. Heave ho, thieves and beggars, never shall we die. The king and his men stole the queen from her bed and bound her in her Bones. The seas be ours and by the powers where we will well roam. Yo, ho, haul together, hoist the Colors high. Heave ho, thieves and beggars, never say we die. Some men have died and some are alive and others sail on the sea – with the keys to the cage... and the Devil to pay we lay to Fiddler's Green! The bell has been raised from it's watery grave... Do you hear it's sepulchral tone? We are a call to all, pay head the squall and turn your sail toward home! Yo, ho, haul together, hoist the Colors high... Heave ho, thieves and beggars, never say we die
Q: Does anyone know the lyrics for the song Hoist the colours from Pirates Of The Caribbean 3?I know the first few lines from watching the film;The king and his men,stole the queen from her bed.And bound her in her bones,the seas be ours,and by the powers,where we will, we'll roam.YoHo all handshoist the colours highHeave Ho thieves and beggersnever shall we dieGood song ennit? what are the rest of the words though?Anyone know the meaning too? I'm pretty sure it tells the story of the first court and how they bound calypso.?? :)
it is the story of how they bound calypso and sort of foreshadows the rest of the movie
Q: Are you strong enough to hoist the ‘Cup’ over your head?
you would have to be a real scrawny piece of sh it not to be able to
Q: On their state flag (implying that they respect it) while red states like Montana, Wyoming and Idaho managed to preserve a somewhat healthy population of grizzly bears?
This is the Beck logic at work: They killed the grizzlies AND they are a BLUE state. Hypocrites! Look, I'm not going to make excuses for the extermination of grizzlies in CA, but c'mon with the political connection.
Q: What type of fixtures should I look into? I already have the overhead plan designed, I just need to know how to aesthetically raise and lower it.
I'd build the ceiling as a single panel that's strong enough to stay flat against it's own weight. I'd hang it from above with linear actuators all wired to the same circuit and switch to raise it and lower it. Those would need to be long enough for your desired drop, and strong enough to hold the weight of the ceiling with a calculated spacing around the perimeter. Whether more are needed in the center areas depends on the span of the ceiling. It will cost a small fortune.
Q: I am trying to find out if it is safe and/or legal to cut a crane's wire hoist rope with a torch. I would also like to get OSHA citation or industry standard citations with your answer, please.
extremely tough thing. lookup at search engines like google. it may help!
Q: We have 2 very large armoires. We are renting a hoist to get them to the second floor balcony and we are removing the railings. We can't figuire out how to get them off the hoist once they are up there. Any help would be greatly appreciated.
If okorder

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords