SBS Modified Bitumen Waterproofing Membrane Production Equipment
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 10 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction of Modified bitumen membrane production line
The production line of modified bitumen waterproofing membrane is the most emphasized to popularize in the waterproofing industry today. Combining advantages of imported production lines with operating mature experiences, it is becoming a technology stable, high return, and efficient production line.
Specification details of waterproofing membrane:
1.Capacity: 1-20million square meters per year
2. Base material: Polyester base, Composite base, fiberglass base
3.Modified material: SBS, APP
4.Thickness: 2-5 mm
5.Machine type: Automatic or Semi-Automatic
Product name | Torch on / self adhesive type SBS/APP modified asphalt membrane |
Width | 1m |
Length | 10m or as your need |
Thickness | 1mm--5mm |
Base mat | Polyester mat / Compound mat/Fiberglass mat /Polyester fiberglass mat.. |
Surface | PE film / Aluminum foil / Mineral flakes / colorful Sand.. |
Modified materials | SBS,APP,IPP.ETC |
Production Speed | 0-50m/min |
SBS/APP modified bitumen membrane production line including devices as below:
Roll unfolding device
Intermediate feed device
Reinforcement connecting device
Reinforcement drying device
Auto rectifying device
Impregnation tension control device
Asphalt coating device
Sand-scattering device
Sand-lifting device
Filming and thickness-measuring device
Sand-pressing with suspending device
Cooling and embossing device
Finished products storage device
Traction-spring device
Auto winder device
Electrical operating control device
Mixing-weighing system device
horizontal storage tanks
Powder-conveying system
Smoke purification device
Heating with boiler system
FAQ
1. How long it will take for the lead time?
Answer: Around 30 to 40 days.
2. How about the installment for the line?
Answer: Our engineer time can go to the plant to give instructions for installment.
- Q: The difference between polymer modified asphalt waterproofing membrane and SBS
- The same stuff, the same recipe, everything's the same
- Q: What is the difference between SBS coiled material and APP coiled material?
- SBS and APP mean you want to get to know, they represent two kinds of modifiers, SBS is elastic modifier. APP belongs to plastic modifier, and any kind of coiled material produced belongs to elastomer or plastic waterproof roll.
- Q: Is the construction method of app and SBS waterproof material the same?
- This is the construction method of Qinglong waterproof SBS waterproof material. Construction points1, surface treatment: dry (water content <8%), clean, solid, smooth, dust-free soil, no oil. The angle of yin and Yang should be made of circular arc, and the joints should be treated in advance;2: to ensure the quality of coating, base coating for construction and crack resistance, Wei special base treatment with "dragon" brand CQ110, uniform coating on the base, the dry (about 6-8h), before coating construction;3, paint: paint coating uniformly on the surface with a rubber scraper or brush coating, this product is usually divided into three times, each time the coating is about 0.5mm thick; the coating must wait a coating after dry (about 6-8h) can be carried out under a coating construction;4, do isolation layer: coating work after (about 3D), in its face spread a layer of non-woven cloth or glass fiber cloth as isolation layer (30-50g/m);5, reference dosage: coating: 2.3-2.5kg/m (thickness of 1.5mm), substrate treatment agent: 0.2kg/m
Send your message to us
SBS Modified Bitumen Waterproofing Membrane Production Equipment
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 10 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords