• S826H Road Roller Buy S822C Road Roller at Okorder System 1
  • S826H Road Roller Buy S822C Road Roller at Okorder System 2
  • S826H Road Roller Buy S822C Road Roller at Okorder System 3
S826H Road Roller Buy S822C Road Roller at Okorder

S826H Road Roller Buy S822C Road Roller at Okorder

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
300 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Name: S826H Road Roller

Parameter:

 

ItemUnitS826C
Operation weightkg26000
Load on front drumkg17000
Load on rear wheelskg9000
Drum widthmm2130
Static linear loadN/cm784
Vibration frequency(Low/High)Hz27/32
Nominal amplitude(High/Low)mm1.9/0.95
Excitation force(High/Low)KN410/300
Travel speedkm/h0~10
Steering angle°±33
Swing angle°±10
Theoretical gradeability%50
Min. external turning radiusmm7180
Engine model DEUTZ BF6M1013EC
Engine powerkw160
Rated engine speedr/min2200
Engine oil consumptiong/kW.h228
Hydraulic oil tank capacityL290
Fuel tank capacityL290

 

 


Advantages:
 

state-owned company

fortune 500 company

AAcustom

 

 

 


 


Why choose us?

1 sincre

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the equipment such as tower cranes, produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to solve all your tower crane installation and other questions.  Our goal is to provide the best professional services.

3 quality

 CNBM International’s tower crane  have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.


Inquies FAQ

My dearest friend, if you want to buy our tower cranes, please tell us the following parameters. And we will make the most suitable project for!

1. Building height or tower crane working height.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements




Q: What is the advantage of vibratory vibratory roller in comparison with vibratory roller?
Vibratory roller is more widely used than vibratory roller. As the bridge deck is not suitable for vibration compaction of asphalt compaction and repair, vibration and oscillation roller can be used oscillatory compaction.
Q: Where is the driving wheel of the steel roller?
Full hydraulic drive, stepless speed change, eighth generation hydraulic single drive single steel wheel roller (SSR200AC-8)
Q: I am now the freeway road roller, teach my master pressure more than me to ask you how to bend, straightening, pressed into a straight line, now is Shantui SR22M roller!
Close your eyes, open the maximum absolute throttle gear, straight, straight contact me, wait
Q: It should be the shape of the roller! Ask friends or have other recommended rollers?
The utility model is suitable for various compacting operations of the static pressure roller by the gravity action of the machine itself, so that the compacted layer is permanently deformed and compacted. It is divided into two types: steel wheel type and tyre type. Grinding wheel grinding, grinding groove structure light and kneading etc.. The most common application of light milling is mainly used for compaction of surface layer of road vibratory roller. With mechanical or hydraulic transmission, the utility model can concentrate the compacted part of the protruding part, and has high compaction and smoothness, and is suitable for the compaction operation of the asphalt pavement. According to the layout of the axle, there are single shaft, single wheel, double shaft, double shaft, three wheel and three axle, three wheel and so on. The internal combustion engine is powered by mechanical or hydraulic transmission. General front wheel steering, good maneuverability, rear wheel drive. In order to improve the steering and rolling performance, the articulated steering structure and all wheel drive should be adopted. The front wheel frame is hinged with the frame to reduce the unusual body sway of the road surface. The rear wheel and the frame are rigidly connected. Hydraulic control, hydraulic cylinder control steering. The front and rear grinding wheels are equipped with scraper to remove the adhesive on the roller.
Q: How long does it take to go to the No. 121 bus from Changshu south station to the roller road?
Bus route: Changshu 121 Road, about 22.8 kilometers1. From the Changshu coach station, about 50 meters walk to the China Men's Center (long-distance station) station2, take Changshu 121 Road, after 41 stops, to the golden home Lane station3, walk about 870 meters, to reach the roller VillageAbout 2.5 hours or so
Q: When the asphalt surface is rolled, why should the driving wheel of the roller be geared to the paver?
The utility model is convenient for following the paver, and the driver is in good control, and the other is that the excess material can be pushed into the non rolling area.
Q: Why is it forbidden to apply diesel to the roller? In the process of roller compaction, to prevent the wheel sticking of asphalt mixture,
Diesel oil is very corrosive to asphalt, and it must have potential quality problems, but it is not too bigIf you are in the construction process, supervision, the owner does not allow you to use diesel oil,
Q: XCMG vibratory roller XP and XS? What do you mean?
As the global economy is still in a slow recovery period, coupled with China's Roller Road enterprises export major market recovery is weak, in 2013, the road roller exports situation has improved, but the growth rate is weak. In 2013, the roller main production enterprises exported 3395 rollers, an increase of 1.8%. More than 200 enterprises export roller this year, Xugong, Xiagong, Liugong, Luoyang Road, Liuzhou, mountain and other 6 enterprises. This one, because of the influence of brand and overseas channels, up to 752 units of export Xugong roller, total sales of 18.5%; export 693 units Xiagong roller, has accounted for 42.6% of total sales; Liugong exports 556 units accounted for 39.85%.Beg for adoption
Q: How can the asphalt be crushed between the road and the road, and the roller will cut the road along the stone
Be close to the kerb and be careful about rolling, and shall not be too close to the edge.
Q: Where are the rollers attached to the rollers?
Roller oil change cycle is usually 250 hours to replace, here 250 hours total working time per day, while changing the oil filter. If the environment is too bad (sand dust serious) can be replaced in advance. If you work less than 250 hours a year, it is recommended to change it once a year. But if you work less than 250 hours a year, it is recommended that you sell the road roller!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords