Ringlock Scaffold Diagonal Brace Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
1.Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
2.Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
Accessories
Packing
Inspection
Project
More Photos
- Q: i am considering getting my industrial /scaffold piercing done tomorrow just wondering price in (GBP) (?) i am in the uk ....pain rating ?healing time personal expirience and what to expect how old do you ave to be without parental consent ?
- - Mine cost ?20 including titanium bar. - I don't want to put you off or anything but for me, it was the most painful out of all of the piercings I've had. The first hole hurt the most (this was probably because I previously had a auricle piercing right u
- Q: Full house scaffolding height of more than the number of meters experts need to do
- The height of the erection of the frame is more than 24m, and only need to be designed and calculated according to the regulations.
- Q: I Got It On The 16th Of Feb This Year, I'm 14 Year's Old, So Don't Laugh, Okay I Can't Unscrew The Ball Things And How Long Does It Take To Heal Fully? __Ciara-Chemical__
- Thats an awesome piercing, nice job! I'm not laughing about being unable to unscrew it - I have a piercing in my pinna I've never been able to get out - had it for like 6 months. What I will say it that you shouldn't be taking it out yet really anyway. If you wash it in sea-salt and warm water once a day it should be almost totally healed in 8 weeks, which is still about two weeks away if you got it on the 16th Feb. Even then for the first 6 months or so it'll close pretty quickly (not in like an hour or anything, but it could get tighter in as little as 3 or 4 hours), so you should try to leave it in all the time for that 6 month period.
- Q: There are three instances (hester alone, dimmesdale at night and the last time) and itd be reallllly great if someone could help me find quotes :)
- I Yahooed it and got plenty of quotes so try 'Scarlet Letter + scaffold'.
- Q: Everybody calls it either one, i want the one that goes across the top of your ear. Would it be safer to have two helix done instead of putting the bar straight in and getting the actual piercing or should i get two helix and put a bar in once it has healed? i would ask the piercer to line the two up. ive heard that industrails go wrong alot if a bar is put right in.
- A standard helix piercing isn't the same as they are on a scaffold. A helix goes front to back where as the scaffold goes through the curl in your ear. A good piercer will do this as 2 seperate piercings with small bars till it's healed. Then fit you with the bigger bar.
- Q: I want to get this done this weekend but I'm not sure about the pain. I have my ear lobes done and the top of my ear done but I'm really worried about this one because I heard it's meant to hurt really bad. Please tell me how bad it hurts and any other additional information thanks :)
- I don't have one of these piercings but I have also heard they are pretty painful. However, it really depends on your pain tolerance. I still don't think the pain would be too bad to stop you from getting the piercing, it is pretty quick. And they look really cool, so don't let the pain put you off.
- Q: Japan SS 03 scaffolding system advanced
- Is a new type of scaffolding, the product was introduced in Europe in the last century in 80s, is the upgrading of products after the bowl buckle scaffold. Also called chrysanthemum disc scaffolding, scaffold system, disc scaffolding system, buckle disc scaffolding, layher frame (layer frame, Lei Ya frame, because the basic principle of the scaffold is by the German LAYHER (Lei Ya)'s invention, the industry has been called the "thunder sub frame". The utility model is mainly used for a light frame and a background frame of a large-scale concert Disc type multifunctional scaffolding, after the bowl buckle scaffold after the upgrading of products. The socket diameter of 133mm scaffold, 10mm thick disc, 8 hole disc, adopting 48*3.5mm, Q345B pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disc, the bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
- Q: What are the components of the bowl buckle joint in the bowl buckle scaffold
- Composition formA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.
- Q: Scaffolding construction specification is what? Do you know?
- Load requirements of the scaffolding: masonry works per square meter 2700N, decorative works per square meter 2000N, scaffolding per square meter 2500N,Scaffolding scaffolding per square meter 1000N, special circumstances to be determined by calculation.4, left foot hand eye regulation: a single exclusive console scaffold should be set foot on the wall as a small bar in the eye, the fulcrum, pay attention to not allow foot hand eye parts: adobe walls, soil nailing wall, hollow brick, brick cavity wall, independent column, half brick wall and 180 thick brick the wall brick lintel and a beam into a 60 degree angle of the triangle, windows and doors on both sides of brick and 1 3/4
- Q: How to calculate the amount of steel pipe in the bowl buckle scaffold formwork system? What is the good software or experience of the eldest brother?
- Probably on the line. The number of entry sized frame. In the actual construction, workers will be more skilled are arranged according to the room.
Send your message to us
Ringlock Scaffold Diagonal Brace Easy Assembly Top Quality Metal
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 m.t.
- Supply Capability:
- 100000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords