PRODUCT NAME:High quality Mobile Scissor Lifts--JCPT
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Model | Unit | JCPT8 | JCPT9.5 | JCPT11.5 |
Lift Rated Capacity | kg | 550 | 500 | 450 |
Platform Extend Capacity | kg | 112 | ||
Wind speed 45km/h | kg | 100 | ||
Max. Machine Height | mm | 10000 | 11500 | 13500 |
Max. Platform Height | mm | 8000 | 9500 | 11500 |
Overall Length | mm | 3700 | ||
Overall Width | mm | 1680 | ||
Overall Height | mm | 2460 | 2580 | |
Platform Size | mm | 2500X1120 | ||
Platform Extend Length | mm | 1270x1120 | ||
Ground Clearance | mm | 200 | ||
Lifting Motor | 24VDC/3kw | |||
Raising/falling speed | sec | 72/60 | 86/74 | 89/83 |
Battery | 4x6V/210Ah | |||
Charger | 24V/25A | |||
Tyre(solid tire) | 6.50-10 | |||
NW | kg | 2080 | 2090 | 2200 |
Standard Configuration
-Charge lamp
-High capacity traction battery
-Overload limit
-Extended platform
-Emergency stop button
-Emergency descending button
-Transport standard forklift hole
-Strut bar for safe overhaul
Optional Configuration
-AC power source connected to platform
-Rotary strobe light
- Q: Does the fixed hydraulic platform need to submit to the specification requirement
- There is no clear regulation of hydraulic lift and hydraulic platform in China, which means that you can also do it without testing. Local regulations may be different. Also, if you check, you are going to the local quality and technical supervision bureau. Should go to the special branch to register, apply for installation, after installation is finished again ask them to check the acceptance of the check. There is a fee for it. And it will be checked every year.
- Q: There is no elevator on the 7th floor of the home to install a lift or lift
- All manned lift, lifting platform, moreover, to pass through security, common theory suitable equipment can't be through security inspection, after you installed the safety bureau will let you immediately removed. These things are too low
- Q: The single fork hydraulic lift platform
- If you don't have a hydraulic lock on the oil circuit, it should be,I hope my answer will help you
- Q: Why is the large laser engraving machine plus half the platform?
- About whether to lift: all are generally two kinds of the lifting methods at present, screw support lifting and hydraulic elevator, screw because of the limitation of itself bearing part can only support plate lifting platform, so generally make some lifting; Hydraulic lift, JQ1325 hydraulic lift can be fully raised, the hydraulic platform can carry 4-10 tons of stone. More questions can be asked about the r&d department of jinan jinqiang laser digital control equipment co., LTD.
- Q: The home is decorated, make a tatami mat the platform should pay attention to what aspect?
- The key to the tatami mat is the choice of the middle lift. Attention should be paid to several aspects: the control mode of the tatami platform, the safety clamping system, and the manufacturer and brand.
- Q: You need to make a small lift platform, on top of the robot, non-industry. What you want is to add a light pole with a nut and a bolt, and you can use an electric motor to turn the bolts and the nuts.
- It is possible to design screw and motor power and variable speed system according to lifting weight.
- Q: How to improve the oil leakage line
- The reason of oil leakage is complicated, mainly due to the quality of the hydraulic components, vibration, corrosion, differential pressure, pipeline connection, use of improper maintenance. Elevator oil leak inside leakage and leakage. A small amount of oil is inevitable, because of the nature of the hydraulic drive. Spill in excess of the prescribed index of the phenomenon is due to leakage, generally can immediately perceptible, mainly are now the pressure drops, rapid speed of change has been ground or surface of product oil, machine equipment need often fill oil to return to the height of the aerial work platform before. Once the leak is due to be shut down, the acute operation will only take the system out and damage the engine parts.
- Q: Can the stepping motor drive the hydraulic platform?
- Are you a driver for this motor? But the normal step motor is only for torque, step Angle, phase number, not for rotational speed; It may be a servo motor or torque motor, and if the speed is low it is the possibility of torque motors. In addition, you can measure the current, voltage or waveform below.
- Q: Is the music console working? Want to start a, afraid to buy expensive again.
- It belongs to the table at the table, which means you can use it when you remove it and put it on the table.
- Q: What should the chain's main elevator be aware of when installing the chain
- The installation of the power system traction equipment interface must be done. According to our experience, part of the accident was caused by the failure of some manufacturing enterprises to do the right thing with the traction power and the host mesa.
Send your message to us
PRODUCT NAME:High quality Mobile Scissor Lifts--JCPT
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords