• Ppr Pipe Plastic Pipe Used in Garden Irrigation Made in China System 1
  • Ppr Pipe Plastic Pipe Used in Garden Irrigation Made in China System 2
  • Ppr Pipe Plastic Pipe Used in Garden Irrigation Made in China System 3
Ppr Pipe Plastic Pipe Used in Garden Irrigation Made in China

Ppr Pipe Plastic Pipe Used in Garden Irrigation Made in China

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

ppr pipe plastic pipe used in garden irrigation  Made in China



Specification:

PPR Pipe Fitting

1. OEM Available

2. Material:R200P

3. ISO15874 DIN8077/8078

4. ISO9001 14001 AENOR



PPR pipe and fitting size:

PressurePN1.0MpaPN1.6MpaPN2.0MpaPN2.5Mpa

outer diameter

dn(mm)

Wall Thickness

en(mm)

Wall Thickness

en(mm)

Wall Thickness

en(mm)

Wall Thickness

en(mm)

201.92.32.83.4
252.32.83.54.2
323.03.64.45.4
403.74.55.56.7
504.65.66.98.4
635.87.18.710.5
756.88.410.312.5



Introduction of Our Products:

The comprehensive technical performance and economic indicator of PP-R are much better than galvanized pipe, UPVC pipe, polyethylene-aluminum compound pipe, PE-X (cross-linked polyethylene) and polybutylene pipe etc. For this reason PP-R is the leading products and widely used for feed-water piping in developed countries in Europe and America.

Nowadays PPR pipes win more attention and have been used all over the whole world more widely with its excellent sanitization performance, high heat resistance, compression resistance, corrosion resistance, pliability and seismic performance which make PP-R the real environmental friendly pipe.



Applications PPR Pipe :

 1) Cold and hot water supply systems for civil and industrial constructions, e.g. in residential buildings, hospitals, hotels, school and office buildings, ship building

Irrigating system for gardens and green houses

2) Public and sport facilities such as swimming pools and stadiums

3) For rainwater utilization systems.

Ppr Pipe Plastic Pipe Used in Garden Irrigation Made in China

Q:myspace proxy?
yes they are for your protection you could pick up all kinds of germs from the food plus they keep your hands from being burned!!!
Q:does anyone know where I could locate this item .I have exhausted all my sources(stores)
1/8 inch layer will make it so anyone wanting to get the picture off will have to use a razor blade or knife to carve it out. 1/4 in layer and they'll need a saw!
Q:What does flaring pipe joint mean?
To match the cone of the joint, although the processing is troublesome, the sealing is reliable. In addition, the use of copper tubes in general, the expansion is relatively easy.
Q:Do you guys think this trio is enough to beat The Shield?
City or State code plays a factor here. Flexible K copper is not cheap plus some states require the line to be 8 feet deep. If you have old black pipe or galvanized pipe, yes you should replace the whole thing. If you can have it 3 feet deep then you can do this your self and pay a plumber to hook it up. Save big bucks. Contact your City on there requirements. Plumbing store for the copper. Rental store for a ditch witch to dig a trench. Plumber to tie in all of your fittings and to the meter. Under ground requires a flaired fitting to connect the copper lines. But for a plumber to do the job for under $36.00 per foot seems like a great price to me. It would be a great deal more here in Ohio.
Q:These are the laser safety goggles I'm thinking of wearing
Benjamin Franklin invented the lightening rod, and when he moved to deploy them on buildings he was railed at from the pulpits for subverting the will of God.
Q:I have seen some people here on YA, and even an op-ed article, saying that most of the houses lost in the fire were in dangerous locations and shouldn't have been built in the first place.
Your copper tubing should fit the new dishwasher with the replacement of the olive which is the ball that seals the connection. another option is to replace the supply line with a stock piece from Your local hardware store.
Q:About 10 seconds, there are 1 drops. Due to the previous installation and the present situation, the disassembly and dynamic welding can not be performed and the water can be cut off for a short time. Is there a good way?
What is the pressure in the pipe? The glue material is not blocked up, in the humid environment and water under the condition that the glue is not stick, reliable and economic way: cold metal flux were patching, simple and convenient, do not need what tools
Q:I need to wake up early in the morning? Do laptops have an alarm option?
I say Air, I don't know how you would make air into a costume but I say air, hope i helped
Q:The difference between the reducer joint and the strengthening pipe joint
The utility model can also be a screw thread connection, and the main function is that the large main pipe is connected with a small branch pipe, and the utility model has the reinforcing effect. When the common branch pipe is smaller than DN50, the reinforcing pipe joint can be used. If the size is greater than DN50, the variable diameter three way connection is necessary.
Q:What was the practicle application of the discovery of electricity by Benjamin Franklin after the kite experiment?
I like Oatey brand Regular clear Advanced cement for PVC. Use a PVC primer first which is usually purple let dry then using the applicator supplied in the can of cement apply a thin even layer to the outside of the pipe and then to the inside of the fitting. Working time is around 30-45 seconds. Insert the pipe into the fitting than give it a half turn. Using excessive amounts of cement is not better. The even layer you have applied will be evenly distributed with the turn of the fitting. GL

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches