polyurethane energy panels
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 60000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
System introduction:
DUOWEI PUR products adopt internationally most advanced six-component online automatic cooperation mixed pouring technology in raw material proportioning and process output, through which six-component continuous foaming is realized for the first time in China, and mixing and proportioning process can be realized online at a time; moreover, formula can be adjusted according to the environment change to make raw material mixing more even and foam smoother by cooperating with aerating and mixing device, thereby producing high strength, energy-saving and environmental protection building boards.
POILISOCYANURATE, abbreviated as PIR; composite boards developed by DUOWEI use excessive sulfone isocyanurate, so ring structure of chemical compound and higher sulfone isocyanurate index form the dense PIR, thereby making interior rigid foam more stable and have high heat resistance and flame resistance. Experiment shows that the bubble can endure 200 ℃ in a short time and can endure 160℃ in a long time.
Product features:
Concave-convex groove structure, improving tight insulation at board joints, especially designed for refrigerating chamber and storage
Boards are even, firm and stable, and have good thermal insulation performance and waterproof performance
Light weight and elegant appearance, effectively solving temperature difference of cold storage industry
The storage can freely change in three directions of length, width and height, and also can expand or narrow as necessary within certain modulus; assembled boards can be disconnected and to be installed in different place, installation is simple and rapid
- Q:What is the daily work of the warehouse?
- Raw materials warehouse must be based on the actual situation and the nature of various types of raw materials
- Q:What are the benefits of warehouse outsourcing?
- Warehouse outsourcing does not require the enterprise itself to be in the allocation of warehouse personnel, operating equipment, etc. must be put into the hardware facilities.
- Q:What is the 5S in warehouse management?
- 5S management is finishing (SEIRI), rectification (SEITON), cleaning (SEISO), cleaning (SETKETSU), literacy (SHITSUKE) five projects
- Q:What are the processes required for the company's warehouse management?
- Out of the library management, so the library items must be filled out the library, at the same time in the report to do the corresponding out of the library operation to ensure that the inventory of the account match.
- Q:What is the relationship between logistics and warehousing?
- This shows that warehousing is only one of the logistics activities, logistics and other activities
- Q:How can I manage the warehouse better?
- at the same time bear the material management of a number of business functions. Its main task is
- Q:How to do a good job Warehouse Invoicing?
- The traditional manual record of goods Invoicing has been unable to meet the enterprise's warehouse management
- Q:How to do warehouse management?
- In order to make the work of the unit in an orderly manner, the warehouse work is very important
- Q:What is the meaning of goods warehousing?
- Modern "warehousing" is not the traditional sense of the "warehouse", "warehouse management"
- Q:What do the warehouse keeper have to do and what should I pay attention to?
- ? Third, the regular clean-up of the Treasury, to keep the Treasury neat and beautiful, so that the classification of materials and equipment, storage neatly, the number of accurate.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
polyurethane energy panels
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 60000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords