Plastic Scaffold System Formwork System Formwork Steel Props
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 m.t
- Supply Capability:
- 1000 m.t/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Plastic Scaffold System Formwork System Formwork Steel Props
Product pictures:
Product description:
Name: | RingLock Scaffold System |
Category: | Scaffolding System |
Material: | Steel (Q235/Q345) |
Size: | D48*3.25mm, etc |
Surface: | Electro Galvanized, Hot Dipped Galvanized, Painted, Powder Coated |
Component: | Standard, Ledger, Diagonal Brace, Bracket, Base Jack, U Head Jack, Etc. |
Application: | Slab Support, Staircase, Stage Plateforms, Bridge Support, Mobile Tower, etc. |
Manufacturer: | OEM is Available |
Items or goods can be manufactured according to your standards. |
Advantage
* Good loading capacity
* Easy to assemble and dismantle
* Stable and durable thanks to its structual design & automatic welding quality
* Customized solution helps you work safe, save cost and convenient
* Excellent quality for formwork & scaffolding with wide choices
Other scaffolding & formwork products:
(1) Scaffolding System:
Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories; Haki Scaffolding System and accessories;
(2) Scaffolding Frame & Accessories
(3) Scaffolding Couplers/Clamps:
We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers, Italian type couplers ,fence couplers, BRC coplers and so on. We also can produce according to your drawings or samples.
(4) Formwork System Scaffolding & Accessories:
Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.
FAQ
Why Us?
We are one of the largest construction materials suppliers in China.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
We can provide you the professional design team.
We can provide fashionable and newest styles for you.
We can design the artwork for you.
Please feel free to customize.
- Q: Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
- scaffolding load shall not exceed 270kg / m
- Q: Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
- reasonable organization of construction arrangements, so that sunny day to pay attention to outdoor work, rain arrangements for indoor work
- Q: A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
- this is a 2d concern. The moments approximately any component interior the gadget could desire to stability, in any different case the gadget (scaffold) might rotate. additionally, the vertical forces could desire to stability, or the gadget (scaffold) might translate. it style of feels to me that to the spectacular from the middle of the scaffold this is a distance one 6th of the dimensions of the scaffold is the comparable as announcing 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any component. i will evaluate the left edge of the scaffold, the place the 2d produced by utilising the left rope is 0. finished M = 0 = scaffold M + guy M + spectacular rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is assumed to be a component mass placed at its middle the tension F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign sparkling up for F. To get the tension in the different rope, you may basically evaluate the vertical forces interior the gadget. besides the fact that, you're able to desire to sum the moments approximately another component (say, the spectacular rope). desire this enables.
- Q: Seeking the Responsibility System of Safety Responsibility of Each Function Department Garden company for safe production permit
- System, and to monitor the implementation of the situation
- Q: The name of the laws and regulations relating to the building, at least . The The
- Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
- Q: Such as the title, raw materials and structural parts What is the difference, how to divide?
- It is the main component form of a house
- Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
- It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
- Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
- Q: my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
- Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
- Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
- The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different
Send your message to us
Plastic Scaffold System Formwork System Formwork Steel Props
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 m.t
- Supply Capability:
- 1000 m.t/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords