Parallel Redundancy UPS Power System
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Unit pc
- Supply Capability:
- 1000 Units per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
MODEL | STANDARD | DX/CX6K | DX/CX 10K | DX/CX6KL | DX/CX10KL | |
CAPACITY | VA/W | 6KVA/4.8KW | 10KVA/8KW | 6KVA/4.8KW | 10KVA/7KW | |
INPUT | Nominal Voltage | 220/230/240VAC | ||||
Voltage Range | 120-275VAC | |||||
Frequency Range | 46-64Hz: 50Hz, 60Hz auto sense | |||||
Phase | Single phase with Ground | |||||
Power Factor | >=0.99 | |||||
OUTPUT | Voltage | 220/230/240*(1±1%)VAC | ||||
Frequency | 50/60Hz(Adjustable)
50Hz AC Mode: Follow AC Mode (AC Range 46~54Hz); Battery Mode: 50Hz(1±0.1%) 60Hz AC Mode: Follow AC Mode (AC Range56~64Hz); Battery Mode: 60Hz(1±0.1%)
| |||||
Wave Form | Pure Sine Wave | |||||
Power Factor | 0.8 | |||||
Harmonic Distortion | =<2% THD (Linear Load), =<6% THD (Non-Linear Load) | |||||
Overload Capacity | Normal when load < 105%; 105%-125% for 1 min, 125%-150% for 30sec | |||||
Current Crest Ratio | 3:1 | |||||
Connections | Terminal block | |||||
Efficiency | To AC Mode | 88% | ||||
To Battery Mode | up to 90% | |||||
Battery | Type | Sealed free maintenance lead acid battery | ||||
Nominal DC voltage | Built in batteries 12v7.2ah*16pcs | 192VDC | 192VDC | |||
Quantity | 16pcs | 16pcs | Depends on requested back-up time | Depends on requested back-up time | ||
Back-up Time (Full load) | >=7 min | >=5 min | Depends on the capacity of external battery bank | Depends on the capacity of external battery bank | ||
Recharge Time | 7 hours to 90% | Depends on the capacity of external battery bank | Depends on the capacity of external battery bank | |||
Charge current(MAX) | 2.0A | 4.2A or 8A | 4.2A or 8A | |||
Charge voltage | 220Vdc ± 1% | |||||
Bypass | Automatic Transfer | On overload and UPS failure | ||||
Before UPS Power-on | Default "ON" user adjustable to "YES" | |||||
Transfer Time |
| Zero | ||||
Indicators | LCD Display | UPS status, I/P & O/P voltage& frequency, Battery voltage, Battery capacity, Loading, Fault code | ||||
Audible Alarm |
| Bypass, On battery mode, Battery low, Overload, Fault | ||||
Acoustic noise | At 1 meter distance | <55dB | ||||
Communications | Intelligent RS232 serial port | Windows 98/NT/2000/XP/2003, Linux, Sun Solaris, IBM Aix, Compaq True64, SGI IRIX, FreeBSD, HP-UX, and MAC | ||||
SNMP (Optional) | Power management from SNMP manager and web browser | |||||
USB (Optional) | Windows family software and Mac OS | |||||
Environmental | Operating Temperature | 0~40 °C | ||||
Operating Humidity | 20~90% ( Non Condensing) | |||||
Weight | Net weight (kg) | 84 | 93 | 35 | 38 | 35 |
UPS Dimension | L*W*H (mm) | 570*260*717 |
- Q: Who knows how big transformers and lines the 36V transformer uses in lighting?
- Depending on your load capacity, primary voltage, site reservation, etc.. For example, 3.6KW lighting, with 4KVA transformers, the primary side 380V with 2.5 square (copper wire) enough, two times the side of 25 square.
- Q: Why should lighting transformers be used in factories and mines?
- But in many cases, such as mines and machinery, the voltage is too high and unsafe. The lighting transformer is then used to reduce the voltage to the so-called "safety voltage""
- Q: The difference between lighting transformers and control transformers
- The lighting voltage is 36 and 12V, the signal lamp is 6V, the control winding is 127, 110V, the one or two insulation, and the two one is grounded.Simple lighting transformers, the two voltage is not so diverse.
- Q: How to use digital multimeter to detect the quality of 36 volt low voltage lighting transformer?
- The number of tables in this table is increasing when the table rings to show 1.Method 2 is only to measure the capacitance is good or bad, can not be measured capacity.
- Q: Is the substation separate from the power and illumination transformer?
- The power and illumination of the substation are all used on a transformer, which is separated by power and lighting by the station screen of this transformer.
- Q: 3 24V100W lights, I need to use a large capacity transformer (220V change 24V)?
- First look at this lamp,.24V100W, this specification is common in the headlights of large trucks, filled with inert gas, known as the small sunThe power supply comes from the generator or battery, and the mode of operation is to ignite by alternating current and direct current. In comparison with the power supply of the transformer, the method of alternating current ignition is better to save the cost and reduce the cost
- Q: How many A leakage protection switches are used in 5000VA lighting transformers?
- AC circuit transformer for lighting lamp is suitable for 50-60Hz, is the power supply with safety shell low-voltage safety lights, can choose 220V or 380V power supply input voltage: 0V, 220V, 380V, 0V, 6.3V, output voltage: 12V, 24V, 36V.
- Q: Does the lighting work properly? Doesn't that power equipment start voltage unstable?
- It is not easy to control, the power and lighting and electricity; if the transformer capacity is small, and relatively large power equipment start frequently, voltage stability will be poor, the lamp brightness will fluctuate dramatically, have effect on visual acuity. But as long as the design is reasonable, it has little effect.
- Q: Which is more energy saving by using 24V500W transformer lighting and 220V500W lighting?
- See whether the lamp power saving, can not see whether it has a transformer, but to see the light efficiency of the lamp, that is, the ratio of light flux to power!Popular speaking, that is, spend the same electricity to see who sends more light!So, when comparing, ask what the light is, then judge again!The luminous efficiency unit is LM/W
- Q: Please tell me how to calculate the transformer in the lighting circuit of elevator shaft in building electrical design
- Because of the brightness of the 36V safety voltage lamp brightness in the overhaul work is not enough, so now the well lighting design should not be 36V, and replaced by 220V, and only need to add a leakage protector on it.
1. Manufacturer Overview
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Parallel Redundancy UPS Power System
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Unit pc
- Supply Capability:
- 1000 Units per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords