Parallel Redundancy UPS Power System
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Unit pc
- Supply Capability:
- 1000 Units per Month pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
MODEL | STANDARD | DX/CX6K | DX/CX 10K | DX/CX6KL | DX/CX10KL | |
CAPACITY | VA/W | 6KVA/4.8KW | 10KVA/8KW | 6KVA/4.8KW | 10KVA/7KW | |
INPUT | Nominal Voltage | 220/230/240VAC | ||||
Voltage Range | 120-275VAC | |||||
Frequency Range | 46-64Hz: 50Hz, 60Hz auto sense | |||||
Phase | Single phase with Ground | |||||
Power Factor | >=0.99 | |||||
OUTPUT | Voltage | 220/230/240*(1±1%)VAC | ||||
Frequency | 50/60Hz(Adjustable)
50Hz AC Mode: Follow AC Mode (AC Range 46~54Hz); Battery Mode: 50Hz(1±0.1%) 60Hz AC Mode: Follow AC Mode (AC Range56~64Hz); Battery Mode: 60Hz(1±0.1%)
| |||||
Wave Form | Pure Sine Wave | |||||
Power Factor | 0.8 | |||||
Harmonic Distortion | =<2% THD (Linear Load), =<6% THD (Non-Linear Load) | |||||
Overload Capacity | Normal when load < 105%; 105%-125% for 1 min, 125%-150% for 30sec | |||||
Current Crest Ratio | 3:1 | |||||
Connections | Terminal block | |||||
Efficiency | To AC Mode | 88% | ||||
To Battery Mode | up to 90% | |||||
Battery | Type | Sealed free maintenance lead acid battery | ||||
Nominal DC voltage | Built in batteries 12v7.2ah*16pcs | 192VDC | 192VDC | |||
Quantity | 16pcs | 16pcs | Depends on requested back-up time | Depends on requested back-up time | ||
Back-up Time (Full load) | >=7 min | >=5 min | Depends on the capacity of external battery bank | Depends on the capacity of external battery bank | ||
Recharge Time | 7 hours to 90% | Depends on the capacity of external battery bank | Depends on the capacity of external battery bank | |||
Charge current(MAX) | 2.0A | 4.2A or 8A | 4.2A or 8A | |||
Charge voltage | 220Vdc ± 1% | |||||
Bypass | Automatic Transfer | On overload and UPS failure | ||||
Before UPS Power-on | Default "ON" user adjustable to "YES" | |||||
Transfer Time |
| Zero | ||||
Indicators | LCD Display | UPS status, I/P & O/P voltage& frequency, Battery voltage, Battery capacity, Loading, Fault code | ||||
Audible Alarm |
| Bypass, On battery mode, Battery low, Overload, Fault | ||||
Acoustic noise | At 1 meter distance | <55dB | ||||
Communications | Intelligent RS232 serial port | Windows 98/NT/2000/XP/2003, Linux, Sun Solaris, IBM Aix, Compaq True64, SGI IRIX, FreeBSD, HP-UX, and MAC | ||||
SNMP (Optional) | Power management from SNMP manager and web browser | |||||
USB (Optional) | Windows family software and Mac OS | |||||
Environmental | Operating Temperature | 0~40 °C | ||||
Operating Humidity | 20~90% ( Non Condensing) | |||||
Weight | Net weight (kg) | 84 | 93 | 35 | 38 | 35 |
UPS Dimension | L*W*H (mm) | 570*260*717 |
- Q: How many can you bring with 220V? How many can you bring with 380V? There are 3 terminals on the transformer. There are 220V, 380V, 0, three terminals. 220V is the 220V terminal and the 0 connection. How can the 380V be connected? Is it 380V and 0 or 380V and 220V?
- Voltage x current = power, in general we are using the total power of 2/3, you can press this type of calculation, if the installation of electrodeless lights, the line should be separated,
- Q: Why is elevator lighting transformer installed?
- 9.4.5 well distribution shall comply with the following requirements:1 the elevator hoistway shall be dedicated to the elevator, and no equipment, cables and other devices related to the lift shall be installed in the hoistway.2 the well shall be provided with illumination, and the illumination shall not be less than 501x, and shall comply with the following requirements:
- Q: Is the substation separate from the power and illumination transformer?
- The power and lighting power supply in the substation need not be separated. In a large capacity power plant, the lighting can be electrically powered to ensure that the generator is stopped. The lighting source is often separated from the lighting transformer and powered by other power supplies.
- Q: 3 24V100W lights, I need to use a large capacity transformer (220V change 24V)?
- First look at this lamp,.24V100W, this specification is common in the headlights of large trucks, filled with inert gas, known as the small sunThe power supply comes from the generator or battery, and the mode of operation is to ignite by alternating current and direct current. In comparison with the power supply of the transformer, the method of alternating current ignition is better to save the cost and reduce the cost
- Q: Does the lighting work properly? Doesn't that power equipment start voltage unstable?
- Connection mode:N circuit breaker is caused by breaker of outlet line of transformer main cabinet.The branch circuit breaker divides the power, the electricity and the lighting power.
- Q: How is the lighting power of the 380V transformer calculated?
- The transformer (Transformer) principle should change the AC voltage of the primary coil, the main component of the device level by using electromagnetic coil core (core) main functions: voltage transformation, current transformer, impedance converter, isolation, voltage regulator
- Q: Can the 500 volt lighting transformer be changed into an electric welder?
- The structure of the electric welding machine is different from that of the transformer, and the magnetic gap of the iron core can be adjusted so that the welding current can be changed. In addition, the output voltage of the welder is also soft
- Q: Which is more energy saving by using 24V500W transformer lighting and 220V500W lighting?
- If the transformer is not calculated, the loss is the same. If the calculation is the latter, save electricity.
- Q: Lighting, lights, transformers, bulb brightness is too low, what's the matter?
- If you share a power line, you must calculate the current and select the appropriate wire to ensure normal pressure drop and safe use.
- Q: How to calculate the rated capacity of small transformers for lighting purposes?
- If the flow of large capacity motor starting current and welding machine, large current flows in a short period of time in the load even when the power equipment capacity can withstand current flow in a short time, but due to a voltage drop excitation electromagnetic switch relief, the motor can not start, damaged or the undesirable phenomenon of welding. Therefore, the voltage drop rate should be calculated as less than 10% of the supply voltage, as calculated below.
1. Manufacturer Overview
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b) Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Parallel Redundancy UPS Power System
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 Unit pc
- Supply Capability:
- 1000 Units per Month pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords