• Painted H Frame Scaffolding Size: 1219*1930mm System 1
  • Painted H Frame Scaffolding Size: 1219*1930mm System 2
  • Painted H Frame Scaffolding Size: 1219*1930mm System 3
  • Painted H Frame Scaffolding Size: 1219*1930mm System 4
Painted H Frame Scaffolding Size: 1219*1930mm

Painted H Frame Scaffolding Size: 1219*1930mm

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
10000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Painted H Frame Scaffolding Size: 1219*1930mm


Description:

Size: 

1219*1930mm, 1219*1700mm, 1219*1524mm, 914*1700mm


Diameter of tubes: 

Main tubes:42mm* 2mm  Small tubes:25mm*1.5mm


Thickness of tube: 

1.6-3mm.


Type: 

Walk-through frame, Ladder frame.


Details:

Surface treatment: dip painted, powder coated, electro galvanized, hot dip galvanized.

MOQ: one container, sample is available.

Experience manufacturer, 90% products are exported to international market.

Customized sizes are also available, pls inform the size and drawing.


Specifications

1)EN12810,SGS certificate 
2)High safety, stable, durable 
3)Finishing:HDG,Gal,Paint,Powder coated 
4)Real factory


Pictures

Painted H Frame Scaffolding Size: 1219*1930mm

Painted H Frame Scaffolding Size: 1219*1930mm

Painted H Frame Scaffolding Size: 1219*1930mm



Q:I've wanted an industrial/scaffold piercing for ages! My mum is finally looking into letting me have it done. Any advice about it? How can I hide it for school? What's the healing time? :) thank you for any feed back.
no its sixteen interior the united kingdom for any variety of ear piercing sixteen with out parent permssion and it will harm rather undesirable take a protracted time to heal and it will value approximately ?35-?40 and clean it with salt water.
Q:Standard for inspection of portal scaffolding
The inspection results are summarized in table NO:2008JW1658 serial number of inspection items and standard units of measurement test results 1# 2# single judge 1 Materials: 1.1 qualified door frame and accessories in addition to special requirements, the material should be consistent with the provisions of the Q235 according to GB/T 700
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Construction scheme and technical measuresAccording to the actual situation of the 1.1. design drawings and combined with the content of the project construction site, the project arrangement of small water method construction work construction, construction division order: positioning line - based project main project - - - Roof Engineering Decoration Engineering hydropower installation engineering - completion of cleaning, acceptance, delivery. Positioning of engineering survey according to the plan and the total construction plan.
Q:What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Q:What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
(2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The entire frame cannibalize speed is 3 ~ 5 times faster than conventional, faster effort to fight demolition, workers with a hammer to complete all assignments, to avoid the inconvenience caused by bolt operation; (3) with strong: the main components are the ordinary steel tubular scaffolding steel pipe, steel pipe connecting fastener with general availability in general, strong.
Q:The basic form of external scaffolding
Basic structureA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
More recently asked scaffolding people, I made a standard answer to see if you have any useful (already adopted)
Q:What's an antonym for the word scaffold?
I don't think there is one. 'Scaffold' is a noun but, with the exception of gender nouns (egs boy/girl; man/woman) it's verbs, adjectives, adverbs and prepositions that can have true opposites.
Q:1.How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
Q:Which loads are considered in the design of the scaffold
The variable load of the scaffold shall contain the following contents:1) construction load: including the personnel, equipment and materials, etc.;2) wind load.Safety code for construction of steel tubular scaffold with couplers JGJ130-2011

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords