• Multifunctional Scaffolding System-Outrigger Stabilizer CNBM System 1
  • Multifunctional Scaffolding System-Outrigger Stabilizer CNBM System 2
  • Multifunctional Scaffolding System-Outrigger Stabilizer CNBM System 3
Multifunctional Scaffolding System-Outrigger Stabilizer CNBM

Multifunctional Scaffolding System-Outrigger Stabilizer CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: CRS-OR

  • Type: Scaffolding Parts

  • Scaffolding Part Type: Scaffolding Stabilizer

  • Material: Steel

  • Surface: Powder coated

  • Size: 18" and 24"

Multifunctional Scaffolding System-Outrigger Stabilizer CNBM

Packaging & Delivery

Packaging Details:pallet

2.Product Description

Model No: FAS-SP

Model Name: Scaffolding System-Steel Plank Board

 

3.Features:
1) Dimensions (Lx W ): 730x 320mm, 1090x320mm, 1400x320mm,
1570x320mm, 2070x320mm, 2570x320mm, 3070x320mm,
4140x320mm
2) Made of steel channel and 2mm thickness steel plate
3) Weight: 6.0/8.4/10.6/11.6/15.0/18.2/21.5/29.8kg
4) Used in facade scaffold systems
5) Surface: paint, cold dipped galvanized or according to customer's requirements

 4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q:What is the distance from the external walls of the scaffolding and scaffolding?
Under normal circumstances, horizontal horizontal bar extension does not exceed 300mm
Q:There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
Q:for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q:How to do a good job of typhoon during the mass transfer mobilization work
strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q:Sprinkling water on the construction helps to help reduce haze days
to strengthen the possible production of dust material management, bags of cement, fly ash, lime and other handling and use of the process, should avoid falling from the height, Put, should not be forced to beat in the cutting tiles, concrete and other bulk materials used wet method the construction site of the road, gravel and other building materials yard and other operating areas, continuous wet ground in the dry, often sprinkle water, keep the dust is not up bulk materials, construction waste must be in accordance with the provisions of the implementation of vehicle closed transport, loading and unloading is strictly prohibited volley scattered To strictly control the dust of the mixing machine Scaffolding and other facilities to be removed after the first dust removal, and to be removed when someone was monitoring safety and environmental protection Second, the dust management living area canteen stove as far as possible the use of liquefied petroleum gas, gas and electricity, shall not use wood and bamboo, etc, to reduce dust pollution the site is strictly prohibited incineration of waste and waste materials and linoleum, plastic, etc, in person to clean up garbage the scene is not allowed to melt asphalt, to prevent emissions and dust pollution the scene of cement into the library to prevent dust, pay attention to control the cement library purchase volume Third, the sound of environmental management (a) sound environmental management strict control of construction noise, noise emissions should be consistent with the state's "construction site environmental noise emission standards" (GB-90) should be scientific and reasonable arrangements for operating time, must be at night construction, according to the provisions of the construction permit, reduce construction noise
Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
the preparation of construction organization plan, according to the characteristics of the construction of the rain, will not be the construction of the sub-project in advance or delayed construction
Q:For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
Hello, "farmers from the building, the most important is the quality and safety
Q:my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
Q:what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
Historical a place with alot of history attached to it Landmarks

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords