• Max theoretical 80m vertical height concrete pump 30m3 every hour output System 1
Max theoretical 80m vertical height concrete pump 30m3 every hour output

Max theoretical 80m vertical height concrete pump 30m3 every hour output

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

  • Condition: New

  • Power Type: Diesel

  • Weight: 3500kgModel

  • Model Number: HBTS15-6-33R

  • Power(W): 33kw

  • Dimension(L*W*H):4300*2060*3680(mm)

  • Certification: ISO certificate

  • Warranty: 3 years

  • After-sales Service Provided:

  • Overseas third-party support available

  • hopper capacity/filling height: 0.3/1100

  • Max.aggregate diameter: 30

  • Feeding Height: 1100mm


Packaging Details:the standard exprot package
Delivery Detail:15 days


Specifications

80m vertical height concrete pump
* Professional team
* Perfect quality.
* Perfect service idea
* Competitive price.

Item

HBTS15-6-33R

HBTS20-8-37R Max. Theoretical Concrete Output (m3/h)

15

Max. Concrete Pumping Pressure(Mpa)

6

Distribution valve

S Valve

Conveying tube inner Dim(mm)

100A/80A

Max. Theoretical Conveying Distance (Horizontal Distance/Vertical )(m)

150/80

Concrete Bore*Stroke

140*700

Hopper Capacity/ Filling Height (m3/mm)

0.4/1100

Maximum aggregate size(mm)

30

Concrete slump range(mm)

120-230

Main motor powder(kw)

33

Rated speed(r/min)

1480

Fuel tank capacity (L)

500

Cleaning mode

High pressure washing

Dimension(mm)

4500*1500*1800

Total Weight (including oil)(kg)

3500

Our Advantages and services:

Factory directly supply.

Professional sales team and experienced workers.

Competitive price according to good raw material purchasing ability,and high work efficiency

Good  after-sales service

Power system

Hydraulic oil pump: Germany Rexroth or Japan Kawasaki are adjusted.

Diesel power: Germany Deutz, Weichai, Schneider, Japan Siemens, Mitsubishi are adjusted.

The main power could be adjusted by the user


Electronic control system

Japan Mitsubishi Programmable Logic Controller (PLC) electronic control system.

Main electric elements are imported original Schneider, Siemens, OMRON, LG etc.

The control mode: manual operation and wireless remote control

Humanity and intelligent electronic control system optimizes the person-machine interface.8-digital pumping time accumulation timer provides exact data for the user, Automatic anti-pump function and optimized program design. Automatic trouble monitoring function.


Hydraulic system

The unique open hydraulic system and hydraulic cushion technology contribute to the smaller exchange impact

and less heat of the system. Meanwhile, with the famous brand of main pump and hydraulic valve, the safety and reliability of the concrete pump are guaranteed.

The hydraulic pipeline selects the high performance seamless steel pipes and all pipe joints and high-pressure hoses are of  the famous brands.

A number of high pressure accumulators and their excellent cushion performance reduce the requirement of S

pipe vale for the concrete. The concrete is delivered freely.


Pumping system

Pumping displacement variable adjustment: Change the pumping displacement according to the construction to meet the requirement of the condition.

Reducing design of the hopper could release the reducing pressure of the concrete into the delivery pipe

maximally, and prolong the service

life of the S pipe outlet.


Lubrication System

The patented central automatic lubrication system comes with a piston grease-pump, features high pressure and reliability, which can realize automatic lubrication of piston. The filters at the

outlet and the inlet of oil ports as double protections guarantee the system reliability.


Cooling System

Compulsory air-cooled heat exchanger keeps the temperature of the hydraulic oil below 60 degree, that ensures the whole hydraulic system works at normal status.


Q: When the concrete pump in the transport of concrete before the pipeline should be what lubrication
Usually with water for lubrication, we mentioned a mortar, in fact, the scene is difficult to have such a situation, specifically for you to prepare mortar.
Q: Why does the concrete pump main cylinder check valve damage cause the cylinder stroke to be short and the pumping is weak?
The rod can not return to the specified position, long-term operation will cause the master cylinder stroke becomes shorter, if the stroke becomes shorter, generally through the pressure to make the cylinder piston rod reset to fully extended
Q: What is the performance of the 60-type concrete pump?
Distribution valve type S pipe valve (integral casting)Concrete cylinderBore × travel mm 200 × 1650 specifications:
Q: What parts are concrete pump parts?
The conveyor mechanism consists of two master cylinders, water tanks, commutation devices, two concrete tanks, two concrete pistons, hoppers, distribution valves (S-shaped valves), swing arms, two swing cylinders and outlet.
Q: What are the requirements of the concrete pump?
8, the transfer of concrete pump should pay attention to safety requirements, should be consistent with product specifications and the relevant provisions of the standard.
Q: 90KW concrete pump should be used in the number of generators?
You should use 250KW unit, in order to ensure that your normal operation of the equipment foolproof.
Q: What is the diameter of the concrete pump tubing?
Pump tube is generally divided into 125 and 150 two, diameter is 125mm and 150mm.
Q: Why concrete pump down to play always block the tube
do not for the convenience of the construction to enlarge the slump, down to fight the concrete The greater the slump, the easier it is to block
Q: What is the meaning of cast - in - place concrete secondary grouting?
Cast concrete is cast at the construction site. Unlike prefabricated concrete, most buildings are constructed using cast-in-place concrete.
Q: How to deal with pumping concrete pump pipe pipe burst after the burst, the pump can not stop the situation?
More stupid, and if the replacement of more than an hour, it may be very unskilled.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords