Lost Cost Prefab House
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 20000㎡ m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
This product belongs to Module System structure.
The structure load is mainly borned by SFLC board. It builds high efficient, energy saving and environmental house which integrates construction,water heating electricity and a set of construction equipment.
Advantages:
1. Flexible combination
2. Easy transportation
3. Fast construction
4. Cost saving
5. Removable & recycle
6. Thermal Insulation
7. Seismic and wind resistance
Packing:
light steel packing: light gauge steel in bulk, decorate panel material in pallet, other fittings all in boxes, loaded into 40' GP and 20' GP on container.
- Q:How do steel tube couplers prevent slippage or loosening of scaffolding connections over time?
- To prevent slippage or loosening of scaffolding connections over time, specific design features are incorporated into steel tube couplers. These couplers are composed of a cylindrical body equipped with internal teeth or gripping mechanisms that effectively hold the tubes together. A primary method of preventing slippage is achieved by ensuring a tight fit between the tubes. By tightening the coupler, the tubes are compressed together, creating a strong connection that leaves no room for movement or slippage. This tight fit guarantees that the connection remains secure, even when subjected to heavy loads or vibrations. Furthermore, steel tube couplers often incorporate a locking mechanism to enhance the stability of the connection. This can take the form of a bolt or a pin that is inserted through the body of the coupler, effectively locking the tubes in place. This additional measure provides an extra layer of security, preventing any potential slippage or loosening over time. Moreover, steel tube couplers are typically constructed using high-quality and durable steel materials. These materials are renowned for their strength and resistance to wear and tear. The durability of the couplers ensures that they can withstand the forces and pressures exerted on scaffolding connections over time, without compromising their performance. In conclusion, the prevention of slippage or loosening in scaffolding connections is achieved by steel tube couplers through the implementation of a tight fit between the tubes, the incorporation of a locking mechanism, and the utilization of durable materials. These features work in harmony to establish a stable and secure connection that can withstand the demands of construction, thus ensuring the safety of workers.
- Q:we've boarded out our eves in our attic and filled the gaps and screwholes with polyfilla. i'm a bit skint at the moment and the plasterer don't come cheaply! so i was thinking of painting straight onto the plasterboard just to make it look a bit tidyer. which would be the best way?, would i need to seal it first and if so how? Would normal emulsion work or would i need to use something else? thanks
- use 1-2 coats of a PVA (Poly Vinyl Acetate) primer. then paint however you like.
- Q:What is the purpose of using geocomposites in subsurface irrigation systems?
- The purpose of using geocomposites in subsurface irrigation systems is to enhance the efficiency and performance of the irrigation system. Geocomposites help in distributing water uniformly throughout the soil, preventing clogging and improving water infiltration rates. They also aid in reducing evaporation, minimizing weed growth, and promoting healthier plant growth.
- Q:How does steel frame formwork affect the overall construction schedule?
- Steel frame formwork can have a significant impact on the overall construction schedule. One of the main advantages of steel frame formwork is its ability to be assembled and disassembled quickly and easily. This means that the formwork can be set up and taken down faster than traditional formwork methods, such as timber or plywood. Consequently, this can help to reduce the overall construction time. Additionally, steel frame formwork provides a high level of accuracy and precision in the construction process. The rigid and sturdy nature of steel ensures that the formwork maintains its shape and position, resulting in consistent and accurate concrete structures. This eliminates the need for rework and adjustments, saving valuable time in the construction schedule. Furthermore, steel frame formwork is highly durable and can withstand the pressures and forces exerted during the concrete pouring process. This durability reduces the risk of formwork failure or damage, which could cause delays in construction. It also allows for multiple reuses of the formwork, further optimizing the construction schedule and reducing costs. Moreover, steel frame formwork is compatible with various construction techniques, such as precast and cast-in-place methods. This flexibility allows for seamless integration into different construction phases, saving time and ensuring a smooth construction process. In summary, steel frame formwork has a positive impact on the overall construction schedule due to its quick assembly and disassembly, accuracy, durability, and compatibility with different construction techniques. These benefits result in time savings, reduced rework, and improved efficiency, ultimately leading to a faster completion of the construction project.
- Q:In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
- Aluminum alloy metal shell better than the plastic shell; we all know that most of the market is now charging the lithium battery, lithium battery is the only drawback is the possibility of a long time with the explosion, so the use of aluminum Alloy shell, much better than steel; polymer battery is good, but the price is expensive,
- Q:What kind of glass wool is used for most buildings?
- Ask the dealer for product descriptions, and you can search its specifications and parameters and then design based on the performance specifications of specific products. I suggest you first determine which brand of thermal insulation cotton to use, or check if the number is in the tolerance range of national standards of the manufacturers, of course, it is a relatively wide range. I recommend Owens Corning ultrafine glass fiber insulation cotton.
- Q:Can steel props be used for temporary support during column installation?
- Steel props are an effective option for temporary support while installing columns. Construction frequently employs steel props to offer temporary support to structures. These props are adjustable and can be easily installed and removed as necessary. When installing columns, steel props can provide extra support and stability, guaranteeing a safe installation process. They can be adjusted to the desired height and securely fastened in place to provide temporary support until the column is correctly installed and capable of bearing the load. Steel props serve as a dependable and affordable solution for temporary support during column installation.
- Q:How is steel formwork disassembled?
- Steel formwork is typically disassembled using a systematic approach to ensure safe and efficient removal. The process involves several steps: 1. Inspection: Before disassembling the steel formwork, it is crucial to inspect the structure for any signs of damage or wear. This helps identify any potential hazards and allows for necessary repairs or replacements before starting the disassembly process. 2. Removal of accessories: Start by removing any accessories attached to the steel formwork, such as scaffolding, support beams, or tie rods. These accessories are often essential for the stability of the formwork system, so their removal should be done carefully and in a controlled manner. 3. Removing concrete debris: Next, remove any concrete debris or remnants that may have adhered to the steel formwork. This can be done using tools like hammers, chisels, or wire brushes. Proper cleaning of the formwork ensures smooth disassembly and prevents any future complications. 4. Dismantling panels: Begin dismantling the steel formwork panels one by one. This is typically done by removing the connecting pins, bolts, or screws that hold the panels together. The order of disassembly should follow the reverse order of the assembly process, starting from the top and working downwards. 5. Handling and storage: As each panel is disassembled, it should be carefully handled to prevent any damage or injury. Once disassembled, the panels should be properly labeled and stored in a designated area to ensure easy retrieval for future use or transportation. 6. Post-disassembly inspection: After the steel formwork has been completely disassembled, it is important to conduct a final inspection. This allows for the identification of any damaged or worn-out components that may require repairs or replacement before the next use. Overall, the disassembly process of steel formwork requires careful planning, attention to detail, and adherence to safety guidelines. Following these steps ensures the proper removal of the formwork while maintaining the integrity of the structure and ensuring the safety of workers involved.
- Q:Does anyne know where I can buy dental cement for a loose crown in Montreal, Canada. Have looked everywhere, none of the pharmacies seem to have it.Thanks
- I saw a tool on T.V. that fixes hard to fix things with a glue that drys under a blue light . I am going to try to fix my broken molar . It is 10 to 20 dollars depending where u buy it.
- Q:Can steel props be used for supporting temporary stages or platforms?
- Yes, steel props can be used for supporting temporary stages or platforms. Steel props are strong and durable, making them suitable for providing stable support to structures such as stages or platforms, ensuring the safety of performers and attendees.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Lost Cost Prefab House
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 20000㎡ m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords