Lorry-mounted Crane, Articulating boom lift
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 100 PCS/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Maintenance instruction
The crane truck is a kind of equipment which is used to lift, turn and haul the goods through hydraulic lifting and expansion system. It is usually assembled on the truck. Generally, it consists of truck chassis, cargo box, power grab and crane.
Because the lorry-mounted crane is a special vehicle, the operator should accept the manufacturer's guidance, training, performance of the vehicle structure, know enough knowledge about it , and get a lorry-mounted crane operation or maintenance experience before operating the machine from the manufacturer . the lorry-mounted crane product specifications in operation and maintenance from Manufacturers is an essential information of the lorry-mounted crane operators operating equipment, before operating the machine, be sure to read the use of the lorry-mounted crane maintenance manual, operate according to the requirement of the specification and maintenance lorry-mounted crane. As long as the operator attaches importance to and in accordance with the requirements of lorry crane manufacturer period for maintenance and maintenance, can reduce the accessory crane early failure, prolong service life, improve the working efficiency, let lorry crane to bring you the biggest benefit. At the same time, the lubrication of each lubrication point should be strengthened, except for special requirements of lubricating points in each class during the grinding period. Therefore, it is easy to cause the wear and tear of the parts (especially the surface) during the suspension of the car.At this time, if overload operation, it can result in the damage of the parts, make the car crane has an early failure.
Notes:
1):Understand the size of lifting goods, find the distance between the center of the cargo center and the center of the crane, and check the hoisting capacity parameters according to the distance.
2):The lifting capacity of crane (moment) is fixed and the working radius of crane is larger.The lighter the lifting, the smaller the working radius and the heavier the lifting.(the working radius is the horizontal distance of the torque center to the hook.)
3):Considering the hoisting size of the crane and the bearing capacity of the chassis size, the bigger the bigger beam is the better, the crane is bigger and the chassis is smaller, which can transform and break the girder.The chassis is small, the power of the engine is small, affecting the lifting capacity of the crane.
Safety
Bilateral can switch operation, which is easy to view crane. It is safer and humanization
High-quality component, quality guarantee, strong university, convenient switching, safe operation
The rotation-proof impact device is mounted that can protect safety of vessel.
Reliable
It adopts to floating three point structure design which can quite reduce appending capacity of chassis frame.
The complete machine counterparts adopts to dislocation leg structure with strong bearing capacity and max. Span of legs.
The complete machine adopts to advanced research and development technology with reasonable structure and reliable performance.
Efficient
Straight jib crane adopts to inner installed single cylinder rope-arranging mechanism, which can be in synchronization telescope.
Appearance of jib is concision and the telescopic rate is high.
Unitary hoisting mechanism, stable hydraulic system and efficient hoisting.
Stability
It adopts to high-strengthen steel with compact structure, light weight, small installation space and stable mechanical property.
It is hexagon hook structure with great neutral and better resistance to bending.
It is the first company adopting to first-classic worm gearing rotary mechanism with reliable rotation.
Item | Information | Unit | SQ3.2ZA3 | SQ5ZA3 |
Specification | Rated hoisting capacity | kg | 3200 | 5000 |
Rated load moment | KN.m | 67.2 | 110 | |
Number of telescopic boom | 3 | 3 | ||
Max.Operational span | m | 8.8 | 10.1 | |
Max.Lifting height | m | 10.2 | 11.8 | |
Basic length of boom | m | 4.15 | 4.59 | |
Total length of boom | m | 7.3 | ||
Cross section of cargo boom | / | Hexagon | Hexagon | |
Methods of telescopic | / | Contraction sequence | Contraction sequence | |
Range of span angle | ° | 0-75 | 0-75 | |
Rotation of angle | ° | 370 | 360°serial rotation | |
Size | Width of crane
| mm | 700 | 841 |
Span of legs | m | 2.18-3.46 | 2.24-5.24 | |
Weight of crane | kg | 1.45 | 2.32 | |
Rated pressure | Mpa | 22 | 25 |
Unit | SQ2SA1 | SQ3.2SA2 | SQ4SA2 | SQ5SA2/S/SQ3.2ZA2 | Q5SA3/SQ3.2ZA
| |
Rated hoisting capacity
| kg | 2000 | 3200 | 4000 | 5000 | 3200 |
Rated load moment | KN m | 42 | 70 | 100 | 125 | 68 |
Max. Magnification of hook | 4 | 4 | 4 | 4 | 0/4 | |
Max.Operational span
| m | 3.5 | 7.36 | 7.9 | 8.7/11.1 | 7.1/8.8 |
Max.Lifting height | m | 3.9 | 8.55 | 8.89 | 9.76/12.1 | 8.88/10.4 |
Basic length of jib | m | 6.64 | 7.55 | 7.93 | 8.65/10.85 | 7.15/9.05 |
Number of telescopic boom | / | 2 | 3 | 3 | 3/4 | 3/4 |
cross section of cargo boom | / | Hexagon | Hexagon | Hexagon | Hexagon | Hexagon |
Methods of telescopic | / | Synchro | Synchro | Synchro | Synchro | Synchro |
Range of span angle
| ° | 0-70 | 0-76 | 0-70 | 0-76 | / |
Rotation angle | ° | Full rotation
| Full rotation | Full rotation | Full rotation | 370/410 |
Installation space | mm | 600 | 860 | 860 | 900 | 900 |
Span of legs | m | 2.12-3.62 | 2.12-3.62 | 2.12-3.62 | 2.12-3.62 | 2.10-3.50 |
Weight of crane | kg | 430 | 1220 | 1320 | 2200/2300 | 16350 |
Max.flow | L/min | 60 | 60 | 60 | 60 | 30 |
Rated pressure | Mpa | 20 | 20 | 20 | 22 |
No | Type | Lifting capacity | Form of jib | Number of jib | Operational methods | Telescopic methods of leg | Back legs | Load limit | Head lamp | Other feature | Non-critical feature | additional | |
1. | SQ | 2 | SA | 2 | manual | Auto | Yes | Yes | Yes | Form of cross section | Quadrangle | Alarm for rotation | |
2. | 3.2 | ZA | 3 | electrical | Manual | No | No | No | Pentagon | Manual pump | |||
3. | 4 | 4 | Hexagon | Rotation indication | |||||||||
4. | 5 | 5 | U shape | ||||||||||
5. | 6.3 | With hoist or not | Yes | ||||||||||
6. | No |
- Q: Analysis of China's domestic machinery industry
- The machinery manufacturing enterprise is a very complicated enterprise. At present, there are many problems in the management, which is very unfavorable to the fierce market competition environment. Using information technology to achieve management innovation, institutional innovation and technological innovation, and raise the management level is unquestionable. This paper describes the characteristics of mechanical manufacturing enterprise informatization management, from three aspects of management thought, the performance requirements of ERP system and software development platform on the technology development trend, discussed the CRM, SCM, the relationship between ERP, ERP reference for software vendors to develop software and machinery manufacturing enterprises informatization project.
- Q: What are the major related courses in the university?
- Now the mechanical profession into mechanical and electrical integration (the professional technology is relatively balanced, electrical, machine, Electronic Science) (the CNC automation professional electrical and electronic science, programming) mold design and manufacturing (the professional I do not say it!) Mechanical design and manufacturing (more extensive) PLC automation programming (this technology is specialized in learning electricity) Probably these professions too.
- Q: If I were looking to start a small hospital in a poor country that was capable of doing surgery and providing basic care, how much would the machinery and supplies cost?
- A LOT OF MONEY
- Q: What kinds of construction machinery are needed for urban landscaping?
- Landscaping projects are mainly used in construction machinery: sprinkler, lawn mower, sprinkler, excavators (general backhoe and small green excavators), cranes and so on
- Q: the flow for the maintenance procedure of a machinery starts from technician's procedure untill reach the management department for the maintenance implementation and deal between the spareparts suppliers??
- Clarify your question please. I don't know what you are asking.
- Q: Wong Industries is depreciating the value of its machinery over a thirty-year life. Its original value was $1,000,000 and it is assumed to have a scrap value of $100,000. After 20 years, it is decided that the machinery still has another 20 years of life but it will then be worth nothing. Find a piecewise linear function that describes the broken-straight-line depreciation that the company is using.Please explain how you came up with your answer! Thanks
- Since it originally had a lifespan of 30 years, it will lose $900,000 in 30 years, or $30,000 per year. V(t)=1,000,000 -30000t for the first 20 years. It's lost $600,000 in value and still is worth $400,000, but this will all go away after another 20 years or $20,000 per year... V(t)=400,000-20,000t for t between 20 and 40 years. I'll leave it to you to format this correctly :)
- Q: mainly in construction.
- any kind of computerized machinery will cut down on man labor and add efficiency
- Q: i need this answer its urgent
- you can't do that job by using any air craft. please use a space craft.
- Q: Tax Identification for Rite-Way Machinery, Stuart, FL?
- Rite-Way okorder - Just do on-line searches and document images and then coporations, trademarks, limited partnerships and limited liability companies Hope that helps!
- Q: A 20kw,200V shunt generator is operated at rated load. if the driving engine is developing 30bhp (break horse power), determine the iron and friction losses.PLease use all the given data above..thanksAnswer is IFL=1039W.Thanks a lot.
- 1 horsepower = 0.74569 kw
Send your message to us
Lorry-mounted Crane, Articulating boom lift
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 PCS
- Supply Capability:
- 100 PCS/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords