Large Concrete HC Slab Machine with Loading Capacity
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Large Concrete HC Slab Machine with Loading Capacity
1. Structure of Large Concrete HC Slab Machine with Loading Capacity:
Products of this series (non-circular and circular cored) are the ideal machines for making building materials on constructions of large span and heavy load bearing in factories, schools, hospitals, shopping centers, office building and homes.
Our hollow core slab machines have the advantages of reasonable design, easy operation, convenient maintenance and long working life. Slab length can be achieved to 4.2m to 18m; width of 600mm, 900mm and 1200mm; thickness of 120mm, 150mm, 180mm, 200mm, 250mm, 300mm, 380mm.
The hollow core slab machines are working on the long-line table, tensioning the high-strength and low-relaxation steel strand first, and using the pushing work method to form the concrete hollow core slab. The slabs which being formed have the advantages of smooth surface and high-density structure.
2. Main Features of Large Concrete HC Slab Machine with Loading Capacity:
• One machine can make one slab lower cost, high Wear-resistant, long service life.
• In case of quality problem the company provide free replacement.
• Provide technical support for free.
• Provide consumers with regular visits
• Simple structure, easy operate, less wear parts
3. Large Concrete HC Slab Machine with Loading Capacity Images:
4. Large Concrete HC Slab Machine with Loading Capacity Specification:
Type | Aperture & diameter | Number and diameter of wires | Max span | Total power | Productivity (m/min) | Max. Load (KN/m2) | Overall dimension (mm) | Weight (kg) |
GLY180-1200 | 11/ peach | 12/9.5or12.7 | 9 | 18.5 | 1.1-1.3 | 16.16 | 2900X1500x1200 | 3300 |
GLY200-1200 | 8 /peach | 10/9.5or12.7 | 10 | 22 | 1.1-1.3 | 13.22 | 3700X1550X1550 | 5300 |
GLY250-1200 | 8/ peach | 10/12.7 | 12.6 | 33 | 1.1-1.3 | 11.1 | 3700X1550X1500 | 6200 |
GLY300-1200 | 6 /peach | 8/12.7 | 15 | 40 | 1.1-1.3 | 10.83 | 3700X1550X1500 | 6900 |
GLY380-1200 | 8 /rhomb | 8/12.7 | 18 | 39.2 | 0.8-1.0 | 12.27 | 4600X1850X1600 | 7500 |
Production Process
Rebar tensioning
Raw materials preparing
Molding
Our customers
5. Packing & Delivery
• Wire cables are used for fastening the machine on the trailer or inside the container.
• Machine covered with plastic film.
• Machines can be packed in tarpaulin or wooden case according to customer’s needs.
6. FAQ:
We have organized several common questions for our clients, may help you sincerely:
• What information we need to confirm with you before send a formal offer?
What kind of slab you want to make, wall panel, roof panel, lintel or something else?
Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.
• Have you use this kind of machine before?
Our machine is totally different from European machine. Please don’t follow their instructions.
• What kind of machine do you have?
Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component.
7. Our Service:
• We supply the technical supporting all the time.
• We supply one year warranty for whole machine.
• We supply free quick wear parts.
• We supply low charge continue maintenance when warranty is expired.
• We supply free training to end-users
- Q:find impeller for model 09576 central machinery pump(12 volt)?
- Check out this site
- Q:Machinery was purchased for $51,000 on January 1, 2009. Freight charges amounted to $2,100 and there was a cost of $6,000 for building a foundation and installing the machinery. It is estimated that the machinery will have a $9,000 salvage value at the end of its 5-year useful life. What is the amount of accumulated depreciation at December 31, 2010, if the straight-line method of depreciation is used? $10,020. $8,580. $17,160. $20,040.
- $20,040: (51,000+2,100+6,000-9,000) / 5 = 10,020 per year 2009 - 10,020 2010 - 10,020 Total = $20,040
- Q:I need a list of machinery, and the methods of how trees are cut down. Do they only use chainsaws? or are there bigger machines that cut faster and better? plz answer, im trying to create an accurate scene in a painting ( im in the planing stages).
- I'm okorder /
- Q:I am tired of politics and politicians and tired of liars with silky tongues merely seeking power and not in the best interests of the people.
- yes we are all tired of it. Now what do we all do sit back and just let it continue or speak out and say we are not going to take it anymore. It is all about choice this is still a free nation maybe it is time for the people to run the nation and get rid of all the politicians. we can vote on all the issues and toss out the senate and the congress too.
- Q:How come Chinese people make farming machinery whereas black African people do not and thus have famines?
- Dude, China is ancient. Chinese people were building maglevs while the rest of the world was still figuring out how to use flint to make fire.
- Q:He plans to invest $20 000 every six months in an investment account with a view to replacing machinery. What interest rate will he need to meet his goal?(either use present formula A= P *(1-(1+i)^(-n))/ i or future formulaS = P *( (1+i)^(n) - 1)/ i, im not sure wich formula to use)PLEASE SHOW ALL WORKING OUTplease help me ITS URGENT
- 250000=20000 *( (1+i)^(n) - 1)/ i i=4.88%
- Q:This is really our project to investigate, what's the significance of this and how it is done attractively? Yah, were going to defend it by the questions from the judges. What could be the possible questions? Does anyone have an idea? If you give me a detail answers, I will not refuse to give you 10 points.
- the significance would be it makes the farmer's easy for their work about that, you better study it
- Q:What are the main considerations when choosing mechanical parts?
- The impact of ambient temperature, changes in ambient temperature will affect the expansion and contraction of parts; parts of the surface quality requirements and corrosion requirements; cost factors;
- Q:ok someone help me how much is it for all the machinery to biuld a electric car its for my school project that we have to present to the UofA
- Hobbyists okorder
- Q:Shouldn't insurance companies start considering this when insuring businesses?
- If someone is weird or nutty, that does not mean the individual is not fully capable of operating heavy machinery. Or teach high school students, or be a doctor, or serve burgers at a fast food restaurant. Unless this is negatively affecting their work performance, there is no reason to stop them for operating heavy machinery. Many people have quirks that make them seem odd to us - whether that means wearing pink every day, talking to their cat, knocking on wood to avert bad luck, or praying aloud before speaking publicly. That doesn't mean that they will do something wrong.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Large Concrete HC Slab Machine with Loading Capacity
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords