KSL-Construction Kwikstage Scaffolding for sale
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | KSL | ||||
material: | steel Q235 | Type: | kwkstege system | surface treatment: | hot-dip galvanized |
Packaging & Delivery
Packaging Detail: | bundle packaging |
Delivery Detail: | within 30 days after receive 30% deposit |
Specifications
1.material : steel Q235
2.surface treatment: hot-dip galvanized,painted
3.Brand name: KSL
We are a professional scaffolding factory in Kaiping, Guangdong, we will offer you the best price and best quality products.
The used scaffolding system is composed of standard, ledger, diagonal brace, plank, etc.
We are an international group operating on a worldwide basis and are actively engaged in all phases of building and civil engineering industries.
We are recognized by the most prominent international contractors as one of the leaders in design, manufacture and services of all types of scaffolding, shore loading and formwork.
Basic Information
Product/Service (We Sell): | Standard,Ledger,Transom | |
Brands: | KSL | |
Number of Employees: | 51 - 100 People |
Trade & Market
Main Markets: | Oceania | |
Total Annual Sales Volume: | US$1 Million - US$2.5 Million | |
Export Percentage: | 91% - 100% |
Factory Information
Factory Size (Sq.meters): | 30,000-50,000 square meters | |
Factory Location: | ||
Number of Production Lines: | 5 | |
Number of R&D Staff: | Less than 5 People | |
Number of QC Staff: | 5 - 10 People | |
Contract Manufacturing: | OEM Service Offered |
- Q: I would like a scaffold piercing, but my parents aren't going to let me have two cartilage piercings at once. So, can they be done separately, as in weeks apart?
- Technically yes but it is better to have them done at the same time so the holes are aligned properly. It is better to get them done at the same time, as the second piercing will be less painful because you are all adrenalin-ed up! Probably cheaper too.
- Q: Scaffolding installation and precautions?
- When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
- Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
- Q: The role of the external scaffolding and the relevant provisions?
- Scaffolding outside the building in the construction of the building is an indispensable important tool for erection. Its role: first, can make the construction personnel in different parts of the operation of the high; two is to ensure the safety of construction personnel in the high altitude operation
- Q: The bottom of the cantilever scaffold must be provided with the sweeping rod
- Product quality certificate and inspection report. Rust must be replaced, not to be used to build the frame.
- Q: I couldn't believe it, but yes it happened...
- Physics worked in his favor. No God stuff. Really! Become an Atheist. Very simple. No God to fear. No dogma. A life more moral than that of Christians.(statistically proved) Subject to the rule of law by consensus of democracy not the autocratic law of a god. Death is not to fear nor rejoice. Its just like fading into a deep, untroubled sleep. Be happy. Treat people justly. The Truth Will Set You Free
- Q: I think that'd be extremely entertaining.
- new jack dont want to work with wwe
- Q: According to the standard set up double scaffolding scaffolding to the number of meters per square meter
- Once the calculation is qualified, you can according to the vertical distance
- Q: Find the demolishing scheme of scaffold
- Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
- Q: The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
- Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Send your message to us
KSL-Construction Kwikstage Scaffolding for sale
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords