KOBELCO Throttle Motor
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 pc
- Supply Capability:
- 500 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
KOMATSU Throttle Motor
APPLICATION
SK200-1/3/5
SK120-6
OEM:YN2406U197F4
APPLICATION:
SK200-6
SK200-6E
OEM:YN20S00002F1
YN20S00002F3
Excavator spare parts in full-scale are available;
100% quality assurance, develop and manufacture follow original ones;
Quick response within 24 hours ;
Small order allowed;
Reasonable stock and timely delivery;
Original packing, neutral packing or customized packing;
Positive customer feedback from abroad market;
Excellent After-sales service.
We also can supply the following spare parts:
1. Hydraulic Parts: hydraulic pump, main valve, hydraulic cylinder, final drive, travel motor, swing machinery, swing motor etc.
2. Engine parts: engine assembly, liner, piston, piston ring, cylinder block, cylinder head, crankshaft, camshaft, turbocharger, fuel injection pump, injector, starting motor and alternator etc.
3. Undercarriage part: track roller, carrier roller, track link, track shoe, sprocket, idler and idler cushion etc.
4. Cab parts: operator’s cab, wiring harness, monitor, controller, seat, door etc.
5. Cooling parts: radiator, oil cooler, air conditioner, compressor, after cooler etc.
6. Other parts: service kit, swing circle, engine hood, swivel joint, fuel tank, filter, boom, arm, bucket etc.
Delivery Time:
1. Generally, parts will be shipped out within 15 days after getting the receipt of payment.
2. If some parts are no stock and need to order, we will inform customers advanced.
3. Sometimes parts will be delay because of holiday or weather, please be patient, and keep in touch with us.
- Q: The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
- Pipe or direct protection, construction of special operation personnel of construction electrician training materials, focus on the "construction of special operations personnel management regulations", "construction of special operations personnel safety technology assessment program (Trial)", "construction of special operations personnel safety operation skills examination standard (Trial)" and other relevant provisions safety, technical knowledge and skills to master for construction electricians were explained, the book has 10 chapters, including: basic knowledge, common low-voltage electrical appliances and Motor City, power supply and grounding earthing protection system.
- Q: How are the machine parts stacked?
- Then there is a point to note, that is, from there to get used, must be put back where, so that will be organized, all things are owned by you, it will not mess.
- Q: What kind of electrical equipment do you have? What are the main components of each device?
- Electrical equipment, electrical parts, electrical equipment, electrical components: mainly refers to other construction equipment matching, power driven, electrical heating, electrical lighting, and other direct consumption of electricity and into other parts of energy. Such as: motor and electric heater and start control equipment, decorative lighting lamps and the switch socket, television communication and intelligent engineering for power supply and transformation or environmental protection dust and kitchen fume and other special DC power supply etc.
- Q: Where are the mechanical pressurization air supply facilities set up?
- When the smoke proof staircase and antechamber antechamber, fire elevator or common antechamber parts can be opened outside the window, can use the natural ventilation, resulting in a stairwell with or common antechamber in the use of natural smoke exhaust with pressurized air supply arrangement of diversified combinations, and the two exhaust can not be shared.
- Q: What are the mechanical drawing software?
- The plane is mainly CAD and CAXA, there are some non mainstream mechanical engineer what, mainly engaged in your spare parts of machinery industry, roughness, form and position tolerance requirements, recommendations for CAXA, which symbols are readily available, there are standard parts library, mechanical symbols library etc..
- Q: What is a door rack for a construction site? How high is it generally?
- Door scaffolding has not yet unified design and product standards, the products of different specifications, quality is inconsistent. Not only for construction units to use and management of great difficulties, is not conducive to the promotion of applications, but also to the construction safety risks. Therefore, it is necessary to organize and issue a unified standard for door scaffolding
- Q: Where are the hanging baskets for the building?
- It is strictly prohibited to use hanging baskets as vertical transport facilities for personnel and materials; no staff member is allowed to climb from a basket to a B basket
- Q: What are the construction materials, components, fittings and equipment in construction?
- 3. Equipment: a complete device which belongs to the unique function of each function of the construction project. There are systems, equipment and conventional equipment, such as: elevator, automatic fare collection, HVAC, gas fire protection, etc..
- Q: What are the sub projects of a construction project?
- Lime soil, sand and gravel foundation, geosynthetics foundation, fly ash foundation, dynamic compaction, foundation grouting, preloading foundation, vibroflotation foundation, jet grouting foundation, cement mixing pile foundation, soil and lime soil compaction pile foundation, cement fly ash gravel pile, cement soil pile foundation. Based on sand pile foundation
- Q: What is the difference and connection between equipment manufacturing and machine building?
- When our company went to the training center of the Department of industrial engineering of Tsinghua University, the professor of Qinghua University told us about it. Equipment manufacturing industry is a general term for the equipment provided for the national economy and national security
Send your message to us
KOBELCO Throttle Motor
- Loading Port:
- Guangzhou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 pc
- Supply Capability:
- 500 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords